查询词典 pressure bar
- 与 pressure bar 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Pressure range 30 to 75psi (2 to 5 bar) with corresponding high ratings from 925,000 to 10,700,000 BTU/hr.
压力范围为30至75 psi (2至5 bar),相应热值高达925,000至10,700,000 BTU/小时。
-
In order to study impact mechanical properties of the basalt fiber reinforced concrete, the BFRC specimens with 0、0.1% and 0.3% fibre volume content were prepared. The Φ100mm split hopkinson pressure bar apparatus was adopted tocarry out the impact compressive experiment. The dynamic stress-strain curves were obtained. The impact mechanics performance of BFRC were studied through analyzing the impact compressure strength and deformation.
摘 要:为了研究玄武岩纤维混凝土(basalt fiber reinforced concrete,简称BFRC)的冲击力学性能,制备了纤维体积掺量分别为0、0.1%和0.3%的BFRC试件,采用Φ100mm分离式霍普金森压杆(split hopkinson pressure bar,简称SHPB )设备对BFRC试件进行了冲击压缩试验,得到了BFRC的动态应力应变曲线,从冲击压缩强度和变形两方面研究了不同应变率下BFRC的冲击力学性能。
-
The optimum technology was that aqueous phase and oil phase mixed at 70 ℃, sheared 20 min by high speed shearing machine and then passed the ultra-high pressure nano homogenizer 6 times under the pressure of 900 bar.
结果 最优处方为10%油相,1.2%乳化剂,0.1%稳定剂;最优工艺为水相和油相在70 ℃混合,10 000 r/min高速剪切20 min,在900 bar压力下高压均质6次。
-
The steam chest ,vapor separators,preheater and surface condenser are designed and constructed for an internal pressure of 1 bar gauge and full vacuum at 121 ℃ except as follows .the shellside of the first effect chest is designed for an internal pressure of 2 bar gauge and full vacuum at 135℃.the bubeside of the prehearter and surface condenser are designed for an internal pressure of 7 bar gauge and full vacuum at 121℃.the equipment is designed and constructed in accordance with asme.certificates are provided.
蒸发分离室,蒸汽室,预热和冷凝器要设计结构内部能够承压1 bar 和在121 ℃充满真空。一效蒸汽室壳侧要设计成能够承压2 bar 和在135 ℃。预热器的管侧和表面冷凝器设计成7 bar 和在121 ℃。设备的设计和制造要符合ASME。要提供证明。
-
A dynamic spalling strength test of fiber RPC(steel-cotton,coppered steel and hookish steel fibers)cylinder specimens(φ70×500) was carried out by using φ74 split Hopkinson pressure bar.
采用φ74变截面Split Hopkinson Pressure Bar对φ70×500的3种钢纤维(钢棉、镀铜钢纤维、端钩钢纤维)种类及5种配比的活性粉末混凝土,进行同一种应变率下动态层裂强度的实验测试。
-
The design-calculation methods which are suggested in this thesis in terms of the width of inclined pressure bar and the bearing capacity of stress and sheer of inclined pressure bar only try out to further study on the design and calculation of RCFEN.
论文提出的钢筋混凝土框架外节点斜压杆宽度、外节点抗压承载力、外节点抗剪承载力计算方法只是对框架外节点的设计计算方法进一步研究的一种尝试。
-
In this thesis, the influence of column force, joint hoop reinforcement, and repeat load on the stress and sheer bearing capability of inclined pressure bar is analyzed utilizing finite element software. In the case study, the column axial force's influence on the inclined pressure bar's equivalent width, stress and sheer bearing capability of RCFEN is obtained by changing the column force when modeling the RCFEN with ANSYS. In the former model, the joint hoop reinforcement influence on the equivalent width inclined pressure bar and the strength of RCFEN is achieved by changing the quantity of joint hoop reinforcement; the inclined pressure bar's equivalent width and the strength variation of RCFEN under cyclic load are gained by applying low frequency cyclic load on the inflection point of column and the middle of beam.
针对上述算例中的框架外节点采用ANSYS进行建模,运用有限元软件分析了柱轴力、节点箍筋、反复荷载对外节点斜压杆承载力、抗剪承载力的影响:改变柱轴力,研究了柱轴力对斜压杆的等效宽度、框架外节点斜压杆承载力、框架外节点斜压杆抗剪承载力的影响;在上述模型中,改变节点箍筋的数量,分析了节点箍筋对斜压杆的等效宽度、框架外节点强度的影响;在上述模型中,在柱反弯点和梁中点均进行低周反复加载,讨论了在反复荷载作用下,框架外节点的斜压杆的等效宽度、框架外节点强度的变化情况。
-
A polymeric buffer bar is employed to replace the conventional metallic transmission bar in a split Hopkinson pressure bar to determine the spalling strength of a long concrete rod that is placed between the metallic incident bar and the polymer buffer bar.
提出了利用Hopkionson压杆测量混凝土层裂强度的新实验方法:用高聚物材料取代传统的金属材料透射杆,混凝土试件为细长杆,由于高聚物波阻抗比混凝土小,试件中压缩波在试件/吸收杆界面反射后形成拉伸波使试件产生层裂破坏,通过吸收杆上透射波形可以确定混凝土层裂强度。
-
Each time after putting to (the instrument with the set of Yamshidi-Nadel provided by Kypho of America for injection of bone cement into the vertebrae; each putting could contain about 1.5 mL bone cement) inject bone cement into the vertebrae, the pressure P was not very high, with 500 kPa bar below for majority and the effect caused showed a significant statistical difference (P.01). Whereas, the pressure within the area of the vertebral P value was not high either, the majority was 10.00 Unit lower, which also led to the effects of significant difference (P.01). Both two states showed partial distribution. After making the statistical analysis to the casual two puttings between the first, second, third and fourth putting of each vertebrae, there existed the general differences. The differences were also found between other puttings (a.0083) on the statistics basis apart from between the first and second and between the third and fourth.
结果 每个椎体的椎体成形术均达到临床评价要求,每次推杆(美国Kypho公司提供标准椎体成形术中Yamshi-Nadel套系中推注骨水泥入椎体的器具,每具推杆可容纳骨水泥约1.5mL)推注骨水泥入椎体时所产生的椎体内的压力P不是很高,多数在0.50 bar以下,其所导致的效应具有显著的统计学差异(P.01),而每次推杆推注骨水泥入椎体时的椎体内压力面积值P也不是很高,多数在10.00 Unit以下,其所导致的效应具有显著的统计学差异(P.01),两者均呈偏态分布;而且,对每例椎体的第一、二、三、四杆之间两两予以统计学上的分析,在总体存在差异有统计学意义的基础上还发现除第一和二杆、第三和四杆之间外,其他各杆之间存在着差异(a.0083)。
-
New box design with durable 0.5 inch (13 mm) paving skin Vertically-adjusting mold mount for precise leveling of mold to machine Telescoping end sections with 12 inches (305 mm) of width variation on each side are available Standard paving depth is zero to 24 inches (610 mm)Edge slump adjustment Hydraulic Vertical Hinged Sideplates, self-contained inside the mold for track clearance Split, pressure-compensated sideplates Folding side plate wings for transporting without removing Pivoting mold mounting beam to eliminate stress points Self-supported TA is hydraulically driven with 3.5 inch (89 mm) ACME screws for up to a six inch (152 mm) crown Front and rear top T-bar on mold for attaching accessories and structural integrity Inserts are bolted together with front and rear alignment pins for easy mold assembly New vibrator mounting tube attaches to T-bar on mold – Vertical vibrator lift – Rear lubrication system with grease zerks accessible from the work bridge New strike-off – Mounted on paver frame T-rail, independent of the mold – New modular design with wedge lock system for ease in changing widths – 10 inches (254 mm) of hydraulic height adjustment – Hydraulic crown adjustment Spreader plow mounted to paver frame T-rail, optional auger available Tamper bar optional
与耐久性的新的箱子设计铺精密水准测量的0.5英寸(13 mm)皮肤垂直调整的模子登上模子用机器制造挤撞与12英寸(305 mm)的末端部分在每边的宽度变异是可利用的标准铺的深度是零对24英寸(610 mm)边缘暴跌调整水力垂直的取决于的Sideplates,独立性在轨道清除分裂的模子里面,折叠运输的pressure-compensated sideplates旁边板材翼没有去除在轴上旋转的模子架置射线消灭重音点Self-supported TA水力驾驶与3.5英寸(89 mm)由六英寸(152 mm)冠决定的尖端螺丝在前后冠上在模子的T酒吧附有的辅助部件并且结构正直插入物与容易的模子汇编新的振荡器架置管随员T酒吧的定位销一起在前后被闩上在模子–垂直的振荡器推力与油膏zerks的–后方润滑系统容易接近从新工作的桥梁触击–在摊铺机框架足迹,模子的独立登上了与楔子锁系统的–新的模块设计在改变的宽度的舒适的– 10英寸(254 mm)水力高低调整–水力冠调整分布器犁登上了对摊铺机框架足迹,任意任意木钻可利用的堵塞器的酒吧
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。