英语人>网络例句>process furnace 相关的网络例句
process furnace相关的网络例句

查询词典 process furnace

与 process furnace 相关的网络例句 [注:此内容来源于网络,仅供参考]

According to the future trend of iron ore and the comparison of process and metallurgical properties, the hybrid pelletized sinter can replace the now compound burdens, it is the future trend of the blast furnace burden constitution.

从含铁原料的发展趋势和工艺过程以及冶金性能的比较,混合球团烧结矿完全可以替代现有的复合炉料,它是高炉炉料结构的发展方向。

In the process of steel production, it's important to avoid serious air pollution and take full advantage of coal gas which comes from blast furnace , coke oven , or converter. Generally, we collect the gas mentioned above and store it in the storage bank or storage tower, then the gas can be transmitted to the relay pressurizing station by piping. At last, the by product can be used as fuel.

在钢铁行业生产中,为了避免严重的空气污染并充分利用高炉、焦炉和转炉产生的煤气这一高热值燃料,一般处理过程是将产生的各种煤气分别收集到贮气罐再用管道传送到中继加气站经加压后供各用户使用。

The heat air sintering and the constitution of blast furnace burdens and the hybrid pelletized sinter process have been studied in laboratory.

在实验室中,对低温热空气烧结、高炉炉料结构以及混合球团烧结工艺进行了比较系统的研究。

The process of radiative heat transfer in a three dimension rectangular furnace is simulated using discrete ordinates method.

本文首先对辐射传递方程的坐标进行离散,最后对三维矩形炉膛内辐射传递过程进行数值模拟,并与区域法进行比较,从而验证了离散坐标法的求解精度。

The manufacture of copper core of automobile radiator includes coating tinned or bared copper cooling pipe; roasting assembled main core inside braze welding furnace at 230-280 deg.c for 30-60 sec; welding main sheet to cooling pipe via conventional process; and welding the copper lid opening for the water chamber with brazing agent without solder and welding filament.

一种铜质汽车散热器主芯的制造方法,其先将镀锡冷却管或裸铜冷却管外壁分别进行覆膜处理。将组装好的主芯主体置于铜钎焊炉内于230~280℃温度焙烧30~60秒。主片与冷却管间采用常规的方法焊合。还可以将组装好的主芯主体每排冷却管上摆放一根外表面涂有无钎料钎剂膜的锡焊丝,它们贴在冷却管与主片结合处。

The differences in temper ing process between small thin and thick pieces of glass have been pointed out , technical index of heating furnace and wind grating have also been introduced .

说明了小片薄玻璃在钢化生产过程中与厚玻璃钢化的不同,简要介绍了加热炉和风栅等设备的技术指标。

It introduced the process flow and main features of positive back suction wind dust catcher dudusting of positive back suction wind for 6 300kV·A ore furnace.

A矿热炉采用正压反吸风袋式除尘器除尘的工艺流程和主要特点,对其设计进行分析。

Water-quenched samples were prepared by re-melting blast furnace slag and then quenching it at different temperatures. The effects of forming process on the relationship between structure and cementitious reactivity of quenched slag were studied by XRD, DTA, TEM, SEM and EDX techniques in combination with mechanical property and alkali leaching tests.

采用重新熔融水淬的方法制备不同水淬矿渣样品,综合进行净浆强度实验和碱溶出实验研究,借助XRD,DTA,TEM,SEM和EDX等分析手段,研究了矿渣形成过程、形成结构和胶凝性能之间的关系,并在此基础上探讨了矿渣潜在胶凝活性的形成机理。

It focused on the cycle of blast furnace production of two town gas from coal gasification process and the basic requirements for the production cycle time of their choice and some indicators of a comparative analysis of gasification.

文中着重介绍了循环鼓风两段炉生产城市煤气的工艺流程和对气化用煤的基本要求,对其生产循环时间的选择和部分气化指标作了比较分析。

Abstruct : The raw coal gas produced by coal gasification furnace contains high-concentration dust, water, tar and other impurities, which influences the effective operation of CO conversion process and causes high operation cost.

煤气化制气炉粗煤气中含有较高浓度粉尘、水、焦油等杂质,影响了 CO 变换工艺的有效运行,导致操作费用大大增高。

第18/20页 首页 < ... 12 13 14 15 16 17 18 19 20 > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?