查询词典 scaleboard
- 与 scaleboard 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the structural mechanics method, elastic thin wall column shell and thin slab theory is used in the computation, and consider two rigid conjunctions, adopt underground frame bending moment allotment method to admeasure the wall of a well and the scaleboard bending moment.
常规的结构力学方法使用弹性薄壁圆柱壳和薄板理论计算调压井井壁与底板,并考虑二者刚性连接,采用地下框架弯矩分配法对井壁和底板进行弯矩分配。
-
In the analysis the geology circumstance of 沁 water basin drills a hole data with what we control, we adopted to hang up to draw mountain west a set and too original set of the lord adopt coal seam to cover up deep equivalent line, the scaleboard elevation equivalent line the way of the diagram, appear the structure circumstance of research area at the diagram piece top body.
在分析了沁水盆地的地质情况和我们所掌握的钻孔资料,我们采用了勾绘山西组和太原组的主采煤层埋深等值线、底板标高等值线图的方式,来将研究区的构造情况在图件上体现出来。
-
Stainless steel scaleboard,copper lock bolt
不锈钢衬板,不锈钢锁舌
-
At last,a preliminary visual 3D model system for coal seam is established based on coal seem 3D model and using OpenGL and Vc~6.0.Currently a part of research results has been applied to Mine Survey Geological Information System(MSGIS3.0),including constrained triangulation of coal bed suface, coal bed scaleboard contours with fault,part encrypt of contours,excellent turn of triangle,space encrypt,any direction profile of coal bed and so on.
论文的部分研究成果已经应用于煤矿地质测量空间信息系统MSGIS3.0中,主要表现为通过煤层底板表面的约束三角剖分,实现了煤层底板等高线的断层处理、等高线的局部加密、三角形优化、空间插值、任意切割煤层剖面等方面。
-
Past design a 10 Ts four sign pillar pressure machine to flap spring coil to carry on dismantling to pack towards reduce, this pressure enters mainly from top plank module, scaleboard module, sign pillar, liquid to press system, small car module and some special partses, according to work need but design.
故设计10T四立柱压力机对减振弹簧进行拆装,本压力机主要由上板组件、底板组件、立柱、液压系统、小车组件及一些特殊部件,根据工作所需而设计的。
-
Experiment through a water work model to the figure which turn on water tower from the hydraulics angle, from the hydraulics angle to the figure structure which turn on water tower and turn on water hole carry on a verification with excellent turn, emphasize research to turn on water tower dissimilarity under the size circumstance of the figure structure of enter the water bore water current flow Tai and release excessive water ability, water current to press a strong circumstance towards turn on water tower tower wall, scaleboard creation of pound at, and put forward more and so releasing excessive water circulate to adjust one degree way.
从水力学角度对放水塔的体形通过水工模型试验,从水力学角度对放水塔、放水洞的体形结构进行验证和优化,着重研究放水塔不同体形结构尺寸情况下的进水孔水流流态、泄洪能力、水流对放水塔塔壁、底板产生的冲击压强情况,并提出较好的泄洪运行调度方式。
-
The paper is based on the theory of inter-function between water and rock, and losing energy in rock mass, brought forward that the water flow has head loss during water flow intruding through the coal seam effective water-resisting layer and energy waste concept for splitting rock mass, and analyzed the form of the remaining water pressure. Through the simulation experiment in the preventing water capability of water-resisting rocks in the coal seam scaleboard, studied the law, character of the losing in water head waste and the relation to pressure, water-resisting of hydrogeology and engineering geology character. Brought forward the new method of calculating the water inrush coefficient.
通过理论分析和实验研究,本文得出以下结论:高承压水在沿煤层底板隔水层导升过程中存在着明显的压力水头损失;同一地层条件下,煤层底板承压水水头压力越大其导升过程中的水头压力损耗就越大;同一水头压力条件下,地层的渗透性越差其阻水能力越强,水流导升过程中的水头压力损耗也越大;在同一介质中,当初始水头压力不同时,水流在导升过程中水头压力的衰减不同,在同一隔水介质中底板含水层水头压力越大其沿隔水层导升过程中的水头损耗也就越大,水头损耗随底板隔水层水头压力增加而呈递增趋势,另外它们相应的水头衰减速率也呈递增趋势,煤层底板隔
-
Those rarely refer to the researches about water pressure function mechanism. In fact, the water flow intrudes upwards with a loss of the distance water and energy wastes for splitting rocks when confined groundwater intrudes upwards through coal seam water-resisting layer. The water flow under the coal seam scaleboard consumes more energy after it intrudes at a certain height.
实际上,煤层底板高承压含水层水沿隔水底板岩层向上导升过程中,存在一定的沿程水头损失和劈裂岩体裂隙的能量损耗,下伏含水层高压水在底板隔水层下部劈裂导升一定的高度后,在导升段的能量消耗很大,这时作用于有效隔水层段下部的实际水压已远远小于含水层中的观测水压,真正作用在有效隔水层上的水压为残余水压P_c,对底板有效隔水层起破坏作用的有效水压力亦应为残余水压。
-
Our products mainly include antifriction components in the field of excavators, shovel loaders dipper tines, tine supports and blades; mine electric dipper tines, tines bottom, shield board; asphalt concrete mixture and scaleboard; pavers screwy blades etc.
公司主要产品为挖掘机、装载机斗齿、齿座、边齿;矿山电铲斗齿、齿根、护板;沥青混凝土拌和楼衬板;摊铺机螺旋叶片等抗磨件。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。