查询词典 raise the roof
- 与 raise the roof 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Common form of the roof surface: arch roof , shell-shaped roof of shoes, V-shaped hull roof , flat roof shell, wheel-shaped cable roof , saddle -shaped roof .
曲面屋顶常见形式有:拱屋顶、球鞋形网壳屋顶、V 形壳屋顶、扁壳屋顶、车轮形悬索屋顶、鞍形屋顶。
-
The cast-in-place reinforced concrete spatial core beamless roof is one kind of new beamless roof system, it is self-possessed lightly, the span is big, after is continues the belt capital of column the beamless roof, the plate beamless roof, the dense rib beamless roof, complies with the time to the beamless roof system request new beamless roof system, at present already entered the use in some engineering project upthrow, has obtained the good economic efficiency and the social efficiency.
现浇钢筋混凝土空心板无梁楼盖是一种新型的无梁楼盖体系,它自重轻,跨度大,是继带柱帽的无梁楼盖、平板无梁楼盖、密肋无梁楼盖之后,顺应了时代对无梁楼盖体系要求的新型无梁楼盖体系,目前已经在一些工程项目上投入使用,取得了良好的经济效益和社会效益。
-
Aiming at bottom roof caving and support impact problems induced with abrupt large scale caving upper roof in face 21303 of Daliuta mine, this paper put forward the motion parameter at roof caving and calculation formula of roof shear breaking force with the help of theorem of momentum, theorem of moment of momentum and D' Alembert principle. Roof caving process was simulated by Ansys Ls-DYNA program, and maxim impact force was got. The theoretical research outcomes in the paper were applied in face 21303 of Daliuta mine, and were accordant with actual observing status of roof caving process.
针对神东煤炭公司大柳塔煤矿活井21303综采工作面,上层采空区顶板突然大规模垮落对下层顶板及支架的突然冲击问题,文章采用动量定理、动量矩定理、达朗伯原理推出了顶板垮落瞬间的运动量及顶板切顶垮落所需要的剪力值计算公式,用ANSYS LS-DYNA程序对顶板垮落过程进行了数值计算,得到了最大冲击力,在大柳塔煤矿活井21303综采工作面对顶板垮落特征进行了实际观测和理论成果验证。
-
The trial results show that with the disposal of induced caving roof by presplitting blasting and induced caving roof blasting, about 17.8 m in thickness of rock cushion is successfully formed in the inferior abandoned stope, which can bring down the harm of dashing blast of an explosion caused by roof collapse; apparent run-through flaws arise between presplitting blasting holes, and controllable caving is formed in the roof, abrupt collapse of large area roof is prevented, the productional safe surroundings of underground mining is improved; eventually, the resources' reclamation rate is improved from about 70% to 84.6%, and the dilution rate is abated from 25%40% to below 15%, so efficiently withdrawing is actualized.
试验结果表明:采用预裂爆破与诱导崩顶爆破的方法,通过对顶板的诱导崩落处理,成功地在下方采空区形成了厚度为17.8 m左右的岩石缓冲垫层,有效地降低顶板冒落带来的冲击气浪危害;在预裂孔间产生明显的贯通裂隙,从而在顶板上形成诱导可控崩落,防止顶板大面积的突然垮落,改善地下开采安全生产环境;最终资源的回收率由70%左右提高到84.6%,贫化率由25%~40%降低到15%以下,实现了资源的高效回收。
-
This paper presented the relationships between roof shapes and form coefficient under wind loads, drainage and corresponding loads caused by rain. The paper also discussed the relationship between roof shape and roof structural height and span and the relationship between roof shape and connection styles. These relationships will influence both safety and price of roof structure.
阐述了屋面形状与风载体型系数、屋面排水及相应雨水荷载的关系问题,讨论了屋面结构形式与屋面跨度和厚度的关系问题、屋面形状与钢结构节点形式的关系问题,这些问题对大型场馆钢结构屋面的安全性、经济性均有显著影响。
-
It is important to reduce the span of the hard roof to avoid its impact load on supports. However, at longwall top coal caving face, the periodical weight of roof is a main factor that crushes the top coal, which is beneficial to the top coal recovery. How to use the roof pressure safely is of crucial importance in top coal caving. Based on field monitoring, theoretical analysis of strata movement, the numerical model of compound structure of hard roof stepped cantilever and the top coal cantilever beam is built, and the parameters of the model are also determined. The elasto-plastic finite element method is used to analyze the effect of hard coal fracture under the abutment pressure of hard roof, and the cracking coefficient is defined according to the stress state of the element.
通过对岩层移动的现场观测,建立了&两硬&条件综放采场台阶悬臂—悬臂梁组合的煤岩组合结构力学模型,并以此煤岩结构为基础,建立&两硬&条件综放采场顶煤压裂的有限元数值模型,分析了坚硬顶板不同来压步距对坚硬顶煤的压裂效应,并确定了合理的支架阻力,从而对坚硬顶板进行有效的控制,消除坚硬项板对采场的冲击隐患,同时保证采场矿压对坚硬顶煤的有效压裂,达到提高顶煤回收率之目的,由此形成了坚硬顶煤、坚硬顶板条件下综放采场围岩控制的基本理论和方法。
-
But in realistic reason, the absurdity of the personnel system becomes the parent and teachers toward what student bring pressure emollient to borrow;, The family becomes the student to increase the negative important place, it is student the lessons burden aggravate of motive source and direct source, and became student's mental state to increase negative important source;High test conductor's baton BE also result in this phenomenon of important reason, an acceptance score line stopped the teacher's throat, also taking out to beat the student;The slippery 坡 of the occupation morals of teacher make it the mental acceptance ability of the regardless of student and the healthy body of the student, pass to increase student's lessons to make up the shortage on oneself's teaching, this makes some teachers unilateral to emphasize the result but threw to lose the teacher's original intention then;Lack the emollient direct mechanism, foster the teacher and don't go to the character of raise the oneself, don't go to the science skill of raise the teaching, but measures this to breach the method of science in brief to raise the deceitful examination score of student with the enlargement homework, is not science ground passes to raise student's character, raise the teaching result, but use and should try the educational way leading the student copes with the examination with the speculation prosperity method.
而在现实原因中,人事制度的不合理成为家长和教师向学生施加压力的有力借口;,家庭成为了学生增负的重要场所,更是学生课业负担加重的动力来源和直接来源,并且成为了学生心理增负的重要来源;高考指挥棒更是造成这一现象的重要原因,一条录取分数线勒住了教师的喉咙,也抽打着学生;教师职业道德的滑坡使其不顾学生的心理承受能力和学生的身体健康,通过增加学生课业来弥补自己教学上的不足,这便使有些教师片面强调成绩而丢失了教师的初衷;缺乏有力的监督机制,助长了教师不去提高自己的素质,不去提高教学的科学本领,而是用加大作业量这一简单的违反科学的方法来提高学生虚假的考试分数,不是科学地通过提高学生素质,提高教学效果,而是用应试教育的方式指导学生用投机繁荣方法应付考试。
-
Reform the goal with development to orient according to the social security system,social security fund is it should is it give consideration to social goal,economic goal,political goal to insist on to raise for,give consideration to the long—term goal and short—term goal, realiz.e combining fairly with efficiency;The social security fund must divide the responsibility border among government,unit,individual to raise rationally,define that govemment and function of the market divide the work;Social security fund is it must pay attention to macroscopical system way choose,is it pay attention to micro technical design and application of field to want too atthe same time to raise for;Social security fund is it should take different raising the way for,raising the way for to different social security project to raise for;Social security fund is it should distinguish regular financial need raising waying,principling of raising the way for etc.different from provisional financial need to raise for.
根据社会保障制度改革与发展的目标定位,社会保障基金筹集应当坚持兼顾社会目标、经济目标和政治目标,兼顾长期目标与短期目标,实现公平与效率相结合;社会保障基金筹集必须合理划分政府和单位、个人之间的责任边界,明确政府与市场的合理职能分工;社会保障基金筹集必须重视宏观制度方式选择,同时也要重视微观领域的技术设计与应用;社会保障基金筹集应针对不同的社会保障项目采取不同筹集方式、筹集途径;社会保障基金筹集应区分经常性资金需要和临时性资金需要采取不同的筹集方式、筹集途径等原则。
-
According to the material and disposition,the roof of common steel roof truss mill building divides into steel purlin roof and roof without purlin.
普通钢屋架结构厂房的屋盖根据屋面材料和屋面布置情况,可分为无檩屋盖和有檩屋盖。
-
On the anslysis of factory with steel purlin roof and factory with roof without purlin,the practicability of steel purlin roof with strengthened longitudinal horizontal brace replaces roof without purlin is evaluated.
在对有檩屋盖和无檩屋盖厂房结构分析对比的基础上,评价用纵向水平支撑加强后的有檩屋盖代替无檩屋盖的可行性。
- 相关中文对照歌词
- L'unité
- Blow The Roof
- Katie's Tea
- Raise A Little Hell
- La Colline Des Roses
- Fire Water Burn
- Heaven's Wall
- Colour Of Moonlight (Antiochus)
- Raise The Roof
- La Dance Ghetto
- 推荐网络例句
-
What you get with the DM 10 is a lot of fun, emotion and musicality that most other amplifiers can only dream about.
你与10马克得到的是一种乐趣,情感和音乐是很多其它放大器只能梦想。
-
I've had the Gatch team of my Gatch-verse jumping up and down in my head screaming, LET US OUT!
我已经有我的 Gatch 的 Gatch 小组-在我的头尖叫中上下地跳跃的诗,&放出美国&!
-
In the end, wisdom and forethought will win.
有了智慧和深谋远虑,最终才会赢得胜利。