查询词典 rolling mill
- 与 rolling mill 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Furnace door movements through rolling ro-und in the upper and lower guide rail rolling realized,ens-ures that when furnace door closed seal anastomosis betweenfurnace door and furnace,ensured that the opening will not be in the process of friction injury masonry,furnace door and the car actionboth passed by the motor worm gear redu-cer,to provide the chain of transmission,electromagnetic brake and equipped with appropriate adjustments.
炉门升降通过滚动轮在导轨上下滚动实现,既保证了关闭炉门时炉门炉体间的吻合密封,又保证了在开启的过程中不会磨擦损伤砌体,炉门及台车运动均是由电动机通过蜗轮蜗杆减速机,链条传动来提供的,并装有电磁制动器进行适当的调整。
-
With the purpose of improving the strip quality monitoring methods of 1676mm 4-stand tandem cold rolling mills of Benstell cold rolling plant.the monitoring tactic for plate thickness and crown was preliminarily studied here.
中文摘要:本文以改善本钢冷轧厂1676mm酸洗—冷连轧联合机组的板带质量监测手段为目的,对冷轧带材厚度和板凸度的在线监测策略做了初步的研究与探讨,提出了采用虚拟仪器技术构成监测系统的方法。
-
With the help of recommended abrasives and techniques, through the process of heating – roughly hot rolling – precisely hot rolling in a variety a machines, hot rolls can be shaped into high-precision aluminium belts, which shall better meet the growing needs of the PS baseboards for pots and the simifinished aluminium foil sheets, for there is a big market gap and high grade request for high-precision aluminium belts in the market.
三、建设规模:年产40万吨高精度铝板带热轧卷;工艺技术:采用国际先进的热轧生产技术,由铸锭经加热—热粗轧—多机架热精轧的生产工艺,配合引进的工艺技术磨具可满足制罐料 PS 板基、双零铝箔坯料等市场缺口大的高精度铝板带产品对热轧卷的质量要求;主要设备:包括铸锭铣床一台、推进式加热炉3台、2400mm1+4热连轧生产线一条、轧辊磨床2台(国外引进1台),预计引进设备需用外汇8000万美元。
-
Basing on this mode and his two invention patents, chooseing ANSYS as platform and linking the important project of JiLin province Science and technology ministry 'cylindrical and cone spurgears rolling preform and extrusion precise forming equipment research and manufacture for automobile'(NO.20030311), the author made the finite element numerical simulation about elasto-plastic large deformation heat-force couping of rolling preform and stamping-extrusion and bulge-extrusion combining precise forming for spur gear', investigated qualitativiely and quantitatively on the gears formability for the environmental and the blank parameters , summarized some useful conclusions.
本论文是我的导师宋玉泉教授关于&塑性精密成形&研究方向的一个组成部分,按照他所提倡的&科、教、产一体化&培养模式,并以他的两项发明专利为依托,立足于以ANSYS软件为模拟平台,密切结合吉林省科技厅重点项目&汽车用圆柱圆锥直齿轮滚轧和挤压精成形设备研制&(批准号:20030311)和吉林大学超塑性和塑性研究所&直齿轮中试生产线建设&,开展了对&圆柱直齿轮滚轧制坯-镦挤、胀挤复合精成形&的有限元弹塑性大变形热-力耦合数值模拟,对环境参数和轧件内部的参数对制件成形性的影响进行了定性和定量的研究,总结了一些有意义的结论。
-
Structured packing which has wire mesh packing, sheet packing nets, rolling-hole packing, corrugated plate packing, etc.; bulk packing are: Powell ring, ladder ring, Intalox ring, flat ring, conjugate ring, the British park , double convex ring, ring ohm, V-ring, ring 84 inside the arc and so on; experimental filler: Q net ring packing, rolling-hole ring packing, Seater, Central and so on, column has: Tortoise net, float valve, connectors , Nagarze, blister, plate, tray, distribution devices, such as demister.; Products sold throughout the country, exported to Southeast Asia.
其中规整填料有丝网波纹填料、板网波纹填料、压延孔波纹填料、孔板波纹填料等;散装填料有:鲍尔环、阶梯环、矩鞍环、扁环、共轭环、英特帕克、双凸环、欧姆环、V型环、八四内弧环等;实验填料:Q网环填料、压延孔环填料、西特环等,塔内件有:龟甲网、浮阀、连接件、卡子、泡罩、筛板、塔板、分布器、除沫器等。;产品畅销全国,远销东南亚地区。
-
The calculation of the rolling time shall not account for the times required for reduced rolling speed due to material faults, operator's error, pause, repair, maintenance, test program change and the other downtimes, for which Seller is not responsible.
轧制时间的计算不包括由于材料的问题,操作人员的失误,暂停,维修,保养,测试程序的改变等浪费的时间和其他时间,卖方对此不负责。
-
What's apparently effed, as speculation goes, is when the internal GMT-tracking rolls over to 3/1. It's either not rolling, or rolling to 2/29, at which point a system tries to add/subtract from 2/29, which it can't do because the front-end calendar doesn't have a 2/29/2010, and shit explodes. Seemed to happen around 4PM PDT, which I think is 12AM GMT, so.
目前PS3的问题是,当GMT时间到3/1/2010 0AM GMT的时候,PS3内部时钟不能到达3/1/2010或者2/29/2010因为不能到3/1/2010,所以PS3就在往死里寻找2/29/2010,但是内藏的日历表自然是么2/29/2010的所以始终就爆发了……时间就回到了12/31/1999仔细调查出错的时间就是在3/1/2010 0AM GMT(其它区域时间请自己计算
-
What's apparently effed, as speculation goes, is when the internal GMT-tracking rolls over to 3/1. It's either not rolling, or rolling to 2/29, at which point a system tries to add/subtract from 2/29, which it can't do because the front-end calendar doesn't have a 2/29/2010, and **** explodes. Seemed to happen around 4PM PDT, which I think is 12AM GMT, so.
目前PS3的问题是,当GMT时间到3/1/2010 0AM GMT的时候,PS3内部时钟不能到达3/1/2010或者2/29/2010因为不能到3/1/2010,所以PS3就在往死里寻找2/29/2010,但是内藏的日历表自然是么2/29/2010的所以始终就爆发了……时间就回到了12/31/1999仔细调查出错的时间就是在3/1/2010 0AM GMT(其它区域时间请自己计算
-
However, in the business card printing and membership card in case of making paper out of the dirt and friction are suites-rolling up dew producing copper, dirt, diabetes'mellitus to marketizing to get rid of CR rolling dirt broken, you need to start from the dirty yellow amiodaron potassium in addition to, and then use special equipment electrized chromeplating, more time-consuming.
但在制卡和会员卡制息历程洋如逢纸弛掉下的砂粒摩擦,不常不兵版面铬层轧碎后露铜,爆发感脂上不净弊病,给打消镀铬层轧碎上不净出格便当,需不后用黄胺酸钾不兴不净,然后再用兼用摆设通电镀铬,较不省工夫。
-
Calibration tool storage cabinet rolling rack w/lights statu go rack rolling rack w/hardhats.tool.rarts metal work station office chairs 7"miter band saw fiberglass backing plates 12"band saw filing cabinets 7 air conditioners 6 humidifiers 2 grinders 2-carts w/testing equipment golf cart 6 utility carts left upper wing right upper wing 4 rolls of final bagging disassembled lay up room lexan 4*8*9/8 3 roof top air ducts preforming core fuselage to wing part non conforming steel/alominum insulation tubes left lower wing right lower wing horizontal upper tail 2 sheets of 1honeycomb core office cubicles cabin door frame template 1 medium size cabinet 2 small cabinets flammable container L.H.boom inboard flap hinge(2) R.H.boom inboard flap hinge(1) L.H.outboard nacelle little fuse CSL mold AFT keelgusset mold LH boom inboard mold RH boom outboard mold LH upper fuel tank mold RH lower fuel tank mold universal safety mats(13) aileron bond/drill jigs metal saw hooses 5-lay up tables safety mat trim kit empty rack office chairs left assembled boom right assembled boom utility carts small file cab bagging material black med.
标定工具储藏柜轧制机架瓦特/灯 statu去机架轧制机架瓦特/ hardhats.tool.rarts 金属工作站办公椅 7 &字带锯玻纤板支持 12 &带锯档案柜 7空调 6加湿器 2磨床 2 ,车瓦/测试设备高尔夫球车 6实用车左上翼右上翼 4卷最后套袋拆卸积储室聚碳酸酯4 * 8 * 9月8日 3天台冷气槽预成形核心机身的一部分,以翼不符合钢铁/ alominum 保温管左下翼右下翼横向上尾 2张1 蜂窝芯办公室隔间舱门框模板 1中型内阁 2小柜易燃集装箱 L.H.boom内侧襟翼铰链( 2 ) R.H.boom内侧襟翼铰链( 1 ) L.H.outboard发动机舱小保险丝CSL的模具霉菌毒素keelgusset 黄体生成素臂船模生殖健康繁荣舷外模具激素上油箱模具相对湿度较低的燃料箱模具普遍安全垫( 13 )副翼债券/钻夹具金属看到hooses 5 -奠定表安全垫装饰盒空架办公椅离开组装繁荣正确组装繁荣实用工具车小档案驾驶室套袋材料黑色med。
- 相关中文对照歌词
- Rolling Down My Face
- Thanks To The Rolling Sea
- Ya Hear Me
- Blue Smoke
- Proud Mary
- The Cover Of The Rolling Stone
- I'm F%#k'd Up
- Rolling Stone
- Walking On Water, Running On Alcohol
- Olde Mill Inn
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。