英语人>网络例句>reinforced concrete 相关的网络例句
reinforced concrete相关的网络例句

查询词典 reinforced concrete

与 reinforced concrete 相关的网络例句 [注:此内容来源于网络,仅供参考]

The progress of building structure which is becoming higher and bigger made people to re-standardise the requirement of structure material,the carbon fiber reinforced concrete pathed the way for improving the toughness of it ,while the lightweight concrete solved the problem to the heavy dead weight.

建筑结构向高层、大跨型的发展使人们对建筑材料提出了更高的要求,碳纤维混凝土为改善韧性开辟了道路,而轻骨料混凝土则解决了其自重大的问题。

The field test is made about the tunnel invert that combined with precast reinforced concrete slab and dry concrete.

结果表明,由本文设计的隧道仰拱组合结构,能够增强隧道的施工安全和加快施工进度。

Tangshan City, the old single-storey houses for the old-fashioned, turned into rubble after the earthquake; the new urban area are multi-storey brick-concrete structure buildings, wiped out almost collapsed; reinforced concrete frame structure is also not spared the high-rise buildings, railway track occurred in snake shape distortions or subsidence as a result of the roadbedcheng bo lang style ups and downs, have a large surface cracks, the general collapse of a bridge destroyed, seismotectonic cracks extended up to 8 kilometers, with cracks near the ground motion is very alarming, two of its more than 200 meters within the scope of even the people air have been thrown.

唐山市老区多为老式单层民房,震后变成一片瓦砾;新市区大多是砖混结构多层建筑,几乎倒塌殆尽;钢筋混凝土框架结构的高层建筑物亦未能幸免,铁路轨道发生蛇形扭曲或由于路基下沉而呈波浪式起伏,地表产生宽大裂缝,桥梁普遍塌毁,地震构造裂缝延伸达 8公里,裂缝带附近的地面运动非常惊人,其两则200多米的范围内连人都被抛向空中。

A new dynamic damage and failure model for modeling penetration into concrete or reinforced concrete materials is presented based on TCK damage model.

在TCK模型的基础上开发了一个用于混凝土或钢筋混凝土碰撞或侵彻的损伤模型。

The pseudo-static test which subjects to horizontal load on the A-type autoclaved aerated concrete block wall was adopted. Reinforced concrete beams were set up at the upper and lower ends of the test block, and the four-bar linkage device was provided to ensure that the top of the wall was only in translatory motion, not in rotation at the level force. Hydraulic synchronous loading device was adopted to simulate the vertical load which was produced by the wall of the housing interlayer.

对A类蒸压加气混凝土砌块墙体采用水平荷载作用下的伪静力试验,试件的上下两端设置了钢筋混凝土梁,通过四连杆装置保证墙体顶部在水平力作用下只有平动而无转动,并采用同步液压加载装置模拟房屋层间墙体作用的竖向荷载。

The subject of investigation in the paper could make up the deficiency of the reseach on joints for high strength concrete-filled steel tubar column- Variable width reinforced concrete beam and supported the reference for researchers and designers in the field.

论文的研究结果可以在一定程度上补充完善了钢管高强混凝土节点的研究方面的不足,为相关研究和设计人员提供参考。

While for the time being the research on joints for high strength concrete-filled steel tubar column-Variable width reinforced concrete beam is preliminary. Based on nonlinear elasto-plastic theory and finite element method analyse, mechanical performance for the joints was studied.

而目前对于钢管高强混凝土柱—变宽度钢筋混凝土梁节点的研究工作尚不完善,因此,本文在非线性弹塑性理论分析的基础上,对该节点的力学性能进行研究。

It was discovered that tensile strength regularity varied with carbonated zone and half- carbonated zone and uncarbonated zone of the hydraulic carbonated concrete.3 Rusty fundamental of rebar is explained; Rusty rebar of the long-age hydraulic reinforced concrete that corrosion ratio is less than 6 percent is been mechanical test.

采用圆柱体横劈法测定了长龄期水工碳化混凝土的三个分区强度,揭示了此类水工混凝土碳化区、反应区和未碳化区的强度变化规律。

Compared with prestressed concrete with bonded tendons, it abridges preformed hole, drifting steel, grouting craft etc, the method of laying steels is more agile; Compared with reinforced concrete, it strengthens the applicability of the building function, economizes a great deal of steel material and improves the structure to be subjected to the dint function clearly Therefore, be close to more than ten in the last yearses to construct the application in the structure to get the fast fierce development in our country.

与有粘结预应力混凝土相比,省略了预留孔道、穿筋、灌浆等工艺,布筋方式更加灵活;与普通钢筋混凝土相比,增强了建筑功能的适用性、节约大量钢材、明显地改善结构受力性能。因此,近十几年来在我国建筑结构中的应用得到迅猛发展。

In the construction of the super Large-sized reinforced concrete ground of a project, it is required that the concrete be place in one time, with surface being toweled to form pressed finish with the newly placed mortar simultaneously.

某工程大面积超厚钢筋混凝土地坪要求一次浇筑,面层随浇随抹,原浆压光,一次成型,地面浇筑的速度控制、地坪标高及表面平整度控制成为施工难点,因此采取了一系列技术措施,满足了表面光洁、无裂纹、无起砂等质量要求,平整度偏差均小于3mm。

第9/50页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。