英语人>网络例句>rock-firm 相关的网络例句
rock-firm相关的网络例句

查询词典 rock-firm

与 rock-firm 相关的网络例句 [注:此内容来源于网络,仅供参考]

The origin of the No. 7 nugget found in south suburbs of Yiyang city of Hunan mainly comes from plaeovolcanic rock and the gold veins and the basic volcanic clastic rock in Nenjiaxi Group slate around the plaeovolcanic rock. Its origin belongs to near source or autochthon sedimentary regeneration.

湖南益阳南郊 7号"狗头金"的金源主要来自古火山岩及其边部冷家溪群板岩中的含金矿脉与基性火山碎屑岩系,属近源甚至近于就地的沉积再生成因。

Thirdly, surrounding rock deformation and failure process of layered rock mass in high geo-stress was reappeared through the physical models with different dip angle of rock stratum, and the stress change and failure discipline in the direction of vertical to bedding plane was definitely determined.

根据共和隧道砂质页岩的力学性质,运用相似理论,构筑不同倾角层状岩体的物理模型,研究了高应力条件下层状岩体围岩应力变化及变形破坏过程特征,确定了层状岩体在垂直于层面方向上围岩应力变化规律及破坏形态,揭示了深埋隧道层状岩体的破坏机理;物理模型实验研究得到的围岩应力变化规律及破坏特征与数值模拟分析的结果基本一致,同时也验证了横观各向同性弹塑性本构模型的正确性。

In view of practical problem during Sulige gas field development, this paper complete follow study content. Study material balance theory of two district compound gas reservoir. Carry out stress sensitivity experiment on matrix rock and labor created fracture core from Sulige gas field with America Core Company high pressure high temperature flow experimental instrument to study stress sensitivity change rule of different permeability matrix rock and created fracture core at the condition of time and again switch on and off well and different drawdown pressure. Carry out depletion experiment on matrix rock of different permeability serial combination with different kinds of allocation, using double core clamper serial connected experimental apparatus, to study gas well production performance of bi-zonal compound low permeability reservoir during low pressure production stage. At the basis of experimental study, establish single well simulation model to analyze development index infection caused by stress sensibility and production performance infection rule caused by inner formation and outer formation of bi-zonal compound gas reservoir permeability variation while considering stress sensitivity.

针对苏里格低渗气田开发中存在的实际问题,完成以下研究内容;研究了两区复合气藏物质平衡原理;利用美国岩芯公司高温高压流动实验仪,对取自苏里格气田基质岩芯和人工造缝岩芯进行应力敏感实验,研究不同渗透率基质岩芯和造缝岩芯在多次开关井和不同生产压差条件下的应力敏感变化规律;采用双岩芯夹持器串联实验装置,对不同渗透率串联组合的基质岩芯进行各种配产条件下的衰竭实验,研究两区复合的低渗储层气井在低压生产阶段的生产动态特征;在实验研究的基础上,建立单井模拟模型分析储层应力敏感性和非均质性对开发指标的影响,研究考虑应力敏感时两区复合气藏储层中内区和外区渗透率变化对开发动态的影响规律。

We did not know what the face had to offer, but to our relief found it very climbable. We were able to link-up class 4 snow and rock ramps. At one point a 20 meter high rock band of loose and vertical rock split these ramps. Liu Yong efficiently surmounted this obstacle and we continued following the ramps up the face to a slightly overhanging snow cornice. I dug my way through the cornice which led onto the glacier.

我们根本不知道正面的路线怎么样,但是过去了以后发现它有希望,能连接4级雪和石头的坡道,顺这些坡道往上爬,其间有一段20米高的很长的岩壁,刘勇有效地超越了这个障碍物,然后我们继续顺正面的坡道到了雪檐,我通过挖掘雪檐就到了后面的冰川。

We did not know what the face had to offer, but to our relief found it very climbable. We were able to link-up class 4 snow and rock ramps. At one point a 20 meter high rock band of loose and vertical rock split these ramps. Liu Yong efficiently surmounted this obstacle and we continued following the ramps up the face to a slightly overhanging snow cornice.

我们根本不知道正面的路线怎么样,但是过去了以后发现它有希望,能连接4级雪和石头的坡道,顺这些坡道往上爬,其间有一段20米高的很长的岩壁,刘勇有效地超越了这个障碍物,然后我们继续顺正面的坡道到了雪檐,我通过挖掘雪檐就到了后面的冰川。

This procedure has been confirmed feasible and accurate by examples, then analyses and calculates the homogeneous and unhomogeneous earth rock-fill dam, isotropic and anisotropic earth rock-fill dam, Yanji earth rock-fill dam with clunch core. The results by ANSYS is compared with the results by other seepage soft, which is quite similar and prove ANSYS practicability for calculating seepage field.

通过算例验证了该程序的可行性和正确性,接着对均质和非均质,各向同性和各向异性的土石坝以及烟集粘土心墙土石坝进行分析计算,并和其它渗流软件相互比较,结果较为相近,证明了ANSYS计算渗流场的实用性。

Lava from the earth's crust deep place, because the earth's crust deep place's temperature is extremely high, the lava by the volcano rock magma's shape existence, along with the volcanic eruption, the rock magma also spouts the surface along with it, meets the water or the low temperature starts to congeal, because the congealment process air entry, turned solid the rock magma to form the massive air bubbles gradually in the interior, coagulated after completely, has formed the structure unique lava.

火山石来自地壳深处,由于地壳深处的温度极高,火山石以火山岩浆的形态存在,随着火山喷发,岩浆也随之喷出地表,遇到水或低温开始凝结,凝结的过程由于空气的进入,逐渐变成固体的岩浆在内部形成了大量的气泡,完全凝固后就形成了构造独特的火山石。

New mathematical theory and Windows operation system character are adopted in the rock NMR decay curve's relaxation spectroscopy analysis software system. It is more useful in rock NMR analysis than the analysis software supplied with RiNMR system when rock samples are often measured in laboratory.

原MARAN-2随机的谱分析软件由于没提供源代码,许多参数的设置带有相当的经验性,而使用自己研究编制的软件对处理参数设置则有确切的理解,且增加了地质参数拟合软件包,更贴近于实验室面向岩样分析的特点和油田实际用户的要求。

The selection of geological prospecting in different stages(initial-prospecting, detailed-prospecting)(2)the selection of geological prospecting in the deep-laid and shallow-laid of tunnel project (3)the selection of geological prospecting of tunnel projecting in different geological conditions Finally, the author summed up main problems needing to be solved in tunnel engineering geological prospecting as follow:(1)differentiate stratum and find out the depth and thickness of different stratums in the tunnel section (2)find out geological structure and existence situation of fault, broken zone and weak plane (3)find out weathering level of bed rock to classify surrounding rock combining speed materials (4)differentiate stratum structure of the entrance of tunnel to judge the stability of it (5)find out existence situation and performance of ground water (6)situations of other harmful geological phenomenon In view of above problems and classification of surrounding rock, the author showed principles of rational choosing of methods in geological prospecting and counted disperse range of physical character parameter value in different petrosal character, getting achievements as follow:(1)summarization of effect, merits and demerits of different geological prospecting methods in the tunnel geological investigation (2)method selection and arrangement principle of tunnel engineering geological prospecting in different geological conditions and prospecting stages (3)According to previous experience and cases, the author concluded the物性parameters most in use ,and showed the basis of selecting geological prospecting methods in different geological conditions.

论文中用几个应用实例来说明:(1)不同勘察阶段物探工作的选用;(2)深埋、浅埋隧道工程物探工作的选用;(3)不同地质条件隧道工程物探工作的选用。最后总结归纳出隧道工程物探所需要解决的问题主要有:(1)划分地层,查明隧道通过剖面的各地层深度与厚度。(2)查明地质构造,隧道轴线段有无断层、破碎带、软弱层面等。(3)查明基岩风化程度,从而结合速度资料进行围岩分级。(4)划分洞口地层结构,判断洞口稳定性。(5)查明地下水赋存情况及其活动动态。(6)其他不良地质现象存在情况。针对上述需要查明的地质问题与计算围岩分级情况,论文提出合理选用物探方法的原则,并统计了物性参数值在不同岩性中的分布范围。得出以下研究成果:(1)总结出各物探方法在隧道地质调查中的作用和优缺点。(2)得出不同地质条件下和不同勘察阶段,隧道工程物探方法选择和布置的原则。(3)根据以往工作经验和事例,对常用的物性参数进行了归纳总结,同时介绍了不同地质条件下物探方法选择的依据。

Past investigation found the rock in the right dam foundation composing of granite(γ_4~3~γ_5~1) in dyas- trias,which has a very complicated mechanical environment. The complicated phenomenon is as follows: tectonism, alteration, rock mass demobilize, rock mass stress release and other factors.

前期的调查表明其右岸岩体力学环境复杂,表现为:构成右岸坝基岩体主体的二迭~三迭纪花岗岩(γ_4~3~γ_5~1)受构造变动、蚀变、风化卸荷等因素的影响形成了坝基软弱岩带和坝肩上部卸荷松弛岩体。

第17/100页 首页 < ... 13 14 15 16 17 18 19 20 21 ... > 尾页
相关中文对照歌词
Rock-A-Bye Rock
Rock! Rock! Till You Drop
Live To Rock (Rock To Live)
Rock 'n' Roll, Rock 'n' Roll
Rock Rock Rock
Jibun Rock (じぶん Rock)
Rock 4 Rock
Rock That Rock
Rock-A-Rock Around With Ollie Vee
Rock, Rock, Rock
推荐网络例句

This paper discusses design and realizable methods of remote test output interface from logical design angle.

本文从逻辑设计的角度讨论遥测输出接口的设计及实现方法。

This also 星体投射plies to buildings, structures and geological features.

这也适用于建筑物和地质特征。

We all hope for a better life.

我们都希望好的生活。