查询词典 project plan
- 与 project plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This research project combines four automatic drawing systems which developed by our laboratory in a few years, and including a section steel standard part library system. We re-plan the first page, the layer, the code, the slide, and the formula.
本论文整合了本研究室历年来四个绘图系统,包括增加一个型钢零件库系统,过程中需重新规划首页、任务层次、编码、图像幻灯片制作、以及程式驱动撰写。
-
Start your plan at the beginning of the term and readjust it with each new project.
在学期开始时就实施你的计划并随着每一个新的规划调整。
-
In the project design proposes many kinds of plans, from the reliability, the realizability, the overall performance and so on carries on the plan comparison, the selection scheme.
方案设计中提出多种方案,从可靠性、可实现性、综合性能等进行方案比较,选择方案。
-
In practice, the planning only begins with the creation of the master plan. Every contributor might well hold this responsibility to the project as a whole: to replan whatever work they are performing while they are performing it.
在实际中,计划只有在主计划创建之后才开始,每一个参与者都把自己对项目的职责当作整体性的:在执行他们的工作时重编自己的计划。
-
Relying on the statistic tools, team would figure out what the truth behind should be. At last, the results of improvement and control plan presented what the representability and sustainability of the project would be.
最后,在改善方案和控制计划的执行结果下,验证了此研究方案的可代表性和永续性。
-
If the project involves a revolving loan or microcredit, is the Revolving Loan Fund Supplement and Credit Group Plan included
是,循环贷款基金补充说明以及信贷团体计划文件是否附上?
-
If your project involves revolving loans or microcredit, the Revolving Loan Fund Supplement Form and Credit Group Plan must be included with the application.
建议尽早提出申请,以避免太靠近截止日期3 月31 日造成延误,假若您的计画案包含贷款或小额信用贷款,循环贷款基金补充说明以及信贷团体计划 Revolving Loan Fund Supplement
-
Total invest-ment of the 1st and scend plan of this project is USD18,650,000,annual production capacity-40,000 metric tons wire products (including Cold Heading Wire and cold forging Wire).
项目一期总投资1365万美元,年产紧固件用冷镦钢丝和弹簧用弹簧钢丝25,000吨。
-
Combined with the project of'Technology of ground pressure control under high crustal stress and the mining plan research in Yinshan Mine', the stability of schistosity structural stope is studied.
主要研究内容和结论如下:(1)在现场调查的基础上,进行了工程地质岩组划分,查明了保护墩及采场片帮、冒顶的主要原因,得出了片理结构是影响采场稳定性主要因素的结论。
-
British Home Office call this plan " project of database of midway intercept modernization ", tell network and telegraphic operation dealer, technology of network black box will be self-recording in British churchyard communicate every time, every email and every time the website visits content, store record content in central database.
英国内政部称这项计划为"中途拦截现代化数据库项目",并告知网络和电信运营商,网络黑匣子技术会自动记录在英国境内的每次通话、每封电子邮件以及每次网站访问内容,并把记录内容存储在中心数据库。
- 推荐网络例句
-
But we don't care about Battlegrounds.
但我们并不在乎沙场中的显露。
-
Ah! don't mention it, the butcher's shop is a horror.
啊!不用提了。提到肉,真是糟透了。
-
Tristan, I have nowhere to send this letter and no reason to believe you wish to receive it.
Tristan ,我不知道把这信寄到哪里,也不知道你是否想收到它。