英语人>网络例句>process control 相关的网络例句
process control相关的网络例句

查询词典 process control

与 process control 相关的网络例句 [注:此内容来源于网络,仅供参考]

A high-resolution Differerntial Thermal Analysis apparatus was used to sinter the mixture of Mg and B powder and monitor the reaction process. Based on the classical sintering theory and multiple scan kinetic analysis method, the formation process and mechanism of polycrystalline MgB2 during in-situ sintering process were systemticlly investigated and the optimal sintering process was determined.

上述研究包含的主要内容和获得的结论有:利用高精度差热分析仪对Mg粉和B粉的混合试样进行烧结处理并同步监控其反应进程,在实验分析的基础上,结合经典烧结理论和多重扫描动力学分析方法,系统研究了原位烧结制备过程中多晶MgB2相的形成过程及成相机理,并确定了最佳烧结工艺。

The paper introduces new construction methods for mixed pond of red mud from Bayer process and red mud from Sintering process and compares it with"dry process"and "wet process"ponds.

介绍了一种将拜耳法赤泥与烧结法赤泥混合堆坝的新型筑坝方案,并将此筑坝方案与一般的&干法&和&湿法&筑坝方案进行比较,评价各种不同方案的特点。

The plastic deformation mechanism of the process is explained. The vector equations of the curved conical surface and the figure of the particle motion for the forming process of the bending tube are presented. The theoretical model of stress and strain fields of the forming process is deduced. The practical forming process of tubes of large diameter demonstrates the validity of the new type of design method of the ox-horned core bar and the computation formula of the length of the raw tube.

本文通过研究弯管成形瞬时应力、应变状态及演化过程,阐明了弯管成形过程受力变形特点及力学原理;提出了一种适合弯管变形分析的新单元及数值方法;建立了弯管成形过程应力、应变场&标准图象&;通过研究弯管成形过程金属流动规律及力学条件,阐明了本工艺塑性变形机理;建立了描述弯管成形过程的曲锥面向量方程及其质点运动学图象;推导了弯管成形过程应力、应变场理论模型;结合大口径弯管生产过程,验证了本文给出的新型牛角芯棒设计方法和管坯长度计算公式的正确性。

In this paper, oil filter on a CA6140 lathe structure and process analysis, to determine the machining process line, to develop the manufacturing process of parts and machining process planning, and processing the oil into and out of the mouth parts designed two sets of special drilling jig.

本文对CA6140车床滤油器进行了结构和工艺分析,确定了机械加工工艺路线,制订出了零件的制造工艺方案和机械加工工艺规程,并为加工零件进出油口设计了两套专用钻床夹具。

Interlayer oxidized zone can be divided accurately by Fe_2O_3, Fe_2O_3/FeO and U parameters. We can correct the field macroscopic color zoning by combining the macroscopic zoning and microscopic zoning. Univalent major elements components(Al_2O_3, SiO_2, K_2O, Na_2O) show remarkable activity at the process of interlayer oxidizing, their contents are variable and mingled in different zones and it can't be used in zoning. But we can speculate the developmental degree of interlayer oxidized zone and uranium mineralization according to the concentration trends and variation characteristics of sensitivity group, activity group and their ratios .(3)The comparatively steady elements such as lithiphile elements, sulfophile elements and high field strength elements change regularly at the process of interlayer oxidation except some radioactive elements. Trace elements and rare earth elements commonly enrich in thin rock clast such as mudstone, in which the enriched elements species are more than those in the whole rock, which indicate that the regeneration action in caulking matter are more deep than that in whole rock at the process of interlayer oxidation, and the reallocate intention of trace elements in main minerlized rock in Tuha basin are more intensive than that in Yili basin at the process of deposition ,diagenesis and later changes .

根据化学蚀变参数PC值和分离迁移位等将常量元素组分分为敏感组分组、活动组分组、次活动组分组和惰性组分组,不同组分可分别用于讨论层间氧化带低温地球化学中不同问题;敏感组分(变价元素组分Fe_2O_3、FeO)和U在层间氧化带中迁移富集规律明显,Fe_2O_3/FeOFe~(3+/Fe~(2+)比值具分带判别能力,配合U含量对层间氧化带进行较准确的分带,可克服野外宏观颜色分带偏差:提出Fe~(3+)/Fe~(2+)分带判别值在不同盆地、不同地段不同,除受氧化作用控制外,流体酸碱度不同也是重要因素的观点,对找矿实践有实际指导意义;活动组分(Al_2O_3、SiO_2、K_2O、Na_2O)在层间氧化作用过程中具有较明显的活动性,其含量值变化跳跃,在不同分带相互交织,不具分带指示意义;但利用敏感组分、活动组分及其比值在层间氧化带中的变化特征可推测层间氧化带发育的完善程度及其含矿性;次活动组分组(CaO、MgO、MnO_2)含量低,变化规律性差;惰性组分组(TiO_2、P_2O_5)含量低,活动稳定,可用来反映沉积物源特征。

At this stage of the knowledge creation process, the knowledge activist formulates process triggers such as: What do we know about the chicken deboning process How can we develop knowledge about this process Why do we use just knowledge about mechanical electronics

在现阶段知识创造程序,知识活跃份子制定程序触发器,像是:关於小鸡我们知道到什麼剔除肉中的骨头程序?我们如何能发展对这一程序的了解?我们为什麼只是使用对机械的电子学的了解?

This process is makes the improvement in the original two person two-sided synchronized GTAW process which one time welding two-sides formings, we have carried on a series of welding testing on 8mm SUS304, this new process has be able to decrease weld defects on the tradition two person on both sides synchronized GTAW process, shortenned construction work period, increase welding quality, as well as eliminate tradition two person on both sides synchronized GTAW for SUS304 austenite stainless steel in easy emergence of incomplete joint penetration and porosity.

此工艺是在原有的双人双面同步钨极氩弧焊工艺基础上进行的,即将原有的一次焊双面成形改为两次焊成形,经过在厚度为8 mm的SUS304上进行的一系列焊接工艺试验,验证了这项新工艺既减少了传统工艺中繁琐的工艺过程和焊接工艺缺陷,缩短了施工工期,提高了焊接质量,又消除了传统8 mm SUS304不锈钢双人双面同步钨极氩弧焊过程中易出现的未焊透和咬边现象。

The law of factors' affecting degree, which influences the parameters between geogrids and soils in the pulling-out procedure, is obtained. With the concept of 'equivalent pull-out displacement' brought forward, the whole process of pull out tests is divided into two process-" main process (when x 1.0)" and "residual process (when x 1.0)", and three stages-static friction resistance stage, slip friction resistance stage, and residual friction resistance stage.2 The value of friction coefficient between reinforcement and soil varies with their definitions of friction, but each factor' s affecting degree influencing friction pa

将模糊控制理论引入了岩土工程过程分析,考虑影响因素影响程度的变化及其规律,提出了一套可供岩土工程过程分析中参数选择的分析方法,并在筋土界面相互作用参数选取的拉拔试验过程控制中获得实施,为应用有限元法对加筋土结构进行过程中南大学博士论文摘要分析提供了参数选择的新方法;将模糊聚类分析方法应用于加筋土陡边坡状态评定,并提出侧向位移可作为加筋土边坡状态评定的量化指标,而不同类型边坡的侧向位移允许控制值可仿效此法结合工程经验确定。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计的过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适的建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备的设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间的初步设计。

The design process is: to select the best process, drawing process maps, after the material of the process, heat is calculated to select the required specifications for production equipment models, a comprehensive natural conditions, transport, economic and other factors in selecting suitable areas The building addresses, format of the workshop construction, equipment to deal with layout, rendering plant layout, equipment flow chart, response equipment, such as design and graphics, the last of the water, electricity, gas and other public works to estimate the amount of ventilation, heating , environmental protection, fire prevention, safety and health content on to complete the preliminary design of the workshop.

本次设计の过程是:选择最佳工艺流程,绘制工艺流程图,之后对各工序物料、热量进行计算,选定所需生产设备规格型号,综合自然条件,交通,经济等个方面因素选择合适の建厂地址,对车间建筑形式,设备布置进行处理,绘制车间布置图、设备流程图,反应设备の设计与绘图等,最后对水、电、汽等公用工程用量进行估算,对通风、采暖、环保、防火、安全卫生等内容进行阐述,从而完成了车间の初步设计。

第38/500页 首页 < ... 34 35 36 37 38 39 40 41 42 ... > 尾页
相关中文对照歌词
Lose Control
Part Of The Process
Control
Loss Of Control
Takin' Control
Let The Beat Control Your Body
Illumination
A Process So Familiar
P Control (Remix)
Control
推荐网络例句

Salt is good, but if the salt becomes flat and tasteless, with what do you season it?

14:33 盐本是好的,盐若失了味,可用什么叫它再咸呢?

He reiterated that the PLA is an army of the people under the leadership of the Communist Party of China.

他重申,人民解放军是在中国共产党领导下的人民军队。

After five years at the Laue-Langevin Institute in Grenoble, France, Jolie turned his focus to experimental work when, in 1992, he accepted a position at the University of Fribourg in Switzerland.

他在法国格赫诺柏的劳厄–蓝吉分研究所工作了五年之后,1992年转往瑞士夫里堡大学从事实验研究。