查询词典 road contractor
- 与 road contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In this Paper taking key technology of road bed in road Han-Lin as study goal,the scientific experiment on physical and mechanical performance as well as law of vibration compaction and theory analysis are systematically made.The compacting mechanism and influence factors on filling road bed with silt are axplored .The effective construction technology on filling road bed with silt are put forward,The construction method are examined in constraction of road Han-Lin.
filling road bed ;本文以邯—临公路工程中的路基关键技术问题为研究目标,对含砂低液限粉土的物理、力学性能及振动压实规律进行了全面系统的科学试验及理论分析,探索了粉性土填筑路基的压实机理及影响因素,提出了一套行之有效的粉性土路基压实施工工艺,并在邯—临公路施工中得到了验证。
-
Qixia District: and Yan Road, Qixia Road, Huadian Road North, agricultural professionals Road, Nanjing-Hangzhou Road, Ma Qun Duan, Xian-Yao Lu, and too new roads, railways and along the MTR lines, Nanjing electroplating factories, spark plugs, printing, the original second woolen mill in Nanjing, Kumho Tire Company, North Yinqiao market, Nanjing Economic and Technological Development Zone, Xianlin University City.
栖霞区:和燕路,栖霞路,华电北路,农业专业人员道,宁杭公路马群段,仙尧路,太新的公路,铁路及地铁沿线,南京电镀厂,火花插头,印刷,原来的第二毛纺织厂在南京锦湖轮胎公司,北银翘市场,南京经济技术开发区,仙林大学城。
-
Jurisdiction: Lixin Ju Wei (Newport establishing a new West Street 2), Sui-wah, Ju Wei (Newport West, 142 compound on the 10th), Ju Wei Xing Yue (Newport West, 152 compound), marine Ju Wei (Newport, West 164 No. 36 -101), Dadong Ju Wei (Chinese University of the Northeast District 371, 104), Onishi Ju Wei (CUHK Po Park 641 on the ground floor), the Peninsula Ju Wei (Binjiang Road 71), Jiangyijuwei (new Phoenix one of the Backstreet on the 2nd floor, 2), Jiashijuwei (Jia Yun Street 7), Jinyajuwei (54 Riverside Road, 2nd Floor, No. 27), Ju Wei Yi Lok (Yi Lok Jiuxiang 1), Pan-gui Ju Wei (No. 57 Newport West Side), Nam Kyung-Ju Wei (Newport Road, No. 68, Ground Floor, 9), Hai Kang Ju Wei (Newport West 151-11-201), Mr Lok Ju Wei (Yi Lok Road 70 No. 49 compound), the Jubilee Ju Wei (Newport Road West Second Street S8 Millennium Hall).
辖:立新居委(新港西立新街2号)、穗华居委(新港西142号大院10号)、兴怡居委(新港西152号大院内)、海洋居委(新港西164号36号—101)、中大东居委(中大东北区371号104)、中大西居委(中大蒲园区641号地下)、半岛居委(滨江东路71号)、江怡居委(新凤凰后街2号之一2楼)、嘉仕居委(嘉韵街7号)、金雅居委(滨江东路54号27幢2楼)、怡乐居委(怡乐九巷1号)、攀桂居委(新港西57号侧)、南景居委(新港西路68号9座地下)、海康居委(新港西151-11-201)、祈乐居委(怡乐路70号大院49号)、银禧居委(新港西路千禧二街S8栋)。
-
And the difference between the two sums shall be expressed in the said certificate as a balance due to the Trade Contractor from the Employer or to the Employer from the Trade Contractor as the case may be.
以上两总额如有差异,应该最终证明书中陈述,作为甲方应付专业承包商的款项,或专业承包商应付甲方款项或任何有可能的情况。
-
If the Contract does not contain any rates or prices applicable to the varied work, the rates and prices in the Contract shall be used as the basie for valuation so far as may be reasonable, failing which, after due consultation by the Engineer with the Employer and the Contractor, suitable rates or prices shall be agreed upon between the Engineer and the Contractor.
如果合同中未包括可适用于变更后工程的单价或价格,则合同中单价及价格只要合理,也可作为估价的基础,如果不适用,在与承包人及业主协商后,由工程师与承包人商定一个合适的单价或价格。
-
Of building contractor, sub-contractor, and supplier on a separate sheet.
请将其他建筑商及供应商的名称,位址及电话,另列提交。
-
Acceptance Criteria Activity Duration Estimation; Activity Definition; Activity Sequencing; Addenda Approved budget Arbitration Award of Contract ; Award Criteria Audits Balanced Matrix; Baseline Bill of Quantities Brainstorming Characteristic Checklists civil engineering civil building Claims Clarify Closing Communication Management Communications Planning Communications Skills Communication channels or paths Completion Computer-based Concrete structure Conditions of Contract Conflict Management Contract Management Contract administration Change Control Contract Closure Contract file Contract agreement; Contractual obligations Contractor Contractor's Representative Construction Management Planning Contract Price Control Chart Cost Estimating; Cost of Quality Cost Control Cost Budgeting Cost Management Co-operation Failure costs Critical Path Feedback Fixed-price Fossils Force Majeure Daywork Functional Organization Decision; Fundamental Tenets Decision Tree Defects Liability Definitions Delphi technique General Rules Deliverables General Provisions Deviation; Generation Direct Costs Discounted cash flow; Dissemination Highway engineering; Discharge Human Resource Management; Disputes Human Resource Planning Drawings Hydraulic engineering; Hydroelectric engineering; Employer's Taking Over Identity Certificate Evaluation of Tenders Initiating Process Group; Executing Process Group Instructions to Tenderers Industrial building Investment payback analysis; Ineffective Individual and team performance Information Distribution Negotiation Indirect Costs Nominated Subcontractors Incentive bonus Information Technology Interpretation; Insurance Observation Inspections Off-site Online On-the-job training Opening of Tender
验收标准活动时间的估计;活动的定义;活动序列分析;增编核定预算仲裁授予合同;授标标准审计平衡矩阵;基线工程量清单集思广益特性清单土木工程民用建筑索赔澄清闭幕通信管理通信规划沟通技巧沟通渠道或路径完成以计算机为基础的混凝土结构合同条件冲突管理合同管理合同管理变更控制合同结束合同文件合同协议;合同义务承包承包商的代表规划建设管理合同价格控制图成本估算;质量成本成本控制成本预算成本管理合作失败成本关键路径反馈固定价格化石不可抗力计日工职能组织决定;基本原理决策树缺陷责任定义德尔福技术的一般规则交付的一般规定偏差;代直接费用贴现现金流量;传播公路工程;放电的人力资源管理;争端的人力资源规划图纸水利工程;水电工程;雇主接管身份证书评标启动过程组;执行过程组指示的投标工业建设投资回报分析;无效个人和团队的业绩信息分配谈判指定分包商的间接费用激励奖金信息技术解释;保险观察视察场外在线在职培训开幕投标
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。来源:英语博客 http://space.englishcn.com
-
In the event of any repeat of a performance test failing for reaso imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in A endix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
- 相关中文对照歌词
- The Long Road
- Mus Come A Road
- The Road
- (I'm A) Road Runner
- Road Block
- High Road
- Papa Won't Leave You, Henry
- Road Trip
- Further On Up The Road
- Long Hard Road
- 推荐网络例句
-
I think people in this lifetime in a rebirth.
我觉得人在这一生里其实也在轮回。
-
He had to tie her hands together.
他不得不把她的双手绑在一起。
-
Erastus was stopping at Corinth; but Trophimus, when I last saw him was at Miletus, ill.
4:20 以拉都在哥林多住下了。特罗非摩病了、我就留他在米利都。