英语人>网络例句>river water 相关的网络例句
river water相关的网络例句

查询词典 river water

与 river water 相关的网络例句 [注:此内容来源于网络,仅供参考]

Due to the increase of water pumpage and the sand excavation at the river bed, the groundwater table became declined and water quality degraded in Dongwu water sources City.

泰安市东武水源地近年来由于开采逐年增加、河床挖沙等因素的影响,水源地附近地下水环境出现了水位下降、水质退化等环境地质问题。

Through the guidance of professional, we knew to get Xian Jie area before evaporate, lest bilge hampers vapour permeates the skin; Want after clean face thin use currents and other characteristics of a river moist frost, lest heat up steam burnable skin; The hot water of 90 ℃ above is put in washbasin again after all these is finished, wrap up good hair, shut eye Fu body; Face and washbasin want apart 10 centimeters or so, if feel stivy, can look up with dry down towel gently blot is facial drip, rest moment changes hot water to continue again fuming or steaming-treating diseases with fumes as in moxibustion or with steam generated by boiling medicine herbs, relapse so 2-3 second, need about 15 minutes in all; After steam is fumed rinse in time with Wenshui, take a side with cold water, frost of nutrition of the Tu Xie after wiping.

经过专业人员的指导,我们知道了在蒸面前得先洁面,以免污垢妨碍蒸汽渗透皮肤;洁面后要薄施水性滋润霜,以免热汽灼伤皮肤;这一切完成后再在脸盆中放入90℃以上的热水,包扎好头发,闭目俯身;脸与脸盆要相距10厘米左右,如感到气闷,可抬头用干软毛巾轻轻吸干面部水珠,休息片刻再换热水继续熏蒸,如此反复2-3次,共需要大约15分钟;汽熏后及时用温水冲洗,以凉水拍面,擦干后涂些营养霜。

Through the establishment of water environment management information system of Supa River basin, an improved BP neural network model made for the comprehensive assessment on the water quality of the basin concerned is presented in accordance with the condition with better water quality and without any principal economic industries therein.

通过建立苏帕河流域水环境管理信息系统,针对苏帕河流域没有主要经济产业、水质较好的状况,侧重于介绍建立改进的 BP神经网络模型对流域的水质进行综合评价。

The import of so much suspended sediment, water pollution and saline water invasion had greatly imperilled the water environmental sustainable development of Pearl River Estuary.

珠江口是我国南方最大的河口,也是华南人口最集中、经济最活跃的地区。

Three ideal developing patterns of groundwater are suggested according to the study in the Liaoning region.1 Shoushan pattern: river and reservoir water to irrigate, and the water percolates into the ground and recharges the water-bearing layer, then pumping the groundwater to supply the industry and city.

在地质历史时期和人类历史时期,地质环境在各种要素的作用下处在不断的变化之中,而且地质环境要素本身也在不断变化之中,不断有新的影响因素产生和加入,而人类的出现及其工程活动则是这些新增加的影响因素中最为重要、最为积极、影响力在急剧膨胀的因素。

Aqueduct Bridge is a sort of structure on stilts by transporting water spanning river, valley, billabong and road etc, it also can drainage floodwater and diversion excepting water transfer, it is the most abroad across building applied in the middle of irrigated area water project construction, not only quantity is great but also technology is complicated.

渡槽是一种输送渠水跨越河渠、山谷、洼地和道路等架空建筑物,除了输水外还可排洪水、导流等之用,是灌区水工建筑物中应用最广泛的一种交叉建筑物,不仅数量大,而且技术复杂。

Try in make clear, hydraulic pressure shovels dredger, grab bucket to shovel dredger construction efficiency instead instead taller, dredge of dredger of grab bucket type shovels type dredger to affect degree small; to wring dredger suction type to water environment than turning over, contain a lot ofas a result of bottom mud sundry, suction inlet jams extremely easily, apply to; of dredge of mud of Suzhou river bottom to undertake to groovy grab bucket environmental protection is transformed hard, the influence of earth of hourglass of leakage of the grab bucket in reducing dredge process significantly to water system water quality, be worth promotion application.

中试表明,液压反铲挖泥船、抓斗反铲挖泥船施工效率较高,抓斗式挖泥船疏浚比反铲式挖泥船对水环境影响程度小;绞吸式挖泥船,由于底泥富含杂物,吸口极易堵塞,难以适用于苏州河底泥疏浚;对常规抓斗进行环保改造,显著减少疏浚过程中抓斗漏水漏土对水体水质的影响,值得推广应用。

After this process completed, pours the water back to the bucket and put alums into the water lay aside to the second day, and bring the water back to the Yangtze River at the old route to pours in.

这一过程完成后,将水重新倒回桶中,放入明矾,搁置至当日,再将水原路带回倒于江中。

They are the carry-over of the streams, the sediment releasing and the carry-over of the water from Qiantang River. Estimated the total phosphorus data of them as the boundary condition in calculating, Then according to the actual water diversion and water distribution of the West Lake of the four seasons in 2004, the source of total phosphorus and the data of the 11 concentration field measuring point, inversion analysis was carried out, then the comprehensive sedimentation constant k was obtained.

以总磷为模拟指标建立了水质模型,在入湖总磷负荷来源分析及测算的基础上,确定了西湖总磷的主要来源为入湖溪流携带、西湖底泥释磷、钱塘江引水携带,并测算了具体的数值作为浓度场计算的边界条件。

For each strategy, a corresponding exploitation plan of groundwater was designed. Then each designed exploitation plan (except scheme 3) was put into the model for calculation and simulation. The analysis on the forecasting results every plan indicates that:(1) Shuting down the self-provided wells is the most direct and effective method, playing an important role in the land subsidence prevention.(2) The resumption of compressed soil by groundwater artificial recharge is limited. So the artificial recharge can\'t provide essential effect for the resumption of land subsidence, unless the artificial recharge is much more than the groundwater withdrawal.(3) The method of "adjusting the exploitation stratum of groundwater to the shallow" has an obvious effect on the land subsidence prevention.(4)"Sand wells" can increase the leakage recharge for confined aquifer, and thus can slow and prevent the development of the land subsidence.(5) For the groundwater exploitation in Xi\'an, emergency self-provided wells should be managed according to the well spacing of 1600m, 2000m and 1600m, respectively, in the river terrace area, alluvial-proluvial fan area and loess tableland area to exploit the first confined groundwater. Corresponding individual well yield can be set as 2500m~3/d, 1500 m~3/d and 200 m~3/d. Make emergency self-provided wells pump in the dry year and stop pumping groundwater to restore and conserve underground water sources in average years and wet years. In this way, groundwater withdrawal of 162000m~3/d can be obtained to provide for the supplement of water supply in Xi\'an. As a result, the water supply stress can be released in dry years. The groundwater depression formed in the exploiting year can resume in 3-4 years. At the same time, this exploitation manner will not lead to obvious land subsidence.

本文利用所建的模型预测了现状开采条件下未来20年的地下水位和地面沉降的变化,在此基础上,提出了防治西安市地面沉降的五个地下水开采方案,利用所建的地面沉降模型对各个设计方案其进行了模拟和预报,对预测结果的分析表明:①封停自备井是防治地面沉降最为直接和最有效的对策,对防治地面沉降起着最为积极的作用;②采用人工回灌方法使被压缩的土层得到的恢复是非常有限的,对地面沉降不能起到根治作用,只有回灌量明显大于开采量时才能有一定的效果;③&调整开采层次,在浅层取水&对防治地面沉降的效果十分明显;④布设&砂井&可以增加对承压含水层的越流补给量,从而可以有效地缓解和控制地面沉降的发生和发展;⑤对西安市的地下水开采,可在河流阶地区、冲洪积扇区和黄土塬区分别采用1600m、2000m、1600m的井间距布置应急自备井,分别采用2500m~3/d、1500 m~3/d和200 m~3/d的单井开采量,开采第一承压水,在平水年或者丰水年不开采,涵养地下水源,在枯水年启动这些应急自备井开采,在输出分析范围内共可获得162000 m~3/d(5913万m~3/a)开采量,可以有效地补充西安市的供水水源,缓解供水紧张局面,开采年开采导致的下降的水位可在停采3~4年后得到基本恢复,同时,这种开采方式不会造成大的地面沉降量。

第31/100页 首页 < ... 27 28 29 30 31 32 33 34 35 ... > 尾页
相关中文对照歌词
The Water Is Wide / Deep River
You Don't Miss Your Water (Till Your River Runs Dry)
推荐网络例句

We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.

索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。

The relationship between communicative competence and grammar teaching should be that of the ends and the means.

交际能力和语法的关系应该是目标与途径的关系。

This is not paper type of business,it's people business,with such huge money involved.

这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。