查询词典 road contractor
- 与 road contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The man who was responsible for building roads ,they think he with the contractor reached hiddened business deal;which is that the contractor brided him,in order to getting the contact of building the city's roads
他们正在调查负责修建道路的那个人。他们认为他和承包商达成了不可告人的交易;承包商私下贿赂他,以得到修建城市道路和桥梁的合约。
-
The orderer consent pay to the contractor before the above stipulated time, failing which the contractor reserves the right to cancel this contact without further notice, and/or lodge a claim for losses sustained, if any.
定作方承诺按约定的时间内支付款项。否则承揽方有权不经通知解除本合同,并对因此遭受的损失提出索赔。
-
If at any time, any question, disputes or differences whatso - ever shall arise between the Purchaser and the Contractor, upon or in relation to, or in connection with this Contraot, either partymay forthwith give to the other, notice in writing of the existence of such question, dispute or difference and same shall be referred to the addication of, three arbitrators, one to be nominated by the Purchaser, the other by the Contractor and the third by the President of the International Chamber of Commerce, in the case of foreign Contractors and Secretary - General of The Engineering Institute of Parcheesi, in the case of local contractors.
第三十七条争议的解决——仲裁 37Settlement of Disputes Arbitration 发包方和承包方之间在任何时候发生与合同有关的一切问题,争议或异议,任何一方应当立即以书面形式告知另一方这种问题,争议或异议的存在,同时应提交仲裁。三名仲裁员,一名由发包方指定,另一名由承包方指定,如果承包方为外国人,则第三名由国际商会主席指定;如果承包方为本地的,则第三名仲裁员由工程协会的主席指定。
-
During the execution of the Works the Contractor shall keep the Site seasonably free form all unnecessary obstruction and shall store or dispose of any Contractor's Equipment and surplus materials and clear away and remove from the Site any wreckage, rubbish or Temporary Works no longer required.
在工程施工期间,承包商应合理地保持现场不出现不必要的障碍物,存放并处置好承包商的任何设备和多余的材料并从现场清除运走任何废料、垃圾或不再需要的临时工程。
-
The sum of all the products of the composite weight coefficients and the corresponding qualified rate of the finished items is adopted as the standard for contractor performance ordering and contractor stimulation.
以层次分析结构最底层影响顾客满意度各因素的权重与其相应的验收合格率的乘积之和作为度量承包商让渡的顾客满意度的标准对承包商绩效进行排序和激励。
-
Bonded contractor : contractor who has taken out a surety bond to cover any claims against him.
取得履约保证的承包商:指承包商已经取得履约保证以避免承担任何索赔。
-
The Contractor shall pay sufficient attention to keep undepressed temporary roads or permanent roads with the Contractor's travel until the Project Project Owner's consent.
承包商要足够重视,保持临时道路和永久道路不被破坏。
-
1 In the event of a Subcontractor having undertaken towards the Contractor in respect of the work executed; or the goods, materials, Plant or services supplied by such Subcontractor, any continuing obligation extending for a period exceeding that of the Defects Liability Period under the Contract, the Contractor shall at any time, after the expiration of such period, as sign to the Employer, at the Employer's request and cost, the benefit of such obligation for the unexpired duration thereof
14.1 当分包商在所进行的工作,或其提供的货物、材料、工程设备或服务等方面,为承包商承担了合同规定的缺陷责任期限结束后的任何延长期间须继续承担的任何连续义务时,承包商在根据雇主的要求和由雇主承担费用的情况下,在缺陷责任期满之后的任何时间,将上述未终止的此类义务的权益转让给雇主。
-
General Contractor shall ensure that should the Owner be joined as a party in any action or proceeding arising out of the violation or an alleged violation of the Labor Law of China in the performance of the Contract, the General Contractor, Subcontractor or Materialman violating or alleged to have violated such law, or using or introducing goods manufactured or alleged to have been manufactured in violation of the law, shall defend and hold harmless the Owner in any such action or proceeding and pay and defray any damage, expense and cost of any description by reason thereof, including reasonable attorneys fees.
5.5 在合同履行过程中时,如果因违反了或有嫌疑违反了中国劳动法而引起的法律诉讼,使发包人成为诉讼参与人,则违反或有嫌疑违反了上述法律的、或者使用或采用违法制造的或有嫌疑违法制造的物品的总承包人、分包人或材料商应在任何这类诉讼中为发包人辩护,使发包人免受损失,并支付因此而产生的各类损失、费用和开支,包括合理的律师费。
-
By this way, it can be seen that the risks of natural disaster and accident can be transferred by construction insurance and that man-caused risks by construction bond. Furthermore, this paper studies the legal problems in the implementation of construction insurance and bond system and the correspondent laws that need to be improved. With reference to construction insurance, it is compulsive to carry out Contractor"s All Risks, Erection All Risks, Employer"s Liability Insurance, Supervisory Engineer/Designer Professional Liability Insurance and Maintenance Insurance. As for construction bond, it is suitable to take the method of surety bond and implement obligatorily Bid Bond, Performance Bond, Employer Payment Bond and Contractor Payment Bond. In addition, this paper analyses the problems in the implementation of construction insurance and bond system in China and presents corresponding solutions. In the end, it provides a method by option price theory to estimate the costs of construction bond.
本文首先借鉴国外工程保险和担保制度,通过工程保险可以有效的转移自然灾害和意外事故风险,通过工程担保转移各种人为风险;其次研究了在我国实行工程保险和担保制度存在的法律问题和需完善的相关法律,提出在工程保险方面,应强制实行建筑工程一切险、安装工程一切险、质量保修保险、设计/监理责任险,在工程担保方面,宜采取保证担保的方式,强制实行投标保证担保、履约保证担保、业主履约保证担保和付款保证担保,分析了在我国实行工程保险和担保制度存在的问题,提出相应对策;最后运用期权价格理论给出了确定工程担保费用的一种方法。
- 相关中文对照歌词
- The Long Road
- Mus Come A Road
- The Road
- (I'm A) Road Runner
- Road Block
- High Road
- Papa Won't Leave You, Henry
- Road Trip
- Further On Up The Road
- Long Hard Road
- 推荐网络例句
-
I think people in this lifetime in a rebirth.
我觉得人在这一生里其实也在轮回。
-
He had to tie her hands together.
他不得不把她的双手绑在一起。
-
Erastus was stopping at Corinth; but Trophimus, when I last saw him was at Miletus, ill.
4:20 以拉都在哥林多住下了。特罗非摩病了、我就留他在米利都。