查询词典 project schedule
- 与 project schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
One of the most common sources of failure is altering the project schedule in midstream without proper planning.
没有合适的计划而中途改变项目的时间表是最普遍的失败原因之一。
-
"In addition to the technology advancement, we achieved a $10 million cost savings and improved the project schedule by 12 months through the innovative tooling, materials and fabrication processes the team put into action," explained Cleon Lacefield, Lockheed Martin vice president and Orion program manager.
"除了技术进步,我们实现了1000万美元的成本节约目标,同时通过创新的工具,材料和制造工艺使项目进度计划在短短的12个月就付诸实施。"洛克希德马丁公司的副总裁和猎户座计划经理克里昂。雷斯菲尔德说。
-
You are preparing the project schedule network diagram and you know that all the dependencies are finish to start.
你在准备项目的进度网络图,你知道所有的活动依赖关系都是结束开始。
-
Manage erector, control project schedule/quality/budget.
现场安装管理,控制项目的进度,质量和投资预算。
-
Any continuous series of schedule activities connected with Logical Relationship s in a Project Schedule Network Diagram .
在项目进度网络图中,通过逻辑关系连接起来的任何连续的进度活动序列。
-
The collection of schedule activity dependencies that makes up a Project Schedule Network Diagram .
项目进度网络图中各进度活动之间的依赖关系的总称。
-
Firstly, the paper introduces the achievements and development plan of railroading project construction in our country, elaborating the possibility and necessity of methods of whole railroading project schedule dynamic control by using computer-aided management system, and illustrated the study level of the system outside and inside our country.
铁路工程全线施工进度控制系统的研究就是为提高我国目前铁路工程建设管理水平提出来的。首先,本文介绍了我国铁路工程建设的成就和发展规划,提出了采用计算机系统辅助铁路工程全线施工进度动态控制管理的必要性和可行性,分析了国内外该项研究的现状。
-
It acts as the basis for the deliverables and wok products identified in the project plan and project schedule.
它将作为在项目规划和项目进度中所产生的可交付成果和工作成果的基准。
-
The Parties hereby anticipate that criteria for Client's satisfaction will be, inter alia: adherence by Engineer with the Project Schedule both with regard to the ultimate Completion Date as well as the achievement of the milestones, necessity, number and type of corrective activities by Client, if any, during the rendering by Engineer of the implementation and organization of the relationship between Client on the one part, Contractors, Suppliers and authorities in the PRC on the other part with a view of Client's good reputation at present and in future with regard to the operation of the Production Facility, and, especially compliance with and, in view of the aforesaid, undershooting of Client's budget for the Project.
双方在此预期,&客户&满意度的衡量标准包括但不限于:&工程方&对《项目进度计划》的遵守情况,包括是否遵守最后的&完工日期&和是否实现各个里程碑,在&工程方&提供服务期间,&客户&所提出的纠正活动的必要性、数量和类型,就&客户&目前和未来在运行&生产设施&方面的良好声誉而言,以&客户&为一方和&承包商&、&供货商&和中国政府当局为另一方的关系的实现与组织情况,以及,尤其是在符合上述各点的前提下,不超出&客户&的&项目&预算。
-
Methods The contents and requirements of the evaluation occupational hazard of project schedule were identified. According to the principle of the Gantt chart, project progress management plan was made for the project schedule management in evaluation of occupational hazard of a project.
明确建设项目职业病危害评价项目活动的内容和进度要求,根据甘特图的原理,以某建设项目职业病危害控制效果评价的项目进度管理为例,绘制出一张项目进度管理工作计划表。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力