英语人>网络例句>production costs 相关的网络例句
production costs相关的网络例句

查询词典 production costs

与 production costs 相关的网络例句 [注:此内容来源于网络,仅供参考]

"Operating Costs" means the aggregate of all costs and expenses of maintaining, operating and supervising the Facility which are not properly capitalized but instead are normally charged as a current expense including without limitation: the cost of food and beverage inventories, supplies, and equipment; employment costs including but not limited to wages, salaries, employee fringe benefits, payroll taxes, bonuses, vacation pay, sick leave, profit-sharing, tax deferred compensation, retirement plans and/or pension fund contributions, costs of mobilizing and demobilizing employees, visa costs, housing allowances, automobile allowances, end of service benefits and all other employment costs arising under THE PRC law; advertising and promotional expenses incurred directly by the Facility, administrative and general expenses of the Facility, all reimbursable expenses due Troon, all insurance premiums for all insurance obtained pursuant to this Agreement (other than property insurance premiums), utility and energy costs, grounds and landscaping maintenance costs; Water Costs, routine maintenance and repair costs, operating licenses, fees and permits, credit card and travel agent commissions, and the Monthly Fee, the Base Fee, and the Cooperative Sales and Marketing Fee.

"经营费用"意谓花费在高尔夫设施上的所有维护、运作及管理的费用和开支。这些开支并不作为资本投入,而作为经常性开支的支出。其开支项目包括食品、饮料、物资和设备的花费;员工开销,如工资、薪金、员工福利、工资税、奖金、假日工资、病假工资、分红、税金递延补偿、退休计划及\或者养老金缴款、招聘或辞退员工所用花费、签证花费、住房补贴、汽车补贴、服务津贴终结费以及所有其他根据中华人民共和国有关法律支付的雇佣费用等。直接与高尔夫设施有关的广告和促销费用。高尔夫设施管理和一般费用。与特龙有关的所有可报销费用。根据本和约而购买的所有保险费公共事业费和能源费。场地与景观维护费。水费。日常维护与修理费。经营许可证、通行证等证件费用。信用卡和旅行代理费、月费、合作经营销售与营销费用等。

"Operating Costs" means the aggregate of all costs and expenses of maintaining, operating and supervising the Facility which are not properly capitalized but instead are normally charged as a current expense including without limitation: the cost of food and beverage inventories, supplies, and equipment; employment costs including but not limited to wages, salaries, employee fringe benefits, payroll taxes, bonuses, vacation pay, sick leave, profit-sharing, tax deferred compensation, retirement plans and/or pension fund contributions, costs of mobilizing and demobilizing employees, visa costs, housing allowances, automobile allowances, end of service benefits and all other employment costs arising under THE PRC law; advertising and promotional expenses incurred directly by the Facility, administrative and general expenses of the Facility, all reimbursable expenses due Troon, all insurance premiums for all insurance obtained pursuant to this Agreement (other than property insurance premiums), utility and energy costs, grounds and landscaping maintenance costs; Water Costs, routine maintenance and repair costs, operating licenses, fees and permits, credit card and travel agent commissions, and the Monthly Fee, the Base Fee, and the Cooperative Sales and Marketing Fee.

&经营费用&意谓花费在高尔夫设施上的所有维护、运作及管理的费用和开支。这些开支并不作为资本投入,而作为经常性开支的支出。其开支项目包括食品、饮料、物资和设备的花费;员工开销,如工资、薪金、员工福利、工资税、奖金、假日工资、病假工资、分红、税金递延补偿、退休计划及\或者养老金缴款、招聘或辞退员工所用花费、签证花费、住房补贴、汽车补贴、服务津贴终结费以及所有其他根据中华人民共和国有关法律支付的雇佣费用等。直接与高尔夫设施有关的广告和促销费用。高尔夫设施管理和一般费用。与特龙有关的所有可报销费用。根据本和约而购买的所有保险费公共事业费和能源费。场地与景观维护费。水费。日常维护与修理费。经营许可证、通行证等证件费用。信用卡和旅行代理费、月费、合作经营销售与营销费用等。

The buyer must, subject to the provisions of A3, pay all costs relating to the goods from the time they have been delivered in accordance with A4; and all costs and charges relating to the goods whilst in transit until their arrival at the port of destination, unless such costs and charges were for the seller's account under the contract of carriage; and unloading costs including lighterage and wharfage charges, unless such costs and charges were for the seller's account under the contract of carriage; and all additional costs incurred if he fails to give notice in accordance with B7, for the goods from the agreed date or the expiry date of the period fixed for shipment, provided, however, that the goods have been duly appropriated to the contract, that is to say, clearly set aside or otherwise identified as the contract goods; and where applicable 7 , all duties, taxes and other charges as well as die costs of carrying out customs formalities payable upon import of the goods and, where necessary, for their transit through any country less included within the cost of the contract of carriage.

除A3a规定外,买方必须支付自按照A4规定交货时起的一切费用;及货物在运输途中直至到达目的港为止的一切费用,除非这些费用根据运输合同应由卖方支付;及包括驳运费和码头费在内的卸货费,除非这些费用根据运输合同应由卖方支付;及如买方未按照B7规定给予卖方通知,则自约定的装运日期或装运期限届满之日起,货物所发生的一切额外费用,但以该项货物已正式划归合同项下,即清楚地划出或以其他方式确定为合同项下之货物为限;及在需要办理海关手续时,货物进口应交纳的一切关税、税款和其他费用,及办理海关手续的费用,以及需要时从他国过境的费用,除非这些费用已包括在运输合同中。

Main PPR, ABS, PEX Pipe Production Line, PVC, HDPE gas pipe production line, large-caliber hollow-wall winding pipe production line, silicon core pipe production line, steel-plastic composite, medical tube, nylon tube production line, PVC foam core pipe, with spiral pipe production line, posts and telecommunications perforated pipe production line, double-wall corrugated pipe, spiral pipe production line, peroxides, cross-linked polyethylene, pipe production lines, two-pipe extrusion production line, plastic board material production line, plastic foam picture frame-type material production line, SJYF plastic profile extrusion production lines, blow molding Blow Molding Machines, Single Screw eager, cold-cut granulator unit, with the parallel twin-screw extruder, SJSZ conical twin-screw plastic extruder, SJ single screw extruder, SRL-Z series mixing unit, SHR series high speed mixer, auxiliary products sold nationwide and exported to Southeast Asia more than 10 countries and regions.

主要有PPR、ABS、PEX管材生产线、PVC、HDPE燃气管生产线、大口径中空壁缠绕管生产线、硅芯管生产线、、钢塑复合、医用管、尼龙管生产线、PVC芯层发泡管、内螺旋管生产线、邮电通讯多孔管生产线、双壁波纹管、螺旋管生产线、过氧化物、交联聚乙烯、管材生产线、双管挤出生产线、塑料板材生产线、塑料发泡镜框型材生产线、SJYF塑料挤出异型材生产线、吹塑中空成型机、单螺杆热切、冷切造粒机组、同向平行双螺杆挤出机、SJSZ锥形双螺杆塑料挤出机、SJ单螺杆挤出机、SRL-Z系列混合机组、SHR系列高速混合机、辅机系列产品畅销全国并出口东南亚等十多个国家和地区。

The new circumstances that the discrete manufacturing enterprise is confronted with are analyzed; the function and configuration of production system is expounded; the research actuality and contents about production system capacity in the discrete manufacturing enterprise are summarized; the main research contents in this paper are developed.2. The calculating and analytical methods about production system capacity are studied systemically, a model to calculate rough-cut capacity instantly in "excel" table style is designed, the means to analyze production capacity in different production mode are brought forth, and the balance tactics of production capacity versus load are put forward.3. The application characteristics used in production system about the methods of Computer simulation and CRP in the MRPII/ERP are analyzed and compared; the advantages of Computer simulation method are pointed out; and the simulation researches aiming at production system capacity are implemented by Ithink simulation software.4. A simulation model is founded under the analysis of production system capacity in the production system background of a firm; the change instances of yield, output rate and WIP in the production system are simulated by the action of procurement cycle, machining time, setup time and so on. 5. The change instances of production capacity in the assembly stage are simulated , and rational employees are obtained.

本文主要进行了以下几个方面的研究:1、分析离散型制造企业面临的新情况,阐明生产系统的功能和结构,对离散型制造企业生产系统生产能力的研究内容和现状进行分析,提出本课题的主要研究内容。2、在系统地研究生产系统生产能力的计算和分析方法后,设计了用Excel表快速计算粗能力的方法;给出不同生产方式下的产能分析方法,并提出产能与负荷平衡的策略。3、比较和分析了MRPII/ERP的能力需求计划方法与计算机仿真方法在生产系统中的应用特点,指出计算机仿真方法的优势,并用Ithink仿真软件对企业生产系统生产能力进行了仿真研究。4、以A公司的生产系统为背景,在对生产系统生产能力分析的基础上建立了仿真模型,模拟了在采购周期、加工时间、调整时间以及返工率、废品率、机械开工率等因素作用下生产系统的产量、产出率和在制品数量的变化情况。5、研究在装配阶段生产能力的变化情况,通过仿真优化后确定合理作业人员数量。

Companies from the United States, Germany, Sweden, the introduction of advanced production equipment and technology, the design annual production capacity of 100,000 tons aluminum, the main equipment has been put into deep well-type aluminum rod casting production lines, 500 tons -1650 tons of aluminum extrusion 9 production lines, 1600m / m aluminum casting production line 4, 1450m / m 2 of cold-rolled production line, 1500 m / m embossing plate production line, 1850m / m 2 cross-cutting production line, 2200m / m thick plate production line, 600m / m-1450m / m thick shear foil production line 3, 1450 m / m bending-straightening production line, 1000 * 5000m / m a CNC grinding machine, annealing furnace 20 tons of plate and strip, such as four-foil finishing equipment.

公司分别从美国、德国、瑞典引进先进的生产设备和技术,设计年产铝材十万吨,其中主要已投产设备有深井式铝棒铸造生产线两条,500吨-1650吨铝型材挤压生产线九条,1600m/m铝板铸轧生产线四条,1450m/m冷轧生产线两条,1500 m/m 压花板生产线一条,1850m/m横剪生产线二条、2200m/m厚板生产线一条,600m/m-1450m/m厚箔剪生产线三条,1450 m/m拉弯矫生产线一条,1000*5000m/m数控磨床一台,20吨退火炉四台等板带箔精整设备。

Such as building materials costs, ancillary costs, taxes, management costs, design and supervision costs, bank interest and other unforeseen costs, etc., then why Haikou real estate prices than domestic capital cities is much lower most of it?

如建筑材料费用,辅助费用,税收,管理费,设计和监督费,银行利息和其他不可预见的费用等,那么,为什么海口的房地产价格比国内省会城市低得多,大部分?

They also point out that those trading costs include currency risks, tariffs, customs inspections and informational barriers: transport costs have tended to comprise only a third of trading costs, and of course fuel costs are only a proportion of transport costs themselves - probably just under half, even at current oil prices.

他们指出,贸易成本包含汇兑风险、关税、海关检查和信息壁垒;运输成本往往只占贸易成本的三分之一,当然,燃油成本又只占运输成本的一部分——即使按当前的油价计算,可能还不到一半。

It has multiterm production lines including coccidium vaccine production line, Herbal extract production line, API synthesis production line, powder production line, premix production line, Small volume injection production line, oral liquid production line and disinfectants production line, and so on. It has more than 100 products of 8 Series. We ivested eight million yuan to build a new live coccidium vaccine production workshop in 2008. The new live coccidium vaccine has been declared to national new veterinary medicine Evaluation center and in clinical trial stage.

拥有球虫疫苗、中药提取、原料合成、粉剂、预混剂、散剂、小容量注射液、口服液、消毒剂等多条生产线,现有产品八大系列100余个品种。2008年投资800万元在亚宝生产基地新建一座球虫活疫苗车间,并取得了GMP证书(证书号:(2009)兽药GMP证字185号)和生产许可证(证号:(2009)兽药生产证字04034号),球虫活疫苗已报国家新兽药评审中心,现已进入临床试验阶段。

Authorities shall consider all available evidence on the proper allocation of costs, including that which is made available by the exporter or producer in the course of the investigation provided that such allocations have been historically utilized by the exporter or producer, in particular in relation to establishing appropriate amortization and depreciation periods and allowances for capital expenditures and other development costs. Unless already reflected in the cost allocations under this sub paragraph, costs shall be adjusted appropriately for those non recurring items of cost which benefit future and/or current production, or for circumstances in which costs during the period of investigation are affected by start up operations.

当局应考虑全部现有的成本适当分配的证据,包括出口商或生产商在调查过程中作出的分配证据,其前提是该分配在历史上一直被出口商或生产商所使用,特别应对有关确立适当的分期付款和折旧期限、按资费用以及其它开发成本的补助费加以考虑,除非根据本款项规定已在成本分配中得到反映,否则成本应对那些有利于将来或当前生产的非经常性项目成本作出适当的调整,或者对在调查期间成本费用因刚开始生产而受到影响的情况作出适当的调整。

第1/500页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Loose Talk Costs Lives
Shine Your Cadillac
Victim Of Mass Production
Flex
Spotlight
Annihilation
Paper Bag
Hold At All Costs (July 2, 1863)
The Price Of Love
The Price Of Love
推荐网络例句

As of Tuesday, Google's results were still censored in China.

截至周二,谷歌的搜索结果仍受中国审查。

In order to make the positive action increase and negative one decrease, the sub-forces of the social factors must be adjusted to form a centripetal force.

在这一过程中,人的主体性发挥是社会有机体健康发展的灵魂。

Objective To investigate the relationship between the telomer ase activity and apoptosis in gastric cancer.

目的为了探讨胃癌组织中端粒酶与细胞凋亡的关系。