查询词典 risk
- 与 risk 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This thesis through criterion and empirical study, qualitative analysis, quantitative analysis and antitheses, taking into account situation of Chinese commercial bank and using for reference foreign popular commercial bank interest rate risk measurement method—VaR model, quantitates interest rate risk faced by Chinese commercial bank, and is searching for Chinese commercial bank interest rate risk measurement method.
本文通过采用规范与实证、定性与定量和对比分析等方法,通过理论分析,并结合我国商业银行利率风险的现状,在借鉴国外商业银行目前广泛使用的利率风险测度技术——VaR模型的基础上,量化我国商业银行所面临的利率风险,探寻适合我国商业银行的利率风险测度方法。
-
Due to the reasons above, the risk problem in the Transnational Corporation financial management is chosen as the subject., with the help of the relevant studies of financial engineering, the risk management and the enterprise management, in this paper the antitheses, the taxonomy and the financial analysis are used to probe into how to improve the capability of risk management in Chinese Transnational Corporation and carry out the financial management based on all the risks in practice.
介于以上原因,本题在跨国公司财务管理问题研究中选择了风险问题作为写作的对象,本文运用了对比法、分类法和财务分析法等,并引入了金融工程学、风险管理学、企业管理学等相关学科的内容,从实际应用的角度出发,探讨如何提高我国跨国公司财务管理中的风险管理能力,实施各项风险基础财务管理工作。
-
For example:Twain Buffalo prefers bank deposit and Dolphin prefers stock;Risk averter prefers bank deposit and insurance, Risk lover prefers foreign exchange and stock and Risk balancer prefers futures.
如台湾水牛较偏好银行存款,海豚族较偏好股票;而风险趋避型较偏好银行存款和保险,风险爱好型较偏好外汇和股票,风险平衡型偏好期货。
-
This paper develops a new risk pre-assessment technology based on HAZOP method;the major work and conclusions are as follows.(1) Bayed on the analyses on characteristics and requirements of pre-risk assessment in process industry, the adaptability of HAZOP to risk pre-assessment was confirmed.
本文开发了一种基于HAZOP技术的过程工业安全预评价技术,完成的主要工作和获得的主要结论如下:(1)分析了过程工业安全预评价的特点和需求,探索了HAZOP技术的适应性,确定了以HAZOP技术为基础的研究方案。
-
If you or your organization has capital that can be invested freely, and would like it appreciate in hi-tech field, or achieve your hi-tech business, or diversify your venture, and at the same time you and your team have the correct perspective of capital appreciation, healthy investment mind and the spirit of cooperation, are willing to accept unexpected investment risk or business risk that may be not prevented by sound risk management and control system due to uncertainty of future, BOHO INTERNATIONAL is happy and ready to work closely with you, help you invest successfully.
如果您与您的机构拥有自由投资资本,愿意在高新技术领域实现资本增值,或有意在高新技术领域有所作为,壮大您的事业,同时您拥有正确的资本增值观念、良好的投资心态、合作与全域意识,愿意承担一定的经过合理防范和控制后但由於未来不确定性还有可能存在的某种程度的投资风险或经营风险,宝号国际乐意与您通力合作,为您的资本增值尽我们最大的努力。
-
Risk management has been regard as the core function of commercial bank by the modern financial theory, and the New Basel had brought forward higher requirement for the building of risk management frame. This thesis will analyze the situation of the precaution of individual housing loan credit risk lengthways and breadthwise, using the method of actual evidences and data analysis.
本文通过运用实证分析、数据分析等方法,在对我国房地产市场和个人住房贷款业务的发展历程回顾的基础之上,对我国个人住房贷款信贷风险防范进行了纵横剖析,并结合对国外个人住房贷款信用风险防范的分析,提出了基于我国实情、借鉴国际经验的完善我国商业银行个人住房贷款信用风险防范体系的建议。
-
This thesis dedicated to research the investment control of BT project, researched the risk in the program construction, the compose portion and the factors effecting the investment. The research includes the conception and the character of the BT project; the actualize process and the questions should be pay attention to; the conditions of BT contract and the sector of the compose poison of the contract price. In this part researched the conception of the BT purchase price and concluded that the relation between the purchase price and the investment. Then studied the risk factors that effect the investment according to the character of the project and then brought forward several advices of the contract item about how to share the risk. Studied compose sector and it's calculatingly methods of the construction cost which is the main part of the investment, then studied how to control the cost during the construct process and analyzed project variations as well as how control that. In the end, researched the capital cost of BT program, the main content include the concept of the capital cost, the calculatingly methods using the engineering economic method, the method writer suggest in the thesis according to the project practice, how to control the capital cost, mainly through setting up an account and inspecting it, and regulating the program financing rate in reason.
本论文的研究重点即BT项目的投资控制,围绕该问题,本论文的主要研究内容有,从BT模式和BT项目的基本分析开始,研究了BT模式的基本概念、BT项目的运作过程、基本特征;研究了BT项目的合同条件和合同价款,该部分分析了BT项目的合同结构、BT项目的承发包工作范围、BT项目的回购价款组成和确定;根据项目建设特征分析了影响BT项目投资的风险因素,并且提出了在对风险进行分配和分担类合同条款制定时建议;建设工程费用是构成BT投资的主体费用,本文对其各组成部分的基本构成、计算方式进行了分析,研究了实施过程中管理控制和工程变更及变更控制的问题;文章的最后对构成BT项目投资的资金成本进行了探讨,分析了资金成本的概念和形成,运用工程经济学的基本理论分析了资金成本各部分的基本计算方式,依据现有的工程实践情况提出了本文建议的计算方式,最后分析了如何对资金成本进行控制――主要通过设立资金账户对其进行监管以及对项目融资的利率进行合理规定。
-
Degree, the risk posed by each toxic substance. OSHA's discussions of individual sub-found at various levels of exposure, but made no estimate of the risk of experiencingthose health effects; instead, OSHA provided a conclusory statement that the new limitwould reduce the "significant" risk of material health effects, without any explanationof how the agency determined what was significant.
OSHA 关于特别物质的讨论包含了那种物质各种各样的研究和各种各样影响程度发现的健康效应的研究总结,但对经历那些健康效应的风险没有做估计;反而, OSHA 提供了一个结论性的声明:新限制会减少物质健康效应&重大&风险,确定什么是重大的部门没有做任何解释。
-
According to the international methods of pest risk analysis and characteristics of urban forestry in Beijing,a quantitative risk assessment system in Beijing for the main non-indigenous pests was proposed.This system was used to analyze three non-indigenous species, Dendroctonus valens,Hyphantria cunea and Apriona swainsoni. The results show that the risk of these three species in the Beijing area is 2.46, 2.30 and 2.02, all highly risky.
该文参照国际上有害生物风险分析方法,结合北京地区城市林业特点,提出北京地区重大外来有害生物风险量化评估体系,并应用该评价体系,进行了红脂大小蠹、美国白蛾、锈色粒肩天牛对北京地区的风险评价。3种有害生物的量化评估值分别为红脂大小蠹2.46、美国白蛾2.30和锈色粒肩天牛2.02,因此对北京地区而言,3种昆虫皆为具高度风险的森林有害生物。
-
In this chapter, the writer explains risk of futures markets comprise mostly market risk and credit risk, and introduces fundamental effectible factors and technical effectible factors.
第五章&期市风险的度量&以上海期货交易所金属铜期货为例,首先介绍了铜期货的概况,接着分析了影响铜期货价格因素,最后通过建立GARCH(1,1)模型来描述铜期货市场的波动性,试图对铜期货的风险进行确认。
- 相关中文对照歌词
- Risk It All
- Risk It All
- Risk
- Risk
- Risk It All
- Running The Risk
- Risk My Soul
- Flight Risk
- High Risk Insurance
- Risk It All
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?