查询词典 requirement
- 与 requirement 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
With the development and progress of society, the requirement of these materials is boosting.
随着社会的发展与进步,对这类材料的发光性能要求也不断提高。
-
The diabetic that has above of 1 / 3 as a result is appropriate to choice, dress the knowledge of shoe, of the requirement of the design that is like a shoe, fabrics, measures, bootlace, time that buy a shoe, new shoe try on the diabetic that waits for knowledge to understand above of insufficient;1 / 3 to lack choice, dress the relevant knowledge of appropriate sock.
结果 有1 / 3以上的糖尿病患者对选择、穿着合适鞋子的知识,如鞋的款式、面料、尺码、鞋带的要求、购鞋时间、新鞋的试穿等知识了解不足;1 / 3以上的糖尿病患者缺乏选择、穿着合适袜子的相关知识。
-
To erase the bootless power dissipation of the redundant transition of the clock, a design method named DET (double-edge-triggered) flip-flop using CMOS transmission gate is proposed. The directly pre-set terminals are increased in the design to meet the requirement for practical application.
本文从消除时钟信号冗余跳变而致的无效功耗的要求出发,提出一种基于CMOS传输门的双边沿触发器设计,并设置了它的直接预置控制端以使达到实用的要求。
-
At last,We carry out stability asssessment about the vegetation in virtue of the model builded in this plot.We calculate the vegetation's ecological water requirement on May 2004: canopy of Robinia pseudoacacia L require 5.2mm, Top of Melilotus albus Desr require 32.2mm, Bottome of Melilotus albus Desr require 8.6mm, Layer of soil require 17.6mm, totalize 63.6mm,Which more 22.33 mm than the contemporaneous rainfull 41.27mm.
最后通过本次研究构建的模型对项目区植被进行了稳定性评价,计算出2004年5月份复合植被的生态需水量,分别为刺槐冠层5.2mm,草木樨上层32.2mm,草木樨下层8.6mm,土壤蒸发17.6mm,总计63.6mm,这个结果比当月的多年平均(1980-2002年)降雨量41.27mm多出了22.33mm.6月初白花草木樨收割以后,次生茬生长缓慢,我们假设草木樨没有被收割,分别计算了6月和7月的生态需水量,6月份生态需水为85.64mm,7月份为78.41mm,发现6月份水分亏缺依然严重,7月份降雨完全可以满足复合植被的蒸散需求。
-
Perpendicular bougie card can handle a client to accumulate the array, requirement that tests a variety of IC to go up at the same time in test surface at present.
垂直探针卡可措置客户今朝在探测面积数组、同时测试多种IC上的需求。
-
What integrated circuit designs job is flourishing bring many design verification to test requirement, check the one link in catenary of industry of since integrated circuit, also be the crucial point that test and verify of integrated circuit product leaves factory, bougie gets stuck even if upright between automatic test system and IC chip, the accurate interface that parameter of IC product function checks before be being used at enclosing gets stuck, the design of it and integrated circuit and test are enclosed inseparable.
集成电路设计业的畅旺带来大量的设计验证测试需求,测试既是集成电路工业链中的一环,也是集成电路产物验证出厂的要害,探针卡就是介于主动测试系统与IC芯片之间,用于封装前测试IC产物性能参数的慎密界面卡,它与集成电路的设计和测试封装密不成分。
-
Bougie card is in the rapid development of position of developing of IC design, production industry as IC design, manufacturing industry, the new-style chip such as high speed, high density, SOC, ASIC appears ceaselessly, the requirement that price of high speed, high to checking equipment to put forward density, versatility, tall sex compares.
跟着IC设计、制造业的迅速成长,高速、高密度、SOC、ASIC等新型芯片不竭呈现,对测试行动措施提出了高速、高密度、通用性、高性价比的要求。
-
Under the condition of no singular position and satisfying requirement of hybrid drive, it analyzes the boundary curve construction and feature of the three types of hybrid input five bar mechanism .
分析了满足混合输入及不出现奇异位置的 3种混合输入五杆机构类型,其工作空间边界曲线的构成及其特征。
-
And then adjust the position of apex adjacent to boundary point so as to satisfy the requirement of boundary normal.
DNA序列与正四面体中的映象点具有对应关系。
-
Lots of empirical studies show that the actual processesand results of investors'decision-making are very different from that described byMFT's optimal investment decision-making model because of judgement anddecision biases arising from investors'psychological biases and informationasymmetry , investors'bounded rationality below the MFT's requirement.
大量的实证研究表明,实际中由于投资者固有的一些心理偏差和信息不对称的存在,使得投资者的认知能力和判断能力以及判断的准确度往往存在偏差,远远低于经典现代金融理论对投资者的理性要求,投资者的实际决策过程和决策结果与经典现代金融理论的最优投资决策模型所描述的大相径庭。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力