查询词典 project plan
- 与 project plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A report given by the Project Manager to the Project Board, that confirms the hand-over of all products and provides an updated Business Case and an assessment of how well the project has done against its Project Initiation document .
项目竣工报告项目经理提交给项目管理委员会的报告,其中包括移交所有交付物的确认,更新后的商业论证和与项目启动文件相对照所得出的关于项目绩效的评估。
-
N transfer Taocha Headwork water diversion project is run by the State Council approved the construction of the national large-scale water conservancy project is a project of N transfer an important part of both the water diversion project Headwork middle main channel Butterfly Valveswater diversion headworks but also Danjiang auxiliary dam reservoir engineering design for the new site redevelopment and build more power stations buildings are mainly cited sewers grvity induced gate stilling basin power plant and management of space and so on.
南水北调中线陶岔渠首枢纽工程是经国务院南水北调办批准建设的国度大型水利工程,是南水北调中线一期工程的重要状干部分,渠首枢纽工程既是南水北调中线输水总干渠的引水渠首,也是丹江水库的副坝,工程设计为新址重建,并增建发电站,建筑物主要有引渠、重力坝、引水闸、消力池、电站厂房和治理用房等。
-
Being essentially one part which appraised after the item, being effect and the influence to appraise the project management, the purpose is the experience lesson summing up the project management to the project management twist hempen thread effect evaluation, and raises the project management standard, and finally promotes the item successfully to accomplish.
现有高速公路建设项目管理中的评价主要集中在经济和技术方面,而对管理绩效评价的研究主要包括监理的效果评价和施工过程中的一些单指标的评价,没有形成统一的评价体系;现有的工程项目管理绩效评价方法,诸如招投标的选择之类的零散评价方法,大多停留在项目施工的某一层面,评价方法适应性差,缺少综合评价。
-
During the process of project decision and implementation, the project manager must proceed from the reality, based on the specific conditions of project, to and indigenously deal with and solve the actual problems of the project.
项目管理者在项目决策和实施过程中,必须从实际出发,结合项目的具体情况,因地制宜地处理和解决工程项目实际问题。
-
According to analyses of the existing problems in the evaluation of agent of government investment project ,combining with the characters of the substituted construction system of the government invested project and the project management,a performance evaluation index system of the agent of government invested project was constructed,fdlowing the basic principles of the index settlement.
通过对当前政府投资项目代建单位绩效考评存在问题的分析,结合政府投资项目代建制特点及项目管理特点,遵循指标设置的基本原则,构建了政府投资项目代建单位绩效考评指标体系,引入层次分析法、模糊综合评价法以及数据包络法相结合的AFD综合评价模型,并列举了应用算例。
-
The resilience detailed list valuation is the contractor establishes based on the contract award person according to the unification project, the unification measurement rule and the Measuring unit the project resilience detailed list which in kind provides according to the prescribed form, the union project are practical, the market is practical and the enterprise reality, considered fully after each kind of risk, proposes including the cost, the profit and the tax money comprehensive unit price, from this forms the project price.
工程量清单计价是承包人依据发包人按统一项目设置,统一计量规则和计量单位按规定格式提供的项目实物工程量清单,结合工程实际、市场实际和企业实际,充分考虑各种风险后,提出的包括成本、利润和税金在内的综合单价,由此形成工程价格。本文选自《改革与开放》 2009年第7期,您可以通过多种购买方式获得本刊的内容为帐户充值,可以更方便的在龙源期刊网购买文章
-
Through the method of experts'investigation, to analyze the risk on this project and choose out the headstream of the risk 2. Through the method of classification, to disassemble this project 3. Through the method of simulation, to estimate the risk of investment 4. To provide the scheme to avoid and manage the risk All of these efforts made us realizing the features of this project and mastering the rule of risk. So we can complete the project within 1000 days, and create the miracle in the field of the construction on track traffic, with the features of the limited manager, the short term, the low cost, the high technology, the high quality and the perfect safety. It has been the successful nonesuch on the research of risk management art.
首先,采用专家调查法,对项目进行了系统的风险辨识,筛选了项目面临的风险源;第二,采用分级分类的办法对项目进行逐级分解;第三,采用模拟相结合的方法进行了投资风险估计;第四,提出回避风险方案和风险处置方案,从而使工程的建设者们全面的了解了项目的建设特点,把握了风险规律,把风险控制在合理的范围内,使工程能在1000天内顺利竣工通车,并以管理人员少、工期短、造价低、技术难度高、质量优良、安全无事故等特点,创造了中国乃至世界轨道轨道交通建设的奇迹,成为风险管理管理技术研究的又一成功典范。
-
You can change the build order of subprojects within a project group on the Build page of Project Group Properties (Project|Project Group Properties).
你可以在工程组属性((Project|Project Group Properties)中Build页的工程组中更改子工程的创建顺序。
-
Through Design Structur Matrix and Critical Path Method of Network Planning Technology,the project breakdown function, the project planning function and the project attemperment function are achieved; through the New-Gunter Draft the project's real-time distribute surveillance function is realized.
通过对工程变更三要素:变更流程、人员组织和产品数据的分析,建立了工程变更的三维模型,实现了规范、有效的工程变更管理。
-
Tools CASE tools GUI's Skills training Work experience Duration: Project Name Ps handling picture Operating platform and related software skills Ps Cartoons dealing with the scope of mobile phone Proofing mobile modification tasks cartoon plane Proof of persons 13942680204 Wang Hao Duration: Project Name Operating platform and related skills Fan囲 Task Proof of persons Duration: Project Name Operating platform and related skills Fan囲 Task Proof of persons Duration: Project Name Operating platform and related skills Fan囲 Task Proof of persons the former, telephone
工具 CASE工具 GUI's 技能训练工作经验持续时间:项目名称 Ps处理图片操作平台及相関技能 Ps软件的应用范围手机漫画处理任务修改校对手机平面漫画证明人王浩 13942680204 持续时间:项目名称操作平台及相関技能范囲任务证明人持续时间:项目名称操作平台及相関技能范囲任务证明人持续时间:项目名称操作平台及相関技能范囲任务证明人名前、电话
- 相关中文对照歌词
- Project Hallways
- Project Window
- Project Niggas
- Project
- Tell The World My Name
- Wake Up Call (One More Time)
- Project Window
- Represent It
- Don't Call Me No Mo
- The God Song
- 推荐网络例句
-
Through comparing with the results by simulation to study the effects of theprojectile"s final velocity, the angle of rotation and the ballistic trajectory"s migration withdifferent projectile"s rotating speeds, different target"s moving speeds and differentpenetration angles.
通过比较数值模拟的结果来研究不同弹头转速、目标速度、侵彻角对侵彻过程中弹头最终速度、翻转角度和弹道偏移的影响。
-
I love stationery and all the accoutrement of writing.
我爱文具以及所有的书写的工具装备。
-
Just loll there: quiet dusk: let everything rip.
只消懒洋洋地享受这宁静的黄昏,一切全听其自然。