查询词典 project plan
- 与 project plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The group company carries forward the corporate spirit of "devoted to your job, self-forgetful for your dedication, dare to explore, and fight for the first grade" long years and the business tenet of "Doing a project, building good reputation and developing a market" to get to further exploration and continuous progress. It has successively undertaken the widespread big and highly difficult engineering projects, such as the foundation project of Nanjing Tairun real estate development Co.,Ltd., the installation project of Beijing Wangfujin Mansion with an area of 100,000 m2,the construction project of Liyang Jinhui Plaza(the 1st 5-star hotel in Liyang), the installation project of Beijing Oriental Plaza, the steel frame installation project of Xiaoshan International Airport, Wuxi North-City Sewage Water Treatment Factory project, the machinery and electrical equipment installation project of Beijing Century Fortune Center, the LDPE factory construction project of Germany BASF company, the first section project of Baotou Tianci Rare Earth Co.,Ltd., the lifting and installing project of 600T 189.9M shipbuilding gantry crane of Dalian Xinchuan Heavy Industry Co.,Ltd., the elevator installation project of China Sci-tech Auditorium, the 220T/H boiler dismantlement and installation project of Anhui Chloro-Alkali Chemical Group Co.,Ltd., the boiler installation project of Wujin Steel Company and the pipeline installation project for leading Yellow River to Shanxi Province , the machinery and electrical equipment installation project of Wuxi P.E. Center Swimming Stadium. The company won tens of national, provincial and municipal-level good quality projects, and meanwhile got better economic and social benefits.
多年来,集团公司以"忠于职守,无私奉献,勇于开拓,争创一流"的企业精神,以"承一项工程,树一片信誉,辟一方市场"的经营宗旨,积极开拓,不断进取,先后承接了南京泰润房地产开发有限公司桩基工程,10万平方米北京王府井大厦机电安装工程,溧阳市锦汇商业广场建设工程,北京东方广场安装工程,浙江萧山国际机场钢结构安装工程,无锡城北污水处理厂工程,13万平方米北京世纪财富中心机电设备安装工程,德国投资巴斯夫LDPE建厂工程,浙江嘉兴嘉爱斯热电有限公司热网工程,包头天赐稀土东阿工业园区一期工程,南京黑色金属公司综合楼工程,大连新船重工有限责任公司600吨 189.9米造船龙门式起重机工程,中国科技会堂电梯安装工程,安徽氯碱化工集团220T/H锅炉汽机拆装工程,武钢中天240T/H锅炉安装工程,无锡市体育中心游泳馆机电安装工程,山西引黄管道安装工程等一大批远近闻名的重大工程和高难度工程,获得了几十项国家级、省市级优质工程奖和省市级文明工地称号,取得了较好的经济效益和社会效益。
-
This paper analyzes the international situation faced by international oil industry market though the summary of international project's development of Changqing Petroleum Bureau, discusses problems in international project based on the fully analysis of CPEB's resources superiority and opportunity at present, takes the CNPC's 11th Five-Year Plan and CPEB's overall development plan as the instruction, follows the general theory and principle of international petroleum engineering project management, take the continual ,stable, coordinated development that suits and guarantees international petroleum project as the goal, discusses the development direction of international petroleum exploration project and the thread and plan that fits the CPEB's international project management based on the reference to successful experience of international petroleum companys'project management, establishes a scientific pattern that fits CPEB's project management of international project, reasonably deploys and manages all the resource in international project, makes the operation management canonical, provides scientific basis for the corporation's decision-making though adjusting and conformity CPEB's management department of international project.
本文通过对长庆石油勘探局国际工程项目发展的简述,分析发展国际石油工程市场所面临的国际形势,在充分剖析长庆局现有资源优势和机遇的基础上,分析现有国际工程项目在运行中存在的主要问题,以集团公司十一五规划和勘探局总体发展规划为指导,遵循国际石油工程项目管理的一般理论与原则,以符合和保证实现国际石油工程项目的持续、稳定、协调发展为目的,在借鉴国际石油公司项目管理的成功经验,探讨和研究国际石油工程勘探项目的发展方向,探讨适合长庆局国际项目管理的思路和方案,通过适时调整和整合长庆勘探局国际业务管理部门,建立适合长庆局自身国际工程项目管理的科学模式,合理配置和管理国际工程项目各种资源,规范运作管理,为企业决策提供科学依据。
-
Has not been submitted to CH2MHILL Safety Department for review and approval prior to commence work, such as: Foundation Excavation Safety Plan, Scaffolding building and dismantlement safety plan, Piling Safe Work Plan, Crane Operation and lifting Safety Plan, Tower Crane Safety Operation Plan, Fall Prevention Plan, Site Waste Management Plan, Site Fire Prevention Plan, Formwork building and dismantlement safety plan, Emergency Response Plan, etc
比如:基坑开挖安全方案,脚手架搭设和拆除安全方案,打桩安全方案,吊车操作及起重安全方案,塔吊安全操作方案,防坠落预防安全方案,现场废物管理方案,现场火灾预防方案,模板搭设及拆除安全方案,现场紧急反应方案等。
-
Main points of the thesis are as follows:(1) The main function models and information relations between these models in the CAPP system in the integrated CAD/CAM project are explained, a new process plan design method is mentioned based on analyses of process plan design. This method is based on the process plan prototype, and develops the prototype little by little until the perfect process plan is completed, the prospect of this method is discussed;(2) The feature abstracting rules and methods are studied, a feature coding system is developed based on GT, all the defined feature models are described by the mathematical methods;(3) The integrated method of CAD/CAPP based on features is mentioned, this method defines a feature exchanging model, and develops an interface software to exchange design data into technology data base, this technology data base includes the design and technology information of the parts;(4) The process plan reasoning method based on features is created, this method uses Mycin algorithm to solve the reasoning of the feature process plan. A process plan making system is developed. In this system part process plan is made by the semi-intelligent method, this method uses the feature reasoning, feature process chain searching and man-computer talking together;(5) The main structure of the HOPE system is introduced, a shaft drawing and its process plan made by this system are shown, the data process problem in process drawing making is also discussed;(6) A new method of describing process rule is introduced, this method uses IfThen rules and neural nets weight values together to describe process rules, the BP algorithm is adopted in this method;(7) The optimal machining sequence problem of the process steps on the same fixturing is discussed, optimal algorithms SA is applied to solve this problem, the result shows that this method is more efficient than the traditional method;(8) All jobs in the thesis are summarized. In order to carry out the research in the future, some rational proposals are given.
全文论述的内容主要有下列几个方面:(1)较为系统地阐述了CAD/CAM一体化工程项目中CAPP系统的主要功能模块及其信息流程,在分析工艺设计过程的基础上,提出了基于特征原型的渐进式工艺设计方法,并探讨了该方法的应用前景;(2)研究了零件特征提取的原则和方法,在成组技术的基础上,开发了一套基于特征的分类编码系统,并在提取零件特征的基础上,定义了零件特征的数据模型,开发了基于轴类零件特征的参数化设计系统;(3)研究了基于特征的CAD/CAPP集成的方法,通过定义零件特征数据模型的存储结构,开发了将设计数据转换到工艺数据库中的接口程序,为后续的CAPP系统提供必要的零件形状和工艺信息;(4)研究了基于特征的工艺推理方法,将Mycin算法应用到工艺决策中,开发了基于特征的工艺推理及工艺方案生成系统,在系统中综合运用特征推理、特征加工工艺链查询及人机对话相结合的半智能化方法确定零件加工工艺;(5)介绍了整个HOPE系统的总体结构,通过运行HOPE系统绘出了一轴类零件的零件图,并生成了该零件的加工工艺方案,初步探讨了基于特征的工序图生成技术中数据处理问题;(6)研究了工艺设计过程中知识如何有效表示的问题,提出了将显式的IF-THEN规则表示与隐式神经网络权值表示相结合的工艺知识表示方法,并利用BP算法进行了工艺知识表示的初步研究;(7)研究了工艺设计过程中同一安装下工步优化排序问题,利用神经网络中基于模拟退火的理论来解决该工步优化排序问题,实践证明该方法较传统的算法具有更高的效率;(8)总结了本文所进行的研究工作,为今后进一步开展工作提出了较为合理的建议。
-
Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.
通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。
-
Australia - Sydney University – Architectural and Landscape design, Project Management · Qatar - Doha Asian Games - Khalifa Stadium - Redevelopment and Landscape design · UAE - Eighth Wonder of the World - Palm Island – Master Planning and Concept design · UAE - The Burj Tower - Structural Consultant Major Projects in China · China ASEAN International Trade City – Planning design - Guangxi Nanning · Yangpu Economic District – Planning and Architectural design - Hainan · Shunyi New Town Mapo Area – City Planning - Beijing · Sanya Bay New Town Golf Villa Area – Planning and Architectural design - Hainan · First Boulevard Office Tower – Planning, Architectural and Landscape design - Hunan Changsha · Semens Beijing Headquarters – Landscape design - Beijing · 2009 East Asian Games – Sporting Venues – Building Services upgrades - Hong Kong · Macau Fortuna Hotel - Building Services design - Macau · National Flood Management Strategy Study · Kunming Qingshuihai Water Supply Project · Gansu Clean Energy Project · Guangxi Urban Environment Project · Datong Cleaner Environment Project · Beijing Olympics Transportation Plan Review · Second Shanghai Metropolitan Transport Project - Traffic Management and Safety Study · Fiscal Management and Reform in China · Policy Support for the PRC 2020 Project Outstanding Opportunities GHD has outstanding opportunities for professionals to apply and develop their skills across a broad range of industries, and within a culturally diverse international company.
在中国我们目前主要服务以下领域:建筑城市开发水环境矿业管理咨询能源交通我们的项目经验:阿联酋世界第八大奇观--迪拜棕榈岛,总体规划和概念设计卡塔尔多哈亚运会主体育场,改建设计,运动区景观设计阿联酋世界最高的大厦-迪拜塔,设计审查和材料管理澳大利亚悉尼大学,建筑设计、景观设计和项目管理 2000悉尼奥运会场馆开发,水景设计及回收系统设计,项目管理南宁中国东盟商贸城,总体规划、建筑设计和景观设计海南洋浦经济开发区生活服务区,总体规划、建筑设计和景观设计顺义新城马坡组团,规划设计海南三亚湾新城,高尔夫别墅区规划、建筑设计沙第一大道写字楼,规划、建筑、景观设计西门子北京总部景观设计 2009香港东亚运动会多个体育场馆,设备工程设计澳门财神酒店,设备工程设计国家洪水管理战略研究昆明清水海供水项目广西城市环境项目大同清洁环境项目甘肃清洁能源项目北京2008奥运会交通规划审查上海市政交通项目二期交通管理安全研究中国财政管理与改革中国2020政策支持项目优越的机会 GHD作为一家以多元文化为特色的国际性大公司,为各种专业人员在各个领域间运用和发展各自的业务技能提供优良的机会。
-
Australia - Sydney University – Architectural and Landscape design, Project Management· Qatar - Doha Asian Games - Khalifa Stadium - Redevelopment and Landscape design· UAE - Eighth Wonder of the World - Palm Island – Master Planning and Concept design· UAE - The Burj Tower - Structural Consultant Major Projects in China· China ASEAN International Trade City – Planning design - Guangxi Nanning · Yangpu Economic District – Planning and Architectural design - Hainan · Shunyi New Town Mapo Area – City Planning - Beijing · Sanya Bay New Town Golf Villa Area – Planning and Architectural design - Hainan · First Boulevard Office Tower – Planning, Architectural and Landscape design - Hunan Changsha · Semens Beijing Headquarters – Landscape design - Beijing · 2009 East Asian Games – Sporting Venues – Building Services upgrades - Hong Kong · Macau Fortuna Hotel - Building Services design - Macau · National Flood Management Strategy Study· Kunming Qingshuihai Water Supply Project · Gansu Clean Energy Project· Guangxi Urban Environment Project· Datong Cleaner Environment Project· Beijing Olympics Transportation Plan Review · Second Shanghai Metropolitan Transport Project - Traffic Management and Safety Study · Fiscal Management and Reform in China· Policy Support for the PRC 2020 Project Outstanding Opportunities GHD has outstanding opportunities for professionals to apply and develop their skills across a broad range of industries, and within a culturally diverse international company.
在中国我们目前主要服务以下领域:建筑城市开发水环境矿业管理咨询能源交通我们的项目经验:阿联酋世界第八大奇观--迪拜棕榈岛,总体规划和概念设计卡塔尔多哈亚运会主体育场,改建设计,运动区景观设计阿联酋世界最高的大厦-迪拜塔,设计审查和材料管理澳大利亚悉尼大学,建筑设计、景观设计和项目管理 2000悉尼奥运会场馆开发,水景设计及回收系统设计,项目管理南宁中国东盟商贸城,总体规划、建筑设计和景观设计海南洋浦经济开发区生活服务区,总体规划、建筑设计和景观设计顺义新城马坡组团,规划设计海南叁亚湾新城,高尔夫别墅区规划、建筑设计沙第一大道写字楼,规划、建筑、景观设计西门子北京总部景观设计 2009香港东亚运动会多个体育场馆,设备工程设计澳门财神酒店,设备工程设计国家洪水管理战略研究昆明清水海供水项目广西城市环境项目大同清洁环境项目甘肃清洁能源项目北京2008奥运会交通规划审查上海市政交通项目二期交通管理安全研究中国财政管理与改革中国2020政策支持项目优越的机会 GHD作为一家以多元文化为特色的国际性大公司,为各种专业人员在各个领域间运用和发展各自的业务技能提供优良的机会。
-
However, one should not ignore the international project financing will accompany with great risk, in the structure of Chinas system of project financing, to balance the interests of the system and risk, legal control is necessary, we have to pay attention to the study of the intrinsic nature of project financing, analysis risk factors clarify the content of the project, straighten out the in the status of project financing and so on, At the same time project financing as a result of successful project financing is a sign between the parties to the rational allocation of risks, and risk allocation is mainly through legal means, risk allocation is reasonable or not directly related to the success or failure of project financing.
更加值得注意的是,国际项目融资作为一种重要的国际融资工具,其本身的风险性特征十分明显,因此,在建构和/或完善我国项目融资制度时,注意制度的利益平衡和风险法律控制是其核心。在风险控制手段方面,我们要注意研究项目融资的内在本质,分析具体项目本身的特性,认识项目风险因素的内容,把握我国法律制度和政策的特殊个性,摆正政府在项目融资中的地位等等,是我国项目融资法律制度完善的必要环节。
-
The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.
总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:"分涑入祊"分洪道工程地质条件分析、"分涑入祊"枢纽工程地质条件分析、"分涑入祊"葛九公路桥工程地质条件分析、"分涑入祊"327国道公路桥工程地质条件分析、"分涑入祊"鹅黄公路桥工程地质条件分析、"分涑入祊"小葛庄总干倒虹吸工程地质条件分析。
-
Although its program project approving already considered investment source is little, raise money the element such as funds difficulty, but the phasic need that builds development by force of rural base again, eager for quick success and instant benefit, disregard technical standard, violate the order of nature, item of achievement in one's post is made on problem of project project approving, apply to project technology index " administrative give the final decision ", to the project investment amount is pressed crowdedly, forcedly by force, or execute construction of edge design, edge, edge to prepare funds " 3 edges " project, lack economy of due project project technology to analyse.
其规划立项虽已考虑到投资来源少、筹措经费困难等因素,但是又迫于农村基础建设发展的形势需要,急功近利、不顾技术规范、违反自然规律,在工程立项问题上搞政绩项目,对项目技术指标施行&行政拍板&,对项目投资总额强挤、硬压,或实行边设计、边施工、边筹经费的&三边&工程,缺乏应有的工程项目技术经济分析。
- 相关中文对照歌词
- Project Hallways
- Project Window
- Project Niggas
- Project
- Tell The World My Name
- Wake Up Call (One More Time)
- Project Window
- Represent It
- Don't Call Me No Mo
- The God Song
- 推荐网络例句
-
Now she was hungry and angry.She began to smoulder.
现在她又饿又气,她开始流露难以抑制的怒火。
-
You have placed our iniquities before You, Our secret sins in the light of Your presence.
诗90:8 你将我们的罪孽摆在你面前、将我们的隐恶摆在你面光之中。
-
Because of their partly crystalline structure polyamides need a relatively high processing
我们的方针是,既要满足客户的需求,并且也不使用对环境有损害的重