查询词典 rock-boring
- 与 rock-boring 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Beijing Midi festival is the best rock festival in China...A rock band called "Askar + Grey Wolf Band "from Xinjiang,awesome show!
来自新疆的摇滚乐队&艾斯卡尔与灰狼&在2004年迷笛音乐节上的演出,现场很棒,新疆的民族音
-
This paper concludes the study methods of oil and source rock correlation for heavy oils with different degree of biodegradation;correlates the heavy oil and source rock in the western depression of Liaohe oilfield using the method of asphaltic ruthenium ion catalysis-oxidation and analysis of wrapped hydrogen in asphalt.
总结了不同生物降解程度的稠油油源对比相应的研究方法;利用沥青质钌离子催化-氧化、沥青质中包裹烃等新方法对辽河断陷西部凹陷稠油油源进行了对比研究。
-
This site has a broad U-shape valley and is appropriate for constructing concrete faced rock-filled dam and embankment dam with an asphaltic concrete core. Further studies and comparisons indicated that both types of dam were technically feasible, and concrete faced rock-filled dam had distinct advantage in cost.
进一步的研究和论证结果表明,修建混凝土面板堆石坝及沥青混凝土心墙堆石坝在技术上均可行,混凝土面板堆石坝比沥青混凝土心墙坝方案在投资方面有优势。
-
The same set of ductile-rheologic shear deformational augen granite samples in the Yunkai uplifted area are measured by whole-rock Sm-Nd, Rb-Sr isotopic dating system method, obtaining respectively 1414±68Ma for Sm-Nd isochron age and 490±36Ma for Rb-Sr isochron age. These ages are respectively interpreted as the time of the granitic rock formation and the time of the tectono-thermal event of ductile-rheologic shear partial melting in Caledonian, indicating that the orogeny not only took place in Caledonian, but also the more important tectono-magmatic orogeny in the late Mesoproterozic Era and can be compared with the time of global Grenville orogeny.
对云开核部韧性-流变剪切变形眼球状花岗岩石样品进行了全岩Sm-Nd、Rb-Sr同位素年龄测定,获得1414±68Ma的Sm-Nd等时线和490±36Ma的Rb-Sr等时线年龄,它们分别代表这套花岗岩的形成时代和加里东期韧性-流变剪切部分熔融构造热事件发生时间,表明云开地区不仅在加里东期发生造山运动,而且在中元古晚期发生了更为重要的构造—岩浆造山运动,其时代与全球性的格林威尔造山运动时间可以对比。
-
Author discussed geological characters of vein rock and co-relation with auriferous mineralization, and indirectly concluded the relationship of auriferous ore and rock body.
从岩石学、石化学、量元素、位素等方面讨论了脉岩的地质特征及其与金矿化的关系,可间接推出金矿与岩体的关系。
-
Personal brief introduction 个人简历 Name:Chengnan date of birth:In 1984 September 07th Sex:Male marriage:Single Height:163 CM weight:54KG Graduate a college:Fukien dragon rock a life time section technique school profession:The machine electricity integral whole turns profession The work grow:Molding tool benchwork Oneself graduated from the dragon rock a life time section technique school machine electricity integral whole to turn professional educational system for two years in 2002 the course learn had in the school 《the car work craft 》《the machine graphics 》《the machine foundation 》《the metals material and hot processing 》《the electrician learn 》wait more than ten courses.
个人简历姓名:陈楠出生日期:1984年09月07日性别:男婚姻:未婚身高:163CM 体重:54KG 毕业院校:福建龙岩世科技术学校专业:机电一体化专业工种:模具钳工本人2002年毕业于龙岩世科技术学校机电一体化专业学制两年在校所学课程有《车工工艺》《机械制图》《机械基础》《金属材料与热处理》《电工学》等十几门课程。
-
Brecciated clay rock and hydromica clay rock at tunnel exit section have been almost argillized clay and the clay is easy swelling when encountering water.
其角砾状粘土岩和水云母粘土岩多已泥化成粘土,遇水易膨胀。
-
This paper , pertaining to a certain project situated in karstic region where geologic formation is highly developed with features of calciferous cave faults abundant, in corporation with on site measurement and anti-analysis results, sets up a geo-mechanics model for various rock formations, and by way of 3D non-linear large deformation values modelling computation, numeric simulated study was taken for different shotcreted anchoring supports upon which one has studied surrounding rock control technique under unfavourable geologic conditions.
提要:本文针对某工程处于岩溶地区,地质构造发育,溶洞断层较多的地质特点,结合现场量测和反分析结果,建立不同岩体结构的地质力学模型,通过三维非线性大变形数值模拟计算,对不同的锚喷支护过程进行了数值模拟研究,在此基础上,研究了不良地质条件下的围岩控制技术。
-
Therefore,test and research on subgrade treatment of cataclastic expansive rock,retaining and protection of high cut slope in crushing and weak rock,and new retaining structure types of high embankment slope,such as piles-plate wall of prestressed anchor wire,reinforced earth retaining wall of new type straps,are conduc.
对此,开展了碎裂膨胀岩路基边坡处理、破碎软岩路堑高边坡挡护和路堤高边坡新型支挡结构(锚拉式桩板墙,新型拉筋加筋土挡土墙)等项结合工程的科研试验,取得突出成果,为南昆铁路的顺利建成和安全运营提供了科学依据。
-
Summarizing and analysing the stability of stratigraphy and the basic characteristics of geological hazard at the Three Gorges Reservoir,the authors put forward the dangerous slope mainly includes bedding slope,hard and soft rock alternation gentle slope,loose accumulative slop,karst breccia slop and layer cataclastic rock slop.The loose accumulative slopes from Fengjie to Badong are most dangerous and need to control.
在总结分析三峡水库区岩层稳定性及地质灾害基本特征的基础上,根据岩性和结构特征,提出三峡水库区存在较为严重失稳隐患的边坡主要有顺层边坡、平缓软硬岩层互层边坡、松散堆积体边坡、岩溶角砾岩边坡和层状碎裂岩边坡等5种类型,其中分布于奉节至巴东段的松散堆积体边坡危险性最大,是需工程防护的重中之重。
- 相关中文对照歌词
- Rock-A-Bye Rock
- Rock! Rock! Till You Drop
- Live To Rock (Rock To Live)
- Rock 'n' Roll, Rock 'n' Roll
- Rock Rock Rock
- Jibun Rock (じぶん Rock)
- Rock 4 Rock
- Rock That Rock
- Rock-A-Rock Around With Ollie Vee
- Rock, Rock, Rock
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。