英语人>网络例句>rill 相关的网络例句
rill相关的网络例句
与 rill 相关的网络例句 [注:此内容来源于网络,仅供参考]

The shadows stray through burn and brae and dance in the sparkling rill.Tis night!

阴影通过烧伤和斜坡在闪耀的小溪迷路并且跳舞。

From west to east streams down the tumbling rill.

这翻滚的小河从西向东流去。

Or again, note the meanderings of some purling rill as it babbles on its way, tho' quarrelling with the stony obstacles, to the tumbling waters of Neptune's blue domain,'mid mossy banks, fanned by gentlest zephyrs, played on by the glorious sunlight or 'neath the shadows cast o'er its pensive bosom by the overarching leafage of the giants of the forest .

113再则,请注意那打着漩涡蜿蜒曲折地哗哗淌去的泪泪溪流与拦住去路的岩石搏斗,在习习西风轻拂下,冲向海神所支配的波涛汹涌的蔚蓝领国;沿途,水面上荡漾着灿烂的阳光,两边的堤岸爬满青苔,森林中的巨树那架成拱形的繁叶,将荫影投射于溪流那忧郁多思的胸脯上。

Yet all the precedent is on my side: I know that winter death has never tried The earth but it has failed: the snow may heap In long storms an undrifted four feet deep As measured again maple, birch, and oak, It cannot check the peeper's silver croak; And I shall see the snow all go down hill In water of a slender April rill That flashes tail through last year's withered brake And dead weeds, like a disappearing snake.

《弗罗斯特诗精选》徐淳刚译然而,所有的先例我都已经过:我知道冬天的死亡想占领大地但终究失败:漫长的暴风雪中雪能积到四五尺深,风吹不动当它再一次压住红枫,白桦和橡树,却阻断不了鸟们银铃般的歌声;不久我将看到积雪全从山上滑落融入四月纤细的溪水中那闪光的尾巴穿过去年凋谢的花和枯死的草,像条消失的蛇。

In the paper, we mostly studied the change of soil erosion process by a new REE tracer method, based on the theories of hydraulic mechanical subject and radionuclear tracer method, and simulated rainfall was applied to study the sheet erosion changing to rill erosion and the rill erosion process on slope land. The new REE tracer method should be useful to future studying of erosion processes on slope lands.1. Offering and testifying a new REE displacing method to study on the soil erosion of the loess slope.

本文以黄土坡面土壤侵蚀形态演变规律为研究重点,以新的核素示踪技术为手段,采用水动力学与核素示踪技术相结合、室内人工模拟降雨与稳定性REE元素示踪相结合的方法,利用先进的INAA技术,定量研究了不同雨强次降雨条件下细沟间侵蚀向细沟侵蚀的转变过程、细沟发生发育过程,为深入了解坡面侵蚀过程,建立黄土高原土壤侵蚀预报模型提供了研究基础。

The results indicate that the main erosion type is sheet ero-sion at the beginning of the rainfalls, and serious erosion happens after rill erosion appears. Accumulated sheet and rill erosion amount increases with the rainfalls time. The percentage of sheet erosion amount decreases and rill erosion percent-age increases with time. At the end of the rainfalls, the total rill erosion amounts are 4.3 and 5 times more than sheet ero-sion.

研究结果表明,降雨初期坡面以面蚀为主,细沟出现后,坡面侵蚀将加快加剧;随着降雨时间的延续,累积面蚀量和细沟累积侵蚀量都将逐渐增加,后者的增加速率大于前者,面蚀所占总侵蚀量的百分比随降雨时间呈曲线形式逐渐递减,细沟侵蚀则逐渐增加;试验结束时细沟侵蚀量分别为面蚀量的4—5倍。

Quantitatively studying on the change of accumulated sheet and rill erosion amounts.Sheet erosion rate firstly gradually increased, then rapidly increased and finally remained stable with the rainfalls time, but the rill erosion rate increased more quickly than sheet erosion rate and the value of rill erosion rate was higher than of sheet erosionrate.

定量分析了次降雨条件下累积面蚀量、细沟累积侵蚀量及面蚀率、细沟侵蚀率随时间的变化在试验条件下,随着降雨的进行,坡面面蚀率先缓慢增加趋势后基本保持稳定,而细沟侵蚀率具有随降雨时间急剧增加现象。

The soil erosion process on the slope was clearly divided into sheet erosion stage, rill erosion developing stage and rill erosion stable stage. Before lOminutes of rainfalls, the percentage of sheet erosion amount to total erosion amount was more than 90%, and it indicated that sheet erosion happened on the slope. This percentage sharply decreased before SOminutes of rainfall time, on the other hand, the percentage of rill erosion amount to total erosion amount increased in curve form with rainfall time.

在降雨前10min左右,面蚀贡献率约占坡面侵蚀总量的90%以上,为面蚀阶段;随着降雨时间的延续,面蚀贡献率先急剧递减最后在第30min左右基本达到稳定,细沟侵蚀贡献率则出现相反趋势,此为细沟发育阶段;降雨后期,面蚀和细沟侵蚀贡献率的变化趋势逐渐变缓且基本达到稳定。

Besides, when the experimental soil was clay soil of Yangling, the appearance and developing process of rill erosion happened respectively 12-15min and 4-8min earlier than of silt soil of Shaanbei.Accumulated sheet and rill erosion amounts increased with the rainfalls time, and the latter increased quickly than the earlier. The total accumulated rill erosion amounts were 2.5 and 5.5 times more than accumulated sheet erosion amounts.

黄绵土坡面发生细沟侵蚀的时间早于粘黄土坡面12-15min;坡面细沟侵蚀达到稳定的时间粘黄土坡面也比黄绵土坡面滞后约4-8min;累积面蚀量和细沟累积侵蚀量均随降雨时间的延续而增加,且后者增加幅度明显大于前者;降雨结束时,坡面细沟累积侵蚀量约为累积面蚀量的2.5~5.5倍,约占坡面总侵蚀量的80%以上。

Based on the result of field artificial rainfall experiments on 60m length slopes,sedi-ment delivery is consisted of raindrop impact,slope runoff and rill flow delivery.Accord-ing to their functions,rill was ranked firstly then slope run off,and last raindrop impact.

通过野外60m坡面人工降雨实验及过程结果分析可知:输移由雨滴击溅、坡面径流和细沟输移三部分组成,按作用大小来排,细沟流占第一位,坡面径流占第二位,雨滴击溅最小。

第1/6页 1 2 3 4 5 6 > 尾页
相关中文对照歌词
Rill Rill
推荐网络例句

As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.

每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。

Maybe they'll disappear into a pothole.

也许他们将在壶穴里消失

But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.

但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。