英语人>网络例句>risk 相关的网络例句
risk相关的网络例句
与 risk 相关的网络例句 [注:此内容来源于网络,仅供参考]

When the hospital is evadable to the risk, the best countermeasure is that let the hospital take on part risk, and obtain the hospital's cooperation.

其实质上是医疗费用风险在保险人与医院之间的最优分配,以减少交易费用,达到控制医疗费用不合理增长的目的。

And then the optimal incentive mechanism and its characteristics are given by optimization first-order condition when employees are risk neutral or risk evadable.

通过最优化一阶条件分别求解员工风险中性与风险规避时的最优激励机制,并分析最优激励机制的特点。

Then, interruptible load is introduced into transmission congestion management in the paper. The paper discusses the application of interruptible load to transmission congestion management in power pool market. Market risk of evade is very important in transmission congestion management. The FGR, FTR, TO are introduced into transmission congestion management, its concept and implement in bilateral market are discussed in the paper. It provides the valid means of evadable price risk for the market participant. The reasonable allocation of congestion cost is very important in transmission congestion management. The paper proposed a novel methodology for allocation of congestion cost based on the line flow analysis.

然后,将可中断负荷引入到输电阻塞管理中,对其在电力联营体交易市场模式下输电阻塞管理中的应用进行了全面阐述;市场风险的规避是输电阻塞管理中需要考虑的重要内容,本文将基于潮流的输电权、金融型输电权及输电期权引入到输电阻塞管理中,阐述了其基本概念以及在双边交易市场模式下的具体实施,为市场参与者提供了规避价格风险的有效手段;阻塞费用的合理分摊是输电阻塞管理中的重要内容,本文提出了一种基于阻塞线路潮流组成分析的阻塞费用分摊新方法。

Results The time of mechanical ventilation in high risk group (18~30h, 26h in average) was longer than that in control group (4~28h, 14h in average)(P.01). Meanwhile, The incidence of fever, chest exfiltration and positive result of sputum culture in high risk group were also higher than that in control group.

结果 高危组患者术后呼吸支持时间(18~30h,平均26h)大于普通组患者(4~28h,平均14h),两组有显著性差异(P.01),同时术后发热、胸片渗出影以及阳性痰培养结果的发生率也高于普通组。

This paper especially study the mathematical theory and the computing methods of VaR model. Using the logormal distribution supposition to appraise the risk of the open style fund, to confirm whether the result is eyen more approaches the real value of risk.

本文着重论述了VaR模型的数学原理以及该模型的计算方法,运用对数正态分布假设来评估开放式基金的风险,以验证其结果是否更加接近实际风险值。

In order to improve accuracy and reliability of risk evaluation of gas outburst fatalness, The grey relation analysis method was used to discuss the theory, process, computation of risk evaluation.

为了提高煤矿瓦斯突出危险性风险评价的准确度和可靠性,采用灰色关联分析方法,研究了瓦斯突出危险性风险评价的理论、过程与计算步骤。

Besides, this thesis empirically analyzes the risk forming and the risk defense in Enron Affair founded on forenamed research methods and fruits.

最后运用本文的研究方法和研究成果,对安然事件的风险形成与风险防范问题进行了实证分析,从新的角度揭示了安然事件的制度成因。

Towards the time of use power price,the paper analyses itsdomestic and overseas research status,and sets forth the theory foundation and rules forhow to establish TOU power price;Considering the aim and risk of power supplycompany when implementing the TOU price,the paper analyses the influencing factors,puts forward the method of how to establish the price system reasonably,proposes somestrategies of how to control the risk.

针对其中峰谷分时电价带来的风险问题,本文分析了国内外分时电价实施现状,阐述了制定分时电价的基础理论和原则;考虑到实施分时电价的目标以及在实施过程中给供电企业带来的风险,对影响分时电价的各个因素进行深入分析,提出了制定合理的分时电价体系的方法,同时在控制分时电价风险上提出了相应的风险规避策略。

It is based on the development of risk in China and foreign and the construction project"s characteristic. Then, by means of system analysis, the paper discusses the elements of a construction project. It is from construction project risk"s source, main body, effect for purpose, the reason, generant modality, and so on.

对工程项目风险因素从工程项目风险的来源、工程项目风险的直接行为主体、工程项目风险对目标的影响、按管理的过程和要素、风险发生的原因、工程项目风险发生的形态、工程项目风险性质的不同角度对工程项目风险进行分析。

Through the comparison and study of risk issue and monitoring measurements of second generation of biotech crops, the author provided the risk management and monitoring measurements to PMPs: develop the regulation to safety assessment of PMPs; set other bioreactor as control when evaluate the intended use; set the non-transgenic iso-line as control when evaluate the food and environment safety; design the product without activity during production of PMPs; using GURT to prevent the gene flow.

通过比较分析国际上对未来新一代转基因作物,尤其是药用转基因作物风险评价与管理对策研究,提出我国对未来药用转基因作物评价与监管的建议:完善药用转基因作物评价规定;对预期使用的评价要以其他生物反应器为对照进行评价;对食用安全与环境安全评价要以其非转基因对照比较;设计产品生产过程中无活性,加工(来源:Adf3fBC论文网www.abclunwen.com)工程中激活;利用遗传限制技术使药用植物花粉不育等。

第87/100页 首页 < ... 83 84 85 86 87 88 89 90 91 ... > 尾页
相关中文对照歌词
Risk It All
Risk It All
Risk
Risk
Risk It All
Running The Risk
Risk My Soul
Flight Risk
High Risk Insurance
Risk It All
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?