查询词典 regardless of the cost
- 与 regardless of the cost 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Acceptance Criteria Activity Duration Estimation; Activity Definition; Activity Sequencing; Addenda Approved budget Arbitration Award of Contract ; Award Criteria Audits Balanced Matrix; Baseline Bill of Quantities Brainstorming Characteristic Checklists civil engineering civil building Claims Clarify Closing Communication Management Communications Planning Communications Skills Communication channels or paths Completion Computer-based Concrete structure Conditions of Contract Conflict Management Contract Management Contract administration Change Control Contract Closure Contract file Contract agreement; Contractual obligations Contractor Contractor's Representative Construction Management Planning Contract Price Control Chart Cost Estimating; Cost of Quality Cost Control Cost Budgeting Cost Management Co-operation Failure costs Critical Path Feedback Fixed-price Fossils Force Majeure Daywork Functional Organization Decision; Fundamental Tenets Decision Tree Defects Liability Definitions Delphi technique General Rules Deliverables General Provisions Deviation; Generation Direct Costs Discounted cash flow; Dissemination Highway engineering; Discharge Human Resource Management; Disputes Human Resource Planning Drawings Hydraulic engineering; Hydroelectric engineering; Employer's Taking Over Identity Certificate Evaluation of Tenders Initiating Process Group; Executing Process Group Instructions to Tenderers Industrial building Investment payback analysis; Ineffective Individual and team performance Information Distribution Negotiation Indirect Costs Nominated Subcontractors Incentive bonus Information Technology Interpretation; Insurance Observation Inspections Off-site Online On-the-job training Opening of Tender
验收标准活动时间的估计;活动的定义;活动序列分析;增编核定预算仲裁授予合同;授标标准审计平衡矩阵;基线工程量清单集思广益特性清单土木工程民用建筑索赔澄清闭幕通信管理通信规划沟通技巧沟通渠道或路径完成以计算机为基础的混凝土结构合同条件冲突管理合同管理合同管理变更控制合同结束合同文件合同协议;合同义务承包承包商的代表规划建设管理合同价格控制图成本估算;质量成本成本控制成本预算成本管理合作失败成本关键路径反馈固定价格化石不可抗力计日工职能组织决定;基本原理决策树缺陷责任定义德尔福技术的一般规则交付的一般规定偏差;代直接费用贴现现金流量;传播公路工程;放电的人力资源管理;争端的人力资源规划图纸水利工程;水电工程;雇主接管身份证书评标启动过程组;执行过程组指示的投标工业建设投资回报分析;无效个人和团队的业绩信息分配谈判指定分包商的间接费用激励奖金信息技术解释;保险观察视察场外在线在职培训开幕投标
-
Research route is: application of cost engineering theory in information field—definition of cost engineering—design of cost information engineering—operation and control of cost information engineering-evaluation of cost information engineering.
研究思路是:成本工程理论在信息管理领域中的应用——成本信息工程的定位——成本信息工程的设计——成本信息工程的实施与控制——成本信息工程的评价。
-
Methods: A retrospective study was conducted using an insurance database from Bureau of Nation Health Insurance - Central regional branch with registered children born in 2001 who received teeth fluoridation and anti-decay program. The difference of utilization of dental care preventive service analysis was based on each individual child's character and required dental treatment. For cost-benefit analysis, children were selected who were eligible receiving or non- receiving this benefit from July 1, 2004 till 2007. Two groups were compared by frequency matching analysis, based on sex, medical provide territories, insured fee. Additional Incremental benefit/cost method of cost-benefit analysis is also conducted to evaluate the service providing cost increasing and dental treatment cost decreasing effectiveness.
研究方法主要系透过健保局中区分局93年至96年儿童牙科医疗费用统计资料,比较90年次出生之儿童接受涂氟预防保健服务之人口学特质及其涂氟前后牙科医疗利用差异;并依该等对象接受涂氟预防保健服务与否区分两组,就其性别、就医地区别与全民健保投保金额组别等予以配对,进一步应用成本效益分析(cost-benefit analysis,CBA)之增量益本比(Incremental benefit/cost method,IBC),探讨儿童牙齿涂氟预防保健服务成本的增加,使牙科医疗费用减少所带来效益的增加为何。
-
The constrained low-cost restricts the improvement of government performance, other cost and implicit cost increases idle cost, the development of government transformation and civil society organization is slow, and constitutional problems still exist. These factors are the primary reasons which lead to low performance of the government administrative cost control in underdeveloped areas.
低成本制约了政府绩效的提升,制度外成本和隐性成本增加了无效成本,政府转型和公民社会组织发展缓慢,制度性问题等依然存在等,是导致落后地区地方政府行政成本支出绩效低下的主要成因。
-
It was mainly composed of personnel cost,power cost,maintenance cost,medicament cost and other cost.
对城镇污水处理厂运行成本的概念和组成进行分析和探讨,运行成本主要由人员费、动力费、维修费、药剂费和其他费用组成。
-
This article will mainly be from the following part of: the first part: About the cost of the concept of change; Part II: Trade Unions about salaries of individual projects deal with change; Part III: Workshop about the deal with repairs Change in fixed assets; fourth Part I: Recognition and Measurement regarding intangible assets on the cost, the cost of the impact of change; Part V: Borrowing Costs about recognition and measurement of cost, the cost impact of change; Part VI: On the recognition and measurement of enterprise income tax on the income tax costs of the Change .
本文将主要从以下几部分进行阐述:第一部分:关于费用概念的变化;第二部分:关于职工薪酬个别项目的处理变化;第三部分:关于生产车间固定资产修理费的处理变化;第四部分:关于无形资产确认与计量对成本、费用的影响变化;第五部分:关于借款费用确认与计量对成本、费用的影响变化;第六部分:关于企业所得税确认与计量对所得税费用的影响变化。
-
There is a positive relationship between the degree of knowledge tacitness and transfer cost; there is a negative relationship between the degree of knowledge overlap and transfer cost; there is a positive relationship between the degree of physics distance and transfer cost, but the relationship is not that significant; there is a positive relationship between the hierachical distance and transfer cost; there is a negative relationship between the trust and transfer cost.
结论如下:首先,从知识情境来说,知识隐含性与知识转移成本成正相关关系;其次,在相关情境重,部门差距与知识转移成本的正相关关系这一假设未能通过验证,知识重叠性与知识转移成本成负相关关系;知识转移双方物理距离与知识转移成本成正相关关系,但显著性处于临界状态,不能完全支持假设;职位距离与知识转移成本成正相关关系;在接收者情境中,基于能力的信任和基于善心的信任与知识转移成本成负相关关系。
-
This thesis dedicated to research the investment control of BT project, researched the risk in the program construction, the compose portion and the factors effecting the investment. The research includes the conception and the character of the BT project; the actualize process and the questions should be pay attention to; the conditions of BT contract and the sector of the compose poison of the contract price. In this part researched the conception of the BT purchase price and concluded that the relation between the purchase price and the investment. Then studied the risk factors that effect the investment according to the character of the project and then brought forward several advices of the contract item about how to share the risk. Studied compose sector and it's calculatingly methods of the construction cost which is the main part of the investment, then studied how to control the cost during the construct process and analyzed project variations as well as how control that. In the end, researched the capital cost of BT program, the main content include the concept of the capital cost, the calculatingly methods using the engineering economic method, the method writer suggest in the thesis according to the project practice, how to control the capital cost, mainly through setting up an account and inspecting it, and regulating the program financing rate in reason.
本论文的研究重点即BT项目的投资控制,围绕该问题,本论文的主要研究内容有,从BT模式和BT项目的基本分析开始,研究了BT模式的基本概念、BT项目的运作过程、基本特征;研究了BT项目的合同条件和合同价款,该部分分析了BT项目的合同结构、BT项目的承发包工作范围、BT项目的回购价款组成和确定;根据项目建设特征分析了影响BT项目投资的风险因素,并且提出了在对风险进行分配和分担类合同条款制定时建议;建设工程费用是构成BT投资的主体费用,本文对其各组成部分的基本构成、计算方式进行了分析,研究了实施过程中管理控制和工程变更及变更控制的问题;文章的最后对构成BT项目投资的资金成本进行了探讨,分析了资金成本的概念和形成,运用工程经济学的基本理论分析了资金成本各部分的基本计算方式,依据现有的工程实践情况提出了本文建议的计算方式,最后分析了如何对资金成本进行控制――主要通过设立资金账户对其进行监管以及对项目融资的利率进行合理规定。
-
We analyzed the regular pattern of daily medicine cost change of operation inpatients during hospitalization in every group . the results indicated that the median line of daily medicine cost had similar regular pattern in operations on the nervous system , the musculoskeletal system , the nose , mouth , and pharynx system and the female genital organs system : the top of daily medicine cost median emerged on the day of operations ; the median of daily medicine cost was low in the period after operation , and the lowest in the period before operation . the median line of daily medicine cost of operations on the digestive system and the integumentary system keeped at a high level in the period of 1 - 6 days after operations
手术病人日药费随住院时间的变化规律按icd - 9 - cm类目表的15个系统大类将住院手术病人分为15组,分析了各系统手术病人住院期间日药品费用的变化规律,结果显示:神经系统、肌肉骨骼系统、鼻口咽系统和女性生殖系统手术的日药费中位数线图具有相似的变化规律:手术病人住院期间的日药费硕士学位论文中位数的峰值位于手术当日,且手术当日的日药费变异最大;术后住院日的日药费中位数明显降低;术前住院日的日药费中位数很低;消化系统和体被系统手术在手术当日及术后1 6天内的日药费中位数维持在较高的水平。
-
We claim all sidedness and entirety and procedure of cost control, and the text put forward that cost prediction and cost planning and cost control in the cost process control should take turns as well as a rolling closed loop movement.
要求成本控制的全面性、整体性和过程性,提出了成本预测、成本计划和成本实施控制在成本过程控制中既是依次进行时,又是周而复始的闭环运动。
- 相关中文对照歌词
- L'unité
- Katie's Tea
- La Colline Des Roses
- The City Is Here For You To Use
- La Dance Ghetto
- Good As Gold (Stupid As Mud)
- Carry On Regardless
- Cost Of Love
- Hardest
- Sorry
- 推荐网络例句
-
Listen,point and check your answers.
听,指出并且检查你的答案。
-
Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.
但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48
-
Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.
一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。