英语人>网络例句>rock-boring 相关的网络例句
rock-boring相关的网络例句

查询词典 rock-boring

与 rock-boring 相关的网络例句 [注:此内容来源于网络,仅供参考]

DRUSE minerals in the rock is fractured by the growth of many minerals or empty single cluster aggregates formed vigilance . They shared one end fixed to the base rock , the other side of freedom and good crystal growth firms .

矿物晶簇是指由生长在岩石的裂隙或空洞中的许多矿物单晶体所组成的簇状集合体,它们一端固定于共同的基地岩石上,另一端自由发育而具有良好的晶行。

The dual structure of the complex fault depression in Songliao Basin and its geologic historic construction determined the existence of two sets of petroleum systems and their differences. The deep fault-depression group developed during Late Jurrasic to early Cretaceous and the particularity of the constructions of its inside sedimentary rock and volcanic rock determined the particularity of the natural gas enrichment conditions.

松辽盆地断拗复合的二元结构及独特的地质演化特征,决定了2套油气系统的存在和差异;晚侏罗-早白垩形成的深部断陷群及其内幕沉积岩和火山岩建造的特殊性,决定了天然气富集条件的特殊性。

In this thesis, combining engineering geology and rock mechanics, the author intro duces the fracture mechanical process and mechanism of rock masses which are geological bodies in geological environment.

本文从工程地质与岩体力学相结合的角度,阐述了岩体作为地质环境中的地质体所表现的断裂力学过程与机制。

Just as they were about to sit down to eat, they saw Edmond springing from rock to rock.

正当他们要坐下来吃饭时,他们瞧见爱德蒙在岩石上跳来跳去。

Combined with advanced geological forecast work of Changwuling tunnel the reflection characteristics of radar wave pass through integrated stratum with rock of single characteristics,rich water region,rock vein and fracture zone,interface between slope eluvium and bedrock are analyzed.

结合长坞岭隧道超前地质预报工程实例,分析了雷达波穿越单一岩性完整岩层、富水区围岩、岩脉及裂隙破碎带、坡残积层与基岩界面时的反射特征,指出地质雷达在长坞岭隧道超前地质预报优化设计施工方案中发挥了重要作用,可为保障施工安全提供有效指导。

TheJiyang depression located in paleomonsoon climate zone in the period of the sahejieformation sedimentation, the wet and hot climate made ancient lake become deeperwater, enhanced stratification, reduced primary productivity of plankton, decreasingsedimentary velocity of carbonate, increasing sedimentary velocity of clay, fortifiedreductibility on certain degree, and then would be available for development of blackshale, dark shale and oil shale; In the contrast, the cold and dry climate lead ancientlake to shallower water, subdued stratification, increaser primary productivity ofplankton, enhancive sedimentary velocity of aphanitic carbonate, decreasedsedimentary velocity of clay, and then would be available for development calciteshale, calcite laminar shale, calcite mudstone, shaly carbonate rock, even laminarcarbonate or dolomite rock.

济阳坳陷在古近系沙河街组沉积期属于古季风气候带,在湿热的气候条件下古湖水加深,分层性增强,浮游生物的古生产力降低,隐晶碳酸盐的沉淀速率变小,粘土沉积速率加快,还原性一定程度上有所加强,有利于黑页岩、油页岩和暗色泥岩的形成:而相对干冷气候下,古湖水变浅,分层性减弱,浮游生物的古生产力增高,隐晶碳酸盐的沉积速率变大,粘土的沉积速率减慢,有利于钙质页岩、钙质纹层页岩、钙质泥岩、泥灰岩甚至纹层状碳酸盐岩、灰岩的发育。

In some places you can hop from rock to rock," says Tim Ernst, one of the trail's pioneers."

在一些地方,你可以从摇滚到跳岩说,"蒂姆恩斯特,一个开拓者的先驱。"

A water-filled joint element is developed to simulate the limited cooperation between reinforced concrete lining and surrounding rock; and an equivalent method is adopted to develop the program, The reinforcement stress and the rock stresses in hydraulic tunnel with inner water exosmosis are calculated.

计算衬砌渗透系数,引入反映钢筋混凝土衬砌与围岩有条件联合承载特性的充水夹层单元模型,采用等效耦合分析方法,对水工隧洞内水外渗条件下的衬砌钢筋应力和围岩应力状态进行了计算分析。

For the implementation of National energy conservation, environmental protection policies, to achieve the strategic goal of sustainable development, the company take advantage of China Institute of Science and Technology platform advantages of building materials, energy-saving technologies for building the external walls of a systematic study, launched the expansion of polystyrene board in rock thin plastering exterior insulation and finish systems and polystyrene particles of rock powder exterior insulation and finish systems.

为贯彻国家节约能源、保护环境政策,实现可持续发展的战略目标,公司利用中国建筑材料科学研究院平台优势,对建筑外墙节能技术进行了系统的研究,推出了中岩膨胀聚苯板薄抹灰外墙外保温系统和中岩胶粉聚苯颗粒外墙外保温系统。

First, considering the volume expansion process of corroded bolt, the displacement model of mortar inner surface leaded by bolt corrosion is established after the loss of corrosion production is denoted by a filling factor. Second, based on elastic theory, the mortar cracking process is analyzed after the concept of influence coefficient of surrounding rock is introduced in the course of analyzing, and the degree of cracking course affected by surrounding rock parameter is also analyzed; the finite element method is adopted to verify the results.

考虑锚杆锈蚀体积膨胀过程,以填充系数表示砂浆开裂过程中锚杆锈蚀产物的损失,建立了锚杆锈蚀后砂浆内部位移模型,以弹性力学为基础,引入围岩参数影响系数概念,对锚杆锈蚀导致砂浆保护层开裂过程以及围岩参数对开裂过程的影响程度等进行了分析研究,并采用有限元分析方法对其进行了验证。

第37/100页 首页 < ... 33 34 35 36 37 38 39 40 41 ... > 尾页
相关中文对照歌词
Rock-A-Bye Rock
Rock! Rock! Till You Drop
Live To Rock (Rock To Live)
Rock 'n' Roll, Rock 'n' Roll
Rock Rock Rock
Jibun Rock (じぶん Rock)
Rock 4 Rock
Rock That Rock
Rock-A-Rock Around With Ollie Vee
Rock, Rock, Rock
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。