英语人>网络例句>project 相关的网络例句
project相关的网络例句

查询词典 project

与 project 相关的网络例句 [注:此内容来源于网络,仅供参考]

Easy article net the 2nd period digital publication project serves as grasper with feature of digital technology development and trend, it is project feature with relatively complete knowledge system, with knowledge link and data mining are the core of research and development of the project, offer more the number of suit individuation demand publishs a service.

易文网第二期数字出版工程以数字技术发展特征和趋势作为抓手,以相对完备的知识体系为项目特征,以知识链接和数据挖掘为项目的研发核心,提供更切合个性化需求的数字出版服务。

Shangri-La group acceptance Diqing Airport Extension Project drew 24 of the projects and on-site inspection and check the information that: the project has been approved by the completion of design documents, with the design and use requirements, project management standards, quality .

验收组对迪庆香格里拉机场扩建工程提请的24个工程项目,进行了现场及有关资料的检查验收,认为:该工程已按批准的设计文件完成,符合设计及使用要求,工程管理规范,质量合格。

By establishing traffic project economic-effect-enhancement model, predicted the economic effect brought by traffic project after established quantificationally, including the economic enhancement effect of Hailer to Manzhouli and Chen Banner before and after the project established.

通过建立公路交通项目经济诱增效应模型,定量地预测交通项目建成后可能带来的经济效应,包括公路项目建成前后海拉尔对满洲里、陈巴尔虎旗两地的经济诱增效果。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

At the begin phase of PM, especial bid time, competition is strong, so competitive intelligence activity is main activity in this phase ; general information management is main information activity in project impletion phase; project information pigeonhole is main information activity in project finish phase, IT application is important in this phase.

在项目开始阶段,特别是投标时,竞争性较强,需要竞争情报的支持,这个阶段主是竞争情报的活动;而项目实施阶段的信息活动是一般的信息管理活动过程;结束阶段,是项目信息的归档管理,在这阶段强调信息技术在其中的应用。

We prove it available.2 As government project owner, there exist shortcomings including separate management and inexplicit project owner, so we try to bring forward some innovations about government project owner.

具体内容如下:先对业主与承包商构成的二元制下的激励问题进行分析,后引入项目管理公司,并赋予其作为第三方对承包商的行为实行监督,并对所形成的三元制下的激励问题进行分析。

When instate receives a new project, work flow will be outspreaded like this: first of all, carry on the possibility research; then sign oral or formal contract with clients and also create project; make all level plan based on project and correlative subprojects, and arrange staffs of each department to join the design; and then the process of blueprint design according to the task points in plan; finally is the pigeonholing of blueprint.

当设计院接收一个新的项目后,将按照以下的工作流程展开:首先进行可行性研究;然后和客户方面签订口头订单或正式合同并立项;根据项目及其相关子项制定各级计划(院级计划及其相应的部级二次计划),安排各个专业的人员参与设计;随后是按照计划中的任务节点展开的图纸设计过程;最后是设计图纸的归档。

I type heat interchanger companies, the main type of products sales in the Northeast heat units, north and northwest and eastern China, I Sondex type production companies in the industrial heat interchanger typical project are : West chemical synthetic ammonia project, Daqing methanol plant methanol craft projects, the Mid-Levels Hangzhou cycle power plant cooling water projects, Urumqi Petrochemical Corporation Sanjuqingan project, Inner Mongolia Beijing Lung generating limited liability company closed cycle cooling water projects, Linhe plant except quarrel water coolers projects.

随着公司的迅速发展,目前已经聚集并形成一支高素质成熟的专业技术研发、设计队伍;同时拥有一支由国内知名专家组成的专家组;形成了一支熟练的生产操作和产品制造工人队伍和可以提供各种良好售后服务和技术支持的强大销售队伍。公司现已建立起贯穿全国纵横交错的销售网络。公司在东北的沈阳、哈尔滨,华北的北京、天津,华东的上海、南京、杭州、合肥,西北的乌鲁木齐、西安,西南的重庆,华南的广州等城市均设有销售分公司、销售服务办事处。销售代理商已遍布国内20余座大中城市。

In chapter two and three, combined with example, this paper discusses theapplication of value engineering in construction engineering project managementsuch as design, invitation for bid, optimization of construction organization anddesign, selection of material and equipment, and demonstrates that valueengineering can bring huge economic and social benefit in constructionengineering project management and recommends some adoptable valueengineering methods in each stage of construction engineering project for thepurpose of extending it maneuverability in construction engineering projectmanagement.

第二、三章结合实例介绍了价值工程在建设工程项目管理我国建设工程项目管理中设计、招标、施工组织设计优化、优选材料和设备等阶段的应用,论证了价值工程在建设工程项目管理中能够产生巨大经济效益和社会效益,并推介了一些在建设工程项目各阶段可以采用的价值工程方法,旨在推广建设项目管理中应用价值工程的可操作性。

Changes of erosion and accumulation of the seabed before and after the project The general characteristics of the pattern of erosion and accumulation of the seabed near the scheduled project both before and after the scheduled project are as the following: accumulation occurs at the areas lower than–10 isobath; some suspended sediment is deposited near the coast due to the relatively small tidal current with a monthly accumulation rate of 2-6 mm; while a slight erosion occurs in the areas deeper than–10 isobath with a monthly accumulation rate of .2 mm.

5工程前后海底冲淤变化工程前后海底冲淤相同的地方是:大致沿-10m等深线向近岸呈淤积状态,近岸由于潮流流速小,一些悬沙落淤,月淤积量在近岸附近约2-6mm;而-10m等深线以深基本上呈轻微冲刷状态,月冲刷量一般在0.2mm以下。

第19/100页 首页 < ... 15 16 17 18 19 20 21 22 23 ... > 尾页
相关中文对照歌词
The Blair Snitch Project
The Project For A New American Century
The Project For A New American Century (Live)
New Project
Ode To My Project Chicks
Project Bitch
Project Bitch (Remix)
Project Chick
X Project (Intro)
X Project
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力