英语人>网络例句>road contractor 相关的网络例句
road contractor相关的网络例句

查询词典 road contractor

与 road contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]

In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue retesting, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

3The Employer shall repay to the Contractor any increased cost of or incidental to the execution of the Works, other than such as may be attributable to the cost of reconstructing work condemned under the provisions of 20 hereof, which is howsoever attributable to or consequent on or the result of or in any way whatsoever connected with the said special risks, subject however to the provisions in this hereinafter contained in regard to outbreak of war, but the Contractor shall as soon as any such increase of cost shall come to his knowledge forthwith notify the Employer thereof in writing.

3除了可归因于重建本合同第 26 条规定的被决定废弃的工程的费用之外,发包方应当向承包方偿付任何增加的费用或执行工程的杂费。这些费用可归于特殊风险或在某种意义上与所说的特殊风险相联系,且无论如何以本条下面包括的有关战争爆发的规定为条件,但承包方一知道任何这种费用的增加就应当立即以书面方式通知发包方。

B Upon the confirmation by the Project Manager in writing of the achievement of practical completion of the Trade Works, the Project Manager shall subject to the Trade Contractor's compliance with clause 2(8), issue an Interim Certificate for fifty per cent (50%) of the total amounts then so retained and the Trade Contractor shall be entitled to payment of the said retention release within the Period for Honouring Certificates named in Schedule 1 hereto.

b在项目经理书面确认工程取得实质性完工时,项目经理应该根据专业承包商对条款2.8的遵守,发出50%保留款项的临时付款证明,因此专业承包商有权在附表1所示的批准付款证书期间取得该保留款项。

That is, while responsibility for jobsite safety may be shared with a sub-contractor, the prime or general contractor retains overall responsibility.

也就是说,现场安全的责任而可能与分包商,总理或总承包商共同保持整体的责任。

G The contractor shall arrange for the presence of the vendor's and the licenser's representatives at the site to assist the contractor's personnel, wherever necessary.

g 承包商必要时应安排供货商和技术许可商的代表到现场协助承包商的人员。

The reasonable cost of removal of Constructional Plant under sub-clause(7)of this Clause and,if required by the Contractor,return thereof the Contractor's main plant yard in his country of registration or to other destination,at no greater cost.

本条第7款所规定的搬迁建筑设备的合理费用,如果承包人要求,包括将此设备运回到承包人注册国的主要设备堆置场的费用,或运至其他地点的费用,但此费用不得超过运回注册国的费用。

EThe reasonable cost of removal of Constructional Plant under sub-clause (7) of this Clause and, if required by the Contractor, return thereof the Contractor's main plant yard in his country of registration or to other destination, at no greater cost.

本条第7款所规定的搬迁建筑设备的合理费用,如果承包人要求,包括将此设备运回到承包人注册国的主要设备堆置场的费用,或运至其他地点的费用,但此费用不得超过运回注册国的费用。

Millwork contractor to provide cutouts and co-ordinate with General contractor.

提供保险开关和协调的磨光工作承包商与一般承包商。

General contractor shall provide blocking, backing, trimming and all other supports for fixtures not furnished by millwork contractor.

总承包商应提供堵,支撑,修剪和所有其他支持冬天不出具millwork承办。

General contractor shall provide blocking ,backing ,trimming,and all other supports for fixtures not furnished by millwork contractor

总承包人应提供堵,后盾,微调和所有其他支持物不填报承包建厂

第8/100页 首页 < ... 4 5 6 7 8 9 10 11 12 ... > 尾页
相关中文对照歌词
The Long Road
Mus Come A Road
The Road
(I'm A) Road Runner
Road Block
High Road
Papa Won't Leave You, Henry
Road Trip
Further On Up The Road
Long Hard Road
推荐网络例句

I think people in this lifetime in a rebirth.

我觉得人在这一生里其实也在轮回。

He had to tie her hands together.

他不得不把她的双手绑在一起。

Erastus was stopping at Corinth; but Trophimus, when I last saw him was at Miletus, ill.

4:20 以拉都在哥林多住下了。特罗非摩病了、我就留他在米利都。