查询词典 project schedule
- 与 project schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This paper discusses some problems that have more differences in the standard execution and presents the point that we should properly adjust the project scale and structure grade of the project under construction according to the new standard in order to upgrade the design; analyzes the project classification of the project extension and project to be constructed in phases, and classific...
为此,对该标准执行中存在较多分歧的一些问题进行了探讨,提出根据新标准适时调整在建工程的工程等别和建筑物级别以利于优化设计,对扩机工程和分期建设工程的工程等级划分、大型水电站的挡水和泄水建筑物级别的确定、抽水蓄能电站大坝的洪水设计标准等进行了分析。
-
Third, the industry water treatment project, the softened water treatment project, leaves the water project, the hyperpure water conservancy project regulation, the high pure water project, the sea water to discuss the engineering facilities, the electronics industry water used, the food industry water used, the hospital drugs manufacture process water, the galvanization process water and so on.
三、工业水处理工程、软化水处理工程、去离水工程、超纯水工程、高纯水工程、海水谈化工程设备、电子工业用水、食品工业用水、医院制药工业用水、电镀工业用水等。
-
Except the foreword, the article is divided into three chapters:The first chapter is to make a systematical analysis on the institution of reorganization project, which can be further partitioned into three sections: the first section states the institution of reorganization, probes into the proposal of Project and principles of its institution, and claims that in order to attain a practical and enforceable project, the reorganization project should be set down mainly by reorganizer under the assistance of debtor; the second section explains the principles that should be complied with during the institution process, and deems honesty and rationality, thoroughness as the three most important principles; the third section set forth the content of reorganization project.
这一章共分三节:在公司重整计划的制定上,主张以重整人为主、有债务人予以协助来制定公司重整计划最为科学,这样制定的公司重整计划最切合实际,最易于执行。指出公司重整计划制定时应遵循公正合理、兼顾、效率三个原则。第三节讲述了公司重整计划的内容。公司重整计划草案应该包括以下四点核心内容:债权的分类方案;债权债务重整方案;重整企业的经营方案;重整计划的执行期限。
-
Informatization project management is to adopt the basic methods of project management with the consideration of the characteristics specifical to the informatization project to carry out all-round planning, follow-up, and control in order to ensure the project per se and the outcome of project operation to meet their objectives.
信息化项目管理是针对信息化项目,采用项目管理的基本方法并结合信息化特点开发的管理方法,对信息化工程项目进行全面的计划、跟踪、控制,保证项目本身和项目的结果达到预期目标。
-
In this article is described the overview of Ling Ao Nuclear Power Plant Advanced Fuel Management project (1/4 core reload) Project, the first high burnup advanced fuel management project in China. The contents include the scope of the project, analysis and justification made for the project, licensing arrangement and site realization.
本文阐述了国内首个高燃耗先进燃料管理项目-岭澳先进燃料管理(AFM,Advanced Fuel Management project)1/4换料项目的总体情况,包括项目的内容和范围,项目分析和论证情况,项目的执照申请及安排,以及项目的实施情况。
-
The objectives of the workshop were to: expose participants to new trends on Interactive Radio Instruction; acquaint them with new skills and knowledge on IRI methodology, scripting and project cycle management; inculcate basic skills to enable participants facilitate, monitor and evaluate the project.; create a forum for interaction amongst the implementers of the project and front line workers to evolve best approaches to be adopted to move the IRI project forward, and to enhance the knowledge, skills and competencies of participants to strengthen their capacity to mobilise and sensitise pastoralists to support the IRI project initiative in schools.
此次研讨会有几个目标:介绍有关互动式广播教学的新趋势;透过训练,让参与者熟悉该教学方法,教案的写作及评估管理;灌输有助于有效执行与评估教案的基本技能;在所有的参与者之间,包括执行该训练计画的人以及第一线的工作人员,创造一个能够互动对话的空间,以引导出让互动式广播教学得以顺利进行的最佳方式;以及,增加所有参与者的知识,技能与竞争力以强化他们动员牧民的能力,让互动式教学能在学校顺利展开。
-
These "problem properties" from the causes can be divided into seven categories: The first is caused by disordered development; second is not strictly project approval, business-to-project development funds are not implemented; third is absconding money led to real estate developers failed to materialize; four the project to rely on bank loans, the state tightened money supply, no follow-up support for the construction funds for construction; five real estate policy is due to gradually improve over the past administrative allocation of land are required to pay a large number of land transfer and value-added tax to pay the gap too big , developers can not afford to pay; Sixth, the lack of project feasibility study, sales difficult construction projects shall not be able to implement; Seven developers for other economic cases sealed by the court project.
这些&问题性质&的原因可分为七类:第一是所造成的无序发展;二是不严格项目审批,企业对项目的开发资金不落实;三是潜逃钱导致房地产开发商未能实现;四个项目依赖于银行贷款,国家收紧货币供应量,没有后续支持建设建设资金;五年房地产政策是逐步改善,在过去的行政分配土地都必须支付了大量的土地转让和增值税支付的差距太大,开发商无力支付;第六,缺乏项目可行性研究,销售困难的建设项目将无法实施;七开发其他经济案件由法院密封项目。
-
The commercial part of the bid file , according to " norm that the inventory of project amount of construction project valuates " which national Ministry of Construction issues newly, applied mechanically in 2003 " unified the basic figure form in Hubei ",Detailed to is it divide some project amount inventory valuate form , measure project inventory valuate form , other project inventory valuate form and comprehensive unit price analytical table ,etc.
投标文件的商务部分依据国家建设部最新颁布的《建设工程工程量清单计价规范》,套用2003年《湖北省统一基价表》,详细完整地编制了分部分项工程量清单计价表,措施项目清单计价表,其他项目清单计价表和综合单价分析表等。
-
" Chinese highway journal " Chinese highway learns to sponsor, the definitive science journal that Chang'an university and academy of science of highway of the Ministry of Communication undertake jointly (ISSN 1001-7372, CN 61-1313/U), basically publish civil engineer, bridge and tunnel project, traffic project, car and car to use the paper of the domain such as machine of project, content shedding, economy and management, project, administrator of personnel of technology of the researcher that main constituency is highway traffic domain, project, economy reachs academical teachers and students.
梗概: 《中国公路学报》是中国公路学会主办的,长安大学和交通部公路科学探究院共同承办的权威性学术刊物(ISSN 1001-7372,CN 61-1313/U),主要刊载道路工程、桥梁和隧道工程、交通工程、汽车和汽车运用工程、物流、经济和管理、工程机械等领域的学术论文,主要读者为公路交通领域的科研人员、工程技术人员、经济管理人员及大专院校的师生。
-
Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.
通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。
- 相关中文对照歌词
- Project Hallways
- Cancel
- Project Window
- Project Niggas
- Project
- Tell The World My Name
- Life Kills
- Project Window
- Represent It
- Don't Call Me No Mo
- 推荐网络例句
-
The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.
组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。
-
We have battled against the odds in a province that has become increasingly violent.
我们对在一个争夺日益激烈省的可能性。
-
MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.
米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。