查询词典 program
- 与 program 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In accordance with the problems such as lower cooling effect and corrosion of the water treatment of the cooling water system of ammonia condenser ,the water treatment program of the water quality was optimized,and the water treatment effect before and after the program were summarized.
针对氨冷凝器冷却水系统水处理存在的冷却效果差和腐蚀问题,提出水质处理的优化方案,总结了优化前后的水处理效果,结果表明:使用新方案后,氨冷凝器的冷却效果得到明显的改善,冷凝排气压力降低,氨排压4机运行时为1。
-
Company's existing 33,400 square meters garden-like plant, 24 to design and manufacture of a domestic first-class lithium battery production line, annual production capacity of a lithium manganese battery 200,000,000, including lithium manganese button cell production ranks third in the world; lithium 18000000-ion battery, program-controlled tester 80,000 Units; are engaged in lithium manganese, lithium Asia, lithium-ion battery and battery tester program research, production and trade base in the professional lithium batteries.
公司现有33400平方米花园式厂房,24条自行设计制造的国内一流的一次锂电池生产线,年生产规模为锂锰一次电池20000万只,其中锂锰扣式电池产量居世界第三位;锂离子电池1800万只,程控测试仪8万台;是从事锂锰、锂亚、锂离子电池及电池程控测试仪的研究、生产和贸易的专业锂电池基地。
-
Senior program associate at the Arms and Security Project of the New America Foundation, Berrigan said today: President George W. Bush has multiple agendas as he travels through old and new Europe; one of his more provocative and alarming is the push for access to Polish and Czech territory for the multibillion-dollar 'ballistic missile defense' program.
高级项目协理,在武器和安全项目的新美国基金会, berrigan今日说:布什总统已经多次议事日程,因为他乘车经过新老欧洲;他的一个更具有挑衅性和令人震惊的是,积极推进进入波兰和捷克领土被用于数十亿美元的弹道导弹防御'计划。
-
Jiangxi Provincial Water Resources Department Director of SUN Xiao-shan traveled to the shore of Poyang Lake is located in Xingzi County, Jiangxi Province, Poyang Lake Water Environment Monitoring Center held a forum to seriously listen to Provincial Hydrological Bureau and the Poyang Lake Hydrographic Office person in charge on a comprehensive work program to carry out the Poyang Lake water quality monitoring reports, etc., and discussions with relevant experts to listen to opinions and suggestions, but also by boat in-depth Pan Yang Lake, examining Duchang County hydrological stations, hydrological stations, and Tong Yam DUCHANG COUNTY Kornhill hydrological station, a cordial call on the fighting in the first line of grass-roots hydrological workers to understand the grass-roots hydrological conditions and water quality monitoring of workers and staff to carry out work of a comprehensive program of work on the elaboration of a comprehensive monitoring of water quality of Poyang Lake launched to promote the Poyang Lake water and water environment protection.
9 17,江西省水利厅主任孙晓山奔波于鄱阳湖滨,是在星子县,位于江西省,鄱阳湖水环境监测中心召开座谈会,认真听取省水文局和鄱阳湖水文局负责人就一项全面的工作计划,开展鄱阳湖水质监测报告等,并与有关专家讨论,听取意见和建议,而且还乘船深入Pan杨拉珂,研究都昌县水文站,水文站,与棠荫都昌县康山水文站,就在基层第一线战斗的基层水文职工亲切看望,了解基层水文条件和水的质量监测和工人工作人员进行了一对鄱阳湖水质量综合监测制定一项全面的工作方案开展工作,促进鄱阳湖水资源和水环境的保护。07.9.24
-
Four 8-bit I/O Ports C Three 16-bit Timer/Counters C 256 Bytes Scratch Pad RAM C 8 Interrupt Sources with 4 Priority Levels C Dual Data Pointer Variable Length MOVX for Slow RAM/Peripherals High-speed Architecture C 10 to 40 MHz in Standard Mode 16K/32K Bytes On-Chip ROM Program T80C51RD2 ROMless Versions On-Chip 1024 bytes Expanded RAM C Software Selectable Size (0, 256, 512, 768, 1024 bytes) C 256 Bytes Selected at Reset for AT87C51RB2/RC2 Compatibility Keyboard Interrupt Interface on Port P1 8-bit Clock Prescaler 64K Program and Data Memory Spaces Improved X2 Mode with Independant Selection for CPU and Each Peripheral Programmable Counter Array 5 Channels with: C High-speed Output C Compare/Capture C Pulse Width Modulator C Watchdog Timer Capabilities Asynchronous Port Reset Full Duplex Enhanced UART Dedicated Baud Rate Generator for UART Low EMI Hardware Watchdog Timer (One-time Enabled with Reset-out) Power Control Modes C Idle Mode C Power-down Mode C Power-off Flag Power Supply: 2.7V to 5.5V or 2.7V to 3.6V Temperature Ranges: Commercial (0 to +70C) and Industrial (-40C to +85C) Packages: PDIL40, PLCC44, VQFP44
四8位I / O端口C款三16位定时器/计数器 256字节RAM的便笺簿 8中断源4优先级和C双数据指针MOVX在缓变长内存/外设高速架构为C 10至40 MHz的标准模式16K/32K字节的片上ROM程序T80C51RD2无ROM版本片1024字节扩展RAMC软件可选尺寸(0,256, 512,768,1024字节)C选取在重置为AT87C51RB2/RC2兼容键盘中断接口与独立的选择港口小一8位时钟分频器64K的程序和数据存储器空间的改进X2模式的CPU和256字节每个外设可编程计数器5通道的阵列:C型高速输出C比较/脉宽调制器捕获看门狗定时器复位功能异步端口全双工增强型UART的波特率发生器的UART低EMI硬件看门狗定时器电源控制模式空闲模式C掉电模式C断电旗电源:2.7V至5.5V或2.7V至3.6V温度范围:商业(0到+70 C)和工业(- 40C至+85℃)封装:PDIL40,PLCC44,VQFP44
-
The mass and energy change speed of the TiB2 coating paste for aluminum electrolysis during its solidification and carbonization process was studied by the DTG and DDTA, and a reasonable heating program of solidification and carbonization was established. On this basis, the effect of heating program on the properties of TiB2 cathode coating was investigated.
摘 要:采用DTG, DDTA等热分析手段,研究了高温固化、炭化过程中,铝电解用TiB2阴极涂层糊料的质量和能量的变化速率,制定了涂层的变速固化、炭化升温制度;在此基础上,研究了升温制度对TiB2阴极涂层性能的影响。
-
And because of this, Rizhao Port Group to amend the original acquisition program, so as to not raise the price of 0.1 yuan higher than that of the acquisition were not more than 61,600,000 warrants sunshine, and through cash line, so that the listing The implementation of the program's original acquisition of assets.
日照港集团修改原来的收购计划,以不提高0.1元,比这更高的价格收购不超过61600000认股权证阳光,通过现金线,使上市的程序的原资产收购的实施。
-
Cellphonetelevisionis a world cup cell phone television program launched jointly by China Mobile and Shanghai Media Group on the day before the opening ceremony of this year's world cup. The program was put into trial run in Guangdong, Shanghai and Fujian, and the China Mobile users of these three regions could go online with their MO cell phone to directly watch the programs online. China Mobile users in other provinces were also able to watch the game highlights through downloading.
手机电视是中国移动在今年世界杯开幕的前一天牵手上海文广新闻传媒集团合作开播的世界杯手机电视节目,主要在广东、上海和福建试用,这3个地区的中国移动用户可以通过MO手机上网的方式实现直接在线观看,其他省份的中国移动用户也可以通过下载方式收看到精彩的赛事片段。
-
In addition to these, a system identification computer program for the chain grate stoker was developed as well. After that, the system identification techniques based on PRBS and program was applied to an industrial-scale boiler. Practice shows that this method is easy and feasible. It could provide the theory model for the design and upgrading of the boiler's control system.
结合某20t/h链条工业锅炉的现场试验数据,利用该方法及其对应的程序对锅炉动态特性进行了建模,经验证,该辨识模型具有较高的可信度,可为锅炉控制系统设计和优化升级提供相应的理论基础和科学依据。
-
You will load the DLL and then check to ensure that the Lock program has not been modified.When the Lock program is called it will automatically check your software to ensure that it has not been modified.
您将加载的DLL ,然后检查,以确保锁定程序尚未modified.when锁定程序是所谓的它会自动检查您的软件,以确保它尚未被修改。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力