查询词典 sand
- 与 sand 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Especially cold-resistant able to bear droughting, barren-resistant, resist sand blown by the wind, suitable for in maos of dark plain sand district popularizing and planting, the urban environment of sand district of green coverage, create the garden view with local characteristic of sand district.
尤其是耐寒、耐旱、耐瘠薄,抗风沙,适宜在毛乌素沙区推广种植,绿化美化沙区城市环境,创造具有沙区地方特色的园林景观。
-
The deltas differ from typical deltaic model.Deltaic front subaqueous distributary channel sand bodies and deltaic plain distributary channel sand bodies are the skeleton sand bodies of meandering stream-shallow sea delta and braided streain-shallow lake delta respectively but not tranditional deltaic front river mouth sand bars.
这两类三角洲与经典的三角洲模式不同的是,三角洲前缘水下分流河道砂体和三角洲平原分流河道砂体分别构成了曲流河浅水海相三角洲和网状河浅水湖泊三角洲的骨架砂体,而不是传统认为的三角洲前缘河口砂坝。
-
Sedimentary facies model for mixed sediments of recent reefoid carbonates and siliciclastics is developed from the facies model of fringing and barrier reefs. Based on the sedimentary facies and textures, mixed sediments may be subdivided into 5 types as follows: 1 reef base mixed sedimentary rocks and reef framework mixed sedimentary rocks; 2 reef flat sand-gravel mixed sedimentary rocks; 3 backreef beach-dune gravel-sand mixed sediments; 4 backreef lagoonal sand mixed sediments ; and 5 reef front littoral sand mixed sediments.
礁源与陆源混合沉积相模式是从岸礁一堡礁相模式基础上发展而来,根据其沉积相和沉积结构特徵可以分为5种混合沉积:①礁基混积岩和礁格架混积岩;②礁坪砂砾屑混积岩;③礁后海滩-沙提砾砂屑混合沉积;④礁后泻湖砂屑混合沉积;⑤礁前浅海砂屑混合沉积。
-
The sand skink is a small subterranean lizard that's virtually legless, and it swims through the sand - or just under the surface of the sand. And as it does so, it pushes up a little ridge of sand that falls down behind it, and it leaves these S-shaped curves.
沙蜥是小形的、地底下活动的蜥蝪,实际上没有脚(因为它的脚是像鳍一样推动前进而非行走),在沙中或在沙下类似游泳前进,在它身后推挤出微小沙丘,留下s形的曲线。
-
Current various product lines are as follows: 3 static press Molding Line, 5 Air Impact lines, 6 Resin Sand lines, 2 Lipid Vulcanize Water Glass Sand lines, 10 Jolt-Squeeze Mechanical Molding lines, 3 Shell Molding lines with Resin Sand, 4 Sand Coated Iron Mould lines used for Ferrous Moulding, 11 investment casting lines, 5 Precision Casting of Lost Form lines, 27 Die Casting lines, 22 Gravity Casting of non-ferrous Metal lines and 16 Low Pressure Die Casting lines.
现有各种生产线构成如下:静压造型线3条,气冲生产线5条,树脂砂生产线6条,脂硬化水玻璃砂生产线2条,震压式机械造型生产线10条,壳型铸造生产线3条,黑色金属铁模覆砂生产线4条,熔模精密铸造生产线11条,消失模生产线5条,压铸生产线27条,有色金属重力铸造生产线22条,低压铸造生产线16条。
-
Static press Molding Line, 5 Air Impact lines, 6 Resin Sand lines, 2 Lipid Vulcanize Water Glass Sand lines, 10 Jolt-Squeeze Mechanical Molding lines, 3 Shell Molding lines with Resin Sand, 4 Sand Coated Iron Mould lines used for Ferrous Moulding, 11 investment casting lines, 5 Precision Casting of Lost Form lines, 27 Die Casting lines, 22 Gravity Casting of non-ferrous Metal lines and 16 Low Pressure Die Casting lines.
现有各种生产线构成如下:静压造型线3条,气冲生产线5条,树脂砂生产线6条,脂硬化水玻璃砂生产线2条,震压式机械造型生产线10条,壳型铸造生产线3条,黑色金属铁模覆砂生产线4条,熔模精密铸造生产线11条,消失模生产线5条,压铸生产线27条,有色金属重力铸造生产线22条,低压铸造生产线16条。
-
Gramineae and Compositae by the shifting sand to the fixed sandy land, the species of which changed greatly, that indicated they were playing a great role in the recovery of the sands. Asclepiadaceae plants could serve as a indicative plants to distinguish between the types of shifting sand and other sand; Portulacaceae and Bibgnoniaceae plants, which appeared only in the fixed sandy land, has become a landmark to determine the fixed sand plants. In addition to artificially plant Caragana spp. and Artemisia spp.
豆科和藜科植物作为流动沙地的先锋物种,表现出较强的适应能力;禾本科和菊科植物由流动沙地到固定沙地,其种类变化较大,表明其在沙地恢复中发挥着巨大的作用;萝摩科植物可作为区分流动沙地和其它沙地类型的指示性植物;马齿苋科和紫薇科植物仅在固定沙地中出现,已成为判断固定沙地的标志性植物。
-
In this paper,the erosional and depositional stability of the Lanjiang sand bar in the Longkou Bay is studied by making a comparison between water depth data in different periods,and the erosion and deposition mechanisms of the Lanjiang sand bar are discussed by analyzing the formation process of sand bar and the sediment movement around sand bar.
通过不同时期的水深对比对龙口湾拦江沙坝的稳定性进行研究,从其形成过程和现代泥沙运动的角度对拦江沙坝冲淤变化的机制进行探讨。
-
Seepage mechanism is applied to deduce two kinds of osmotic grouting model (plane radial flow and ball-type centripetal flow). Security grade basic working condition and reliability index of grouting on sand-fixed is proposed. And formulize reliability analysis of grouting on sand-fixed combining engineering cases. 4. The mechanism of sand-fixed of grouting engineering and sand-fixed of biological engineering is described.
运用渗流力学对平面径向流、球形向心流两种渗透性注浆模型进行了推导,将可靠度理论引入注浆工程,提出了固砂注浆的安全等级、基本工作状态以及相应可靠度指标,并结合工程实例,对固砂注浆工程的可靠性分析过程进行了阐述。
-
On the basis of sand-bodies Isopach figure drawing, the distribution of major reservoir sand-bodies of Neopaleozoic in south of North China Basin was studied. Basing on the distribution of sand-bodies in sequence stratigraphic framework, combining the development and distribution features of barrier and underwater distributary channel, there is a disquisition on the distribution regularity of pay reservoir sand-bodies of Neopaleozoic in this area.
以编制砂体等厚图的方式研究了华北盆地南部上古生界主要储集砂体的平面展布规律,并以层序地层格架下的砂体展布研究为基础,从沉积体系控制下的砂体分布特点出发,结合障壁岛与水下分流河道的发育与分布特点,系统深入地开展了区内上古生界有利储集砂体的分布规律研究。
- 相关中文对照歌词
- Don't Get Sand In It
- Remember "Walking In The Sand"
- Theme For A Nude Beach
- Pictures In The Sand
- Sand
- Sand In My Soul
- Swim Until You Can't See Land
- Sand In My Shoes
- The Solid Rock
- Christmas In The Sand
- 推荐网络例句
-
More direct, directer ; most direct, directest
径直的,笔直的
-
Do you know how to use a chain saw?
你知道如何使用链锯吗?
-
This is close to the cost of the purchase price.
这样的收购价已接近成本。