查询词典 river outlet
- 与 river outlet 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
However, it is preferred that the terminal edge 30b of outlet channel 30a is in facing engagement with the inner surface in registry with a peripheral edge of the louvered vent 16a to urge air directly out of the air outlet 16 from the housing 12 to improve airflow through the airflow path.
然而,优选地,出口通道30a的终结边30b与内表面相接合,并与百叶式通风口16a的外围边配准,以便推动空气直接从外壳12经空气出口16流出,从而改善经过气流通路的空气流。
-
Always attach plug to appliance first, then plug cord into the wall outlet. To disconnect, turn any control to off, then remove plug from wall outlet.
一般先将插头装置在电器上,然后插入插座中,断开电源时,先将电器的控制开关关闭,然后从插座中取出插头。
-
Through analyzing many problems on outlet drainage work from Nanyi Minor Zoon of Fuxin, in the work under construction, the paper lays stress on the systematic planning of outlet drainage from this minor zoon, which is of much importance to both the work design and its operation.
通过对阜新南驿小区室外排水工程建设中若干问题的分析,强调住宅小区室外排水系统的规划,对设计和施工是非常重要的,若不认真对待,不仅影响到生产和生活,还将会对周围水环境造成污染。
-
No Ⅲ° atrioventricular conduction block happened, 9 patients developed right bundle branch block, and 2 patients showed junctional rhythm. Two patients with perimembranous extending outlet were repaired because of residual shunt(0.4cm,0.3cm) on the anterosuperior rim of defect. One patient with trivial residual shunt(0.15cm) on the posteroinferior rim of defect was found closed spontaneously six months later. Tricuspid valve was incised in 10 patients of VSD sextending outlet,8 patients vertical to the valve ring,2 patients parallel to the valve ring. Moderate tricuspid valve regurgitation was found in 1 patient, mild in 5 patients, trivial in 4 patients. No one aggravated. One patient complicated with pericardial effusion.
无Ⅲ°房室传导阻滞发生,9例发生右束支传导阻滞,2例结性心律。2例膜周偏流出道型VSD患者因前上缘残余分流分别为0.4cm和0.3cm,再次手术修补;1例后下缘残留细束样分流,直径0.15cm,随访6个月后自愈;10例膜周偏流出道型VSD患者剪开三尖瓣,8例垂直瓣环,2例平行瓣环;1例三尖瓣中度反流,随访无加重;5例轻度反流,4例轻微反流,随访均无加重;1例心包积液;1例再次进入手术室止血。
-
The most heavy flow ability of barrage swirl is controlled by fastenning device and barrage size, the most heavy discharge is more when barrage aperture is bigger, the influence of barrage position on discharge is not obvious; The pressure of the end of the shaft and fastenning device increases which aroused by barrage, and there is a restraining action to flow waving of the shaft; The barrage aperture is smaller, the increase of pressure is heavier, the influence of position to the increase of pressure is not obvious; The positive pressure of the level section in the hole between fastenning device and barrage increases obviously, the change of press along length reduces, mural press in the hydrosphere separating area of outlet of fastenning device becomes positive pressure, which is propitious to the increase of flow cavitate number in the low pressure area of the outlet of fastenning device; The influence of change of swirl cavum diameter caused by barrage to ventilating state is obvious.
阻塞旋流最大泄流能力由起旋器及阻塞体型共同控制,降低了泄洪洞的泄流量,孔径大的阻塞最大下泄流量较大,阻塞位置对泄流量的影响不明显;阻塞引起竖井及起旋器端头压力增大,对竖井部分的水流波动具有抑制作用;阻塞孔径越小,压力增加越大,位置对压力增大影响不明显;起旋器与阻塞之间水平洞段的止压力明显增加,沿程压力变化减小,起旋器出口的水气分离区壁面压力变为正压力,有利于起旋器出口低压区水流空化数的提高;阻塞引起的旋流空腔直径变化对通气状态产生明显影响。
-
The invention belongs to the fluid measuring technical field and relates to an oil, gas and water three-phase oil well continuous gauging device, which comprises a high-efficient gas-liquid separator; the high-efficient gas-liquid separator is connected with an oil, gas and water three-phase inflowing port; a gas phase outlet of the oil, gas and water three-phase inflowing port is connected with a gas phase measuring pipeline; a gas path temperature sensor, a gas path pressure sensor and a gas path endocone flowmeter with high-frequency differential pressure transmitter are arranged on the gas phase measuring pipeline; a liquid phase outlet of the high-efficient gas-liquid separator is connected with a liquid phase measuring pipeline; a liquid path Coriolis mass flowmeter and a liquid path endocone flowmeter are arranged on the liquid phase measuring pipeline; and the cross section of the pipeline for mounting the liquid path Coriolis mass flowmeter is more than the cross section of the pipeline for mounting the liquid path endocone flowmeter.
本发明属于流体测量技术领域,涉及一种油、气、水三相油井连续计量装置,包括高效气液分离器,高效气液分离器与油、气、水三相流入口相连,其气相出口与气相测量管路相连,在气相测量管路上装有气路温度传感器、气路压力传感器、带有高频差压变送器的气路内锥流量计;高效气液分离器的液相出口与液相测量管路相连,在液相测量管路上装有液路科氏质量流量计和液路内锥流量计,安装液路科氏质量流量计的管路的截面积大于安装液路内锥流量计的管路的截面积。
-
It has been found from inspection that the main causes leading to somewhat larger electric current of said induced draft fan are as follows;(1) Top corrosion in outlet flue duct of the activator;(2) Fallaway of guide plates in outlet of the activator;(3) Air leakagein due to wornout of the flue duct .
检查发现活化器出口烟道顶部腐蚀、活化器出口导流板脱落、烟道磨损漏风是导致2号锅炉引风机电机电流偏大的主要原因。
-
Hippocrene Plumbing Supply recently opened a wholesale outlet in the location once occupied by the Cumquat Café Restaurant. Hippocrene has apparently been quite successful there because it is planning to open a large outlet in a nearby city.
Hippocrene 铅管供应商在一度为 Cumquat 咖啡店的地方开了一家直销店……Hippocrene 现在相当的成功,因为他们正计划在临近城市开一家大的直销店。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
-
A method for cold transportation of goods that are placed in a hollow-walled refrigerating container, comprising the following steps: storage of a pumpable solution of tiny ice crystals, known as binary ice, having a given composition and temperature, in a binary ice store until said binary ice is used for refrigerating or filling purposes; the optionally filled wall of the refrigerating container that is to be used is emptied via an outlet valve for the binary ice; binary ice is allowed to circulate inside the refrigerating container via filling instruments that are supplied with binary ice from the binary ice store until the temperature of the wall drops to a given temperature, whereby the heated fluid that is discharged from the outlet valve is fed to a binary ice fluid store; the wall of the refrigerating container is filled with a given amount of binary ice; the refrigerating container is decoupled from the filling instruments; the binary fluid that result from the melted binary ice is returned to a corresponding binary fluid store in order to produce new binary ice from said binary fluid.
一种置于一中空壁制冷容器里的制品的冷运输用的方法包括下列诸步骤:将一种具有一预定的组成和温度的可被泵送的小的冰晶体的溶液保存在一个二元冰储槽中,直到所述的二元冰用于制冷或充填目的;通过一二元冰出口阀将待被使用的一制冷容器的随意被充填的壁排空;用二元冰充入该制冷容器的被排空的壁内;通过充填器具使该二元冰在该制冷容器里循环,这循环由来自二元冰储槽的二元冰供给,直到壁温下降到一预定值,从而从该出口阀放出的被加热的流体被提供给一个二元冰流体储槽;将一给定量的二元冰充入该制冷容器的壁里;从诸充填器具上拆离该制冷容器;将从溶化的二元冰形成的二元流体返回到一相应的二元流体储槽内,以便从所述的二元流体制取新的二元冰。
- 相关中文对照歌词
- Superman / Cry Me A River (Remix)
- Cry Me A River
- Cry Me A River
- Cry Me A River (Official Remix)
- River Boy
- Birdhouse In Your Soul
- Dog River Blues
- Ghost Ship
- Proud Mary
- Flow
- 推荐网络例句
-
" I' d like to get some rough idea about music in the baroque ear, please."
请简要介绍一下巴罗克时期的音乐,好吗?
-
The results showed that the peak latency and pattern of SEPs elicited by electrical needling in LI-l1 and MP were similar. The amplitude of SEPs elicited by electrical needling in LI-l1 was higher than that of MP. There was no obvious SEPs generation when MM was electrical needling.
结果显示,电针刺激曲池穴和其邻近桡侧伸腕长肌运动点诱发性脑电波的波形和波峰时间是类似的,只是穴位的诱发性脑电波波幅较大,而电针刺激非穴位点并没有明显的诱发性脑电位。
-
Mom and Dad better bone up on these not so ordinary competitions like polo, yachting and synchronized swimming!
爸爸妈妈更好的骨落实这些不是普通的比赛一样,水球,帆船和花样游泳!