英语人>网络例句>road contractor 相关的网络例句
road contractor相关的网络例句

查询词典 road contractor

与 road contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]

At end of each mouth the Contractor shall deliver to the Engineer a priced statement of the labour, materials and the Contractor's Equipment, except as aforesaid, used and the Contractor shall be not entitled to any payment unless such lists and statements have been fully and punctually rendered. Provided always that if the Engineer considers that for any reason the sending of such lists or statements by the Contractor, in accordance with the foregoing provision, was impracticable he shall nevertheless be entitled to authorize payment for such work, either as daywork, on being satisfied as to the time employed and the labour, materials and Contractor's Equipment used on such work, or at such value therefore as shall, in his opinion, be fair and reasonable.

每个月末,承包人应向工程师送交一份不包括上段内容的所用劳务,材料,承包人的机械设备并标有价格的结帐清单,如承包人未能将此结帐单与报表开列齐全,准时提交,则承包人无权获得任何款项,但是如工程师认为按上述规定,承包人的清单和结帐单的呈报由于任何原因而实际无法做到,则工程师仍然有权核准此等工作款项,该项款项或按计日工计算(工程师必须对该工程所雇的劳力,时间,所用的材料和承包人的设备情况表示满意)或按工程师认为公平合理的该项工程的价值计算。

China's "Highway Engineering Technical Standards" will be divided into high-level road according to technical quality, sub-senior, middle and low-level four kinds, all kinds of road surface types are as follows: Senior Pavement - asphalt concrete pavement, cement concrete pavement, plant mix asphalt crushed stone pavement, stone pavement of rocks or neat; second high-level road surface - asphalt penetration-style pieces, gravel road, asphalt road debris, gravel road, asphalt road surface, Treatment, semi-neat stone pavement; middle road - broken, gravel (size distribution, or clay-bound) road surface, irregular stone pavement, other granular surface; low road - aggregates stabilized soil surface, and other local materials, reinforcement or improvement of soil surface.

中国《公路工程技术标准》将路面按技术品质分为高级、次高级、中级和低级四种,各种路面的面层类型如下:高级路面——沥青混凝土路面,水泥混凝土路面,厂拌沥青碎石路面,整齐石块或条石路面;次高级路面——沥青贯入式碎、砾石路面,路拌沥青碎、砾石路面,沥青表面处治路面,半整齐石块路面;中级路面——碎、砾石路面,不整齐石块路面,其他粒料路面;低级路面——粒料加固土路面,其他当地材料加固或改善土路面。

Now the Condition of the above-written Guarantee is such that if the Contractor shall duly perform and observe all the terms provisions conditions and stipulations of the said Contract on the Contractor's part to be performed and observed in accordance with the true purport intent and meaning thereof or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sustained by the Employer thereby up to the amount of the above-written Guarantee then this obligation shall be null and void but otherwise shall be and remain in full force and effect but no alteration in terms of the said Contractor or in the extent or nature of the Works to be executed, completed and defects in the Works remedied thereunder and no allowance of time by the Employer of the Engineer under the said Contract nor any forbearance or forgiveness in or respect of any matter or thing concerning the said Contract of the part of the Employer or the said Engineer shall in any way release the Guarantor from any liability under the above-written Guarantee.

现在在之上书面保证的条件是这样如果承包商将执行和适当地将观察前述合同的所有期限供应条件和规定在承包商的零件执行和被观察与真实的主旨意向符合和意思因此或如果在缺省由承包商保人将满足和将释放损失由雇主遭受因此由相当数量在之上书面保证决定然后这义务将是除消并作废的但否则将是和将依然是在充分的力量和作用但没有改变根据前述承包商或在工作被执行,被完成和瑕疵的程度或本质在工作由工程师的雇主补救在其下和没有任一件问题或事容限时间根据前述合同亦不任一忍耐或饶恕或尊敬关于雇主或前述工程师的部份的前述合同在任何情况下发行将保人从任一个责任在在之上书面保证之下。

"Sub-contractor" includes owners and operators of vessels, stevedores, terminal, warehouse, depot and groupage operators, road and rail transport operators and any independent contractor employed by the Carrier in the performance of the carriage and any sub-sub-contractor thereof.

"分立契约人"(SUB-CONTRACTOR)包括船舶所有人及经营人,装卸工人,码头、仓库、集装箱储运站经营人及拼箱经营人,公路及铁路运输经营人,及承运人雇佣的用以进行运输的任何独立订约人,以及其小分立契约人(SUB-SUB-CONTRACTOR)。

Can think that road traffic safe program is government and its function department is , make the personal casualties of road traffic accident lose with property in program issue fall to the goal intended, determine in the traffic safe measure and action and its enforcement that person, vehicle, road and environment should adopt with the aspects such as management sequential, it is different levels people's government and its function department science develop the road traffic at will sexual major basis and important means of blindness of working and preventing road traffic safely working decision safely , it is strategy and the direction of road traffic safe development, have the scientificness of guaranteeing road traffic safe management and avoid decision fault before Zhan sexual role, have important strategic meaning for preventing road traffic accident.

可以认为,道路交通安全规划是政府及其职能部门为使道路交通事故的人员伤亡和财产损失在规划期内降至预定的目标,确定的在人、车、路、环境和管理等方面应采取的交通安全措施和行动及其实施时序,是各级人民政府及其职能部门科学开展道路交通安全工作、防止道路交通安全工作决策的随意性和盲目性的主要依据和重要手段,是道路交通安全发展的方向与战略,具有保证道路交通安全管理的科学性及避免决策失误的前瞻性作用,对预防道路交通事故具有重要的战略意义。

This year is the overall plan for the implementation of the initial years, Zhenjiang City, will focus on the completion along the Zhongshan East Road, Zhongshan West Road, the Yangtze River Road, Power Road, Mengxi Road as "one ring", Changjiang Road, Kwun Tong Road two main entrances and exits for "second-line", the market mouth, Jinshan scenic areas, the railway station square as a "3" the main urban night lighting layout so that important buildings as the "point", it is important to the road as a "line" of the central urban area forming the basic framework night.

今年是为最初几年实施的总体规划,镇江市将重点对沿中山东路,中山西路,长江路,强国之路,蒙西路"一环"完成后,长江路,观塘道两个主要入口和出口的"二线",市场口,金山风景区,作为"3"的主要城市夜景照明布局火车站广场,以便为"点"的重要建筑,它是重要的道路,是一个"行的中心城市形成基本框架夜间区"。

Outlined in the Beijing Olympic Games, at 13:30 on August 13 Switzerland and France than was Ankan Qiela La Road Cycling Championship. Ankan Qiela La France in the World Championships: 2004 Bardolino, Italy was eighth, 2005 Madrid, Spain, was third, 2006 Salzburg, Austria received first place in 2007 at Stuttgart, Germany was the first ; France 2005 cycling sai Laise Skopje was seventh; Flanders Cycling Grand Prix E3 second place; Belgium Harelbeke 2007 Road Cycling sai second place; Florence - Bicycle sai Pistoia, Italy Paper 2004 Si Tuoya fourth; Ghent - Victoria Buddhist roots bike sai fourth; Road Cycling Events, the Belgian peacekeepers Buddhist roots fourth in 2006 Belgian peacekeepers were sixth Buddhist roots; HEW Classic Bicycle Germany 2005 Hamburg Road Cycling sai fourth in the 2006 German Beer, Luke second Challenge; Milan - San Remo Road Cycling sai second place; San Remo, Italy, the 2008 Road Cycling sai was the first; Monte Siena, Italy 2008 Paschi Eroica Road Cycling sai was the first Swiss national championships, in 2008 Switzerland was the first Messen; Stettlen 2007 Switzerland was the first in 2006 was the first Ruishiboning root 2005 Switzerland was the first Hagendorn; Highway Cycling Merit 2007 Rui Shibu Kruger was second in Paris - Roubaix bicycle sai , 2006 France was the first Roubaix; Roubaix France was second in 2008; 2005 Roubaix France was eighth; Denmark Post bike sai The 2006 final ranking was the first Danish Frederiksberg; ring The 2006 Belgian Flanders Cycling Road Cycling sai Meerbeke was sixth; Etruscan - Adriatic bike sai , 2008 Italy's Benetton and child care - Badelt-care was the first in the Central bike sai Luxembourg, Luxembourg Central Di Jixi 2005, was second; bike sai Central California, the United States in 2008 in Pasadena, California, was fourth ; Athens, Greece in 2004 was the 10th individual time trial; Olympics

瑞士法比安坎切拉拉在世界锦标赛:2004 意大利巴多利诺上获得第八名,2005 西班牙马德里上获得第三名,2006 奥地利萨尔茨堡上获得第一名,2007 德国斯图加特上获得第一名;2005 法国莱塞比耶自行车赛获得第七名;佛兰德E3自行车大奖赛获得第二名;2007 比利时哈勒尔贝克公路自行车赛获得第二名;佛罗伦萨-皮斯托亚自行车赛,2004 意大利皮斯托亚获得第四名;根特-维佛根自行车赛获得第四名;公路自行车赛 2005 比利时维佛根获得第四名;2006 比利时维佛根获得第六名;HEW自行车经典赛 2005 德国汉堡公路自行车赛第四名;2006 德国比尔,路克挑战赛第二名;米兰-圣雷莫公路自行车赛获得第二名;2008 意大利圣雷莫公路自行车赛获得第一名;2008 意大利锡耶纳 Monte Paschi Eroica 公路自行车赛获得第一名;瑞士全国锦标赛,在2008 瑞士Messen 获得第一名;2007 瑞士Stettlen 获得第一名;2006 瑞士伯宁根获得第一名;2005 瑞士Hagendorn获得第一名;公路自行车赛 2007 瑞士布鲁格获得第二名;巴黎-鲁贝自行车赛,2006 法国鲁贝获得第一名;2008 法国鲁贝获得第二名;2005 法国鲁贝获得第八名;丹麦邮政自行车赛决赛排名赛 2006 丹麦腓特烈斯贝获得第一名;环佛兰德自行车赛 2006 比利时Meerbeke 公路自行车赛获得第六名;伊特鲁里亚-亚得里亚海自行车赛,2008 意大利圣贝内代托-德尔特龙托获得第一名;在环卢森堡自行车赛,2005 环卢森堡迪基希,获得第二名;环加利福尼亚自行车赛,在2008 美国加利福尼亚帕萨迪纳,获得第四名;2004 希腊雅典个人计时赛获得第十名;奥运会 2008 北京奥运会男子公路个人赛季军。

At the moment, the road maintenance contractors are spit into council road, state road and federal road packages, 3 contractors on Federal road maintenance, and one contractor for all the council roads maintenance which includes the DBKK roads in Kota Kinabalu.

目前,道路维修工程分为市议会道路,州管道路和联邦横贯公路,其中承包联邦横贯公路的维修有三家和一家承包商则主管所有市议会的道路维修,其中也包括亚庇市的道路。

Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.

如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。

The Owner shall inform the Contractor in writing of all claims arising under this provision withindays of the detection of fault, if the Contractor's representative is on Site or withindays if not, to the Contractor's head office by telex recorded air mail delivery with supporting data.

发现问题后,如果承包商的代表在现场工作,业主应在×天内按本条款以书面形式向承包商提出全部要求;如果承包商的代表不在现场,业主应在×天内以航空邮件将确证材料发往承包商总公司。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
The Long Road
Mus Come A Road
The Road
(I'm A) Road Runner
Road Block
High Road
Papa Won't Leave You, Henry
Road Trip
Further On Up The Road
Long Hard Road
推荐网络例句

I think people in this lifetime in a rebirth.

我觉得人在这一生里其实也在轮回。

He had to tie her hands together.

他不得不把她的双手绑在一起。

Erastus was stopping at Corinth; but Trophimus, when I last saw him was at Miletus, ill.

4:20 以拉都在哥林多住下了。特罗非摩病了、我就留他在米利都。