查询词典 project plan
- 与 project plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Share the one part of the plan as in-house knowledge, giant network holds the seminar such as program, art, plan and project management regularly, shi Yuzhu of CEO of network of the giant before this already " fly a class " the net that explained him to sum up swims the plan is entered 3 close, the result such as 8 words guiding principle, 10 big concerns.
作为内部知识分享计划的一部分,巨人网络定期举办程序、美术、策划以及项目管理等研讨会,此前巨人网络CEO史玉柱已经"开班"讲解了他总结的网游策划闯三关、8字方针、10大关系等心得。
-
Second, chemical industry colony: Must display my city deep water good port fully the superiority, closely holds north shore my city shore continent bay to include the entire province shore continent bay to petrify the base plan the opportunity, guides east positively the domestic and foreign large-scale petrochemistry enterprise and the privately operated capital investment Wu petrifies the base construction, the encompassment large-scale petrification main item project, develops the upstream and downstream industry chain project positively, as well as participation necessary public project and infrastructure construction.
二、化工产业集群:要充分发挥我市深水良港的优势,紧紧抓住我市湄洲湾北岸被列入全省湄洲湾石化基地规划的机遇,积极引导国内外大型石化企业和民营资本投资东吴石化基地建设,围绕大型石化龙头项目,积极发展上下游产业链项目,以及参与配套公用工程和基础设施的建设。
-
The Cost Management Plan is contained in, or is a subsidiary plan of, the project management plan.
成本管理计划是项目管理计划的一部分或子计划。
-
The cost management plan is contained in, or is a subsidiary plan, of the project management plan.
成本管理计划包含在项目管理计划之内,也可以是其中的一项分计划。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The idea that every hole is colorful , in fact ,long ago began to plan, and as the process ofthe project support and input ,such a plan will carry out gradually , in addition to flowers , the green of the nine holes will also have a great change, we plan to make the green part of the nine holes converted into PaoTai green for golf enthusiasts, this will greatly increase their desire to challenge.
让每一个洞都有声有色的想法其实在很早以前就开始打算,而随着项目的进程大力支持和投入,这样的计划逐步开展,除了鲜花之外的九个洞的果岭也将有大的改变,我们计划是把这九个洞的果岭部分改造为炮台果岭,对于球友来说,这将大大提高他们的挑战的欲望。
-
Jointly develop ,produce with the key scientific research universities and colleges "baixing" and "Tendly" brand Hi-Tech new-type Origanum oil ( draw from the origanum vulgarel grass) betaine、garlicin、 organic copper、organic chromium、sodium dia-cetate、methionine copper、methionine iron、methionine zinc、methionine manganese etc. Series of products. Obtain the scientific and technological result first prize of Henan , The third-class scientific and technological progresses is rewarded ,advanced enterprise of Xiangcheng city scientific and technological , undertake the two scientific and technological brainstorm project of "the eighth five-Year Plan period provinces in dependently. Awarded to "outstanding private scientific and technological enterprise of Henna province" by the scientific and technological drawing room of henna province in 2001.With bear two of national" the Ninth five-Year Plan jointly by fodder by Chinese Academy of Agricultural Sciences, one shiwu scientific and technological brainstorm project.
与重点科研院校联合研制、生产&百兴&&添德利&牌高科技最新型饲料添加剂:牛至油,甜菜碱、大蒜素、有机铜、有机铬、双乙酸钠、蛋氨酸铜、铁、锌、锰络合物等系列产品,分别获得河南省科技成果一等奖,科技进步三等奖,项城市科技先进企业,独立承担两项省&八五&科技攻关项目,2001年被河南省科技厅授予&河南省优秀民营科技企业&,同中国农科院饲料所联合承担两项国家&九五&,一项&十五&科技攻关项目。
-
Methods The contents and requirements of the evaluation occupational hazard of project schedule were identified. According to the principle of the Gantt chart, project progress management plan was made for the project schedule management in evaluation of occupational hazard of a project.
明确建设项目职业病危害评价项目活动的内容和进度要求,根据甘特图的原理,以某建设项目职业病危害控制效果评价的项目进度管理为例,绘制出一张项目进度管理工作计划表。
-
Inspection is the basic focus : building units for project quality supervision, the construction plan design document review, construction permit procedures; Construction of the main responsibilities of the intelligence and associated personnel qualifications; Construction plan review agencies, the intelligence unit testing and quality engineering; Works mainly in residential housing construction foundation base, the main structure; urban municipal projects roads, bridges structure; ready-mix concrete production enterprises standardized management, metering management, process control and quality inspection; examines engineering investigations, design, construction, supervision and other units and the construction plan review bodies, engineering unit testing on technical information.
检查重点基本是:建设单位办理工程质量监督、施工图设计文件审查、施工许可手续情况;建设工程责任主体的资质及相关人员资格;施工图审查机构、工程检测单位的资质及质量行为;以住宅工程为主,房屋建筑工程的地基基础、主体结构;城市市政工程的道路、桥梁结构;预拌混凝土生产企业的标准化管理、计量管理、工序控制和质量检验;受检工程勘察、设计、施工、监理等单位和施工图审查机构、工程检测单位的有关技术资料等。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力