查询词典 prefabricated
- 与 prefabricated 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
When stager journalist Alistair moneyman died in 2004 whatever suspected that he was still to exhibit his large story. What happened to his embody as it place in a funeral bag would expose a news of past period demise pillage and helped blast a body-snatching anulus that had prefabricated jillions of dollars by chopping up and selling-off over 1000 bodies.
2004年,当资深播音员 Alistair moneyman 去世时,少有人想到,他还没来得及讲自己最大的故事:在太平间,他遗体的遭遇揭露了现代&盗墓&的传奇,并粉碎了一个买卖一千余具遗体并获利数百万美元的遗体掠夺圈。
-
The concrete composite box net joint floor is one kind of new-style floor. It is composed of the small prefabricated component with the cast-in-place concrete rib beam. The box and rib beam form a whole structure that has continuous box section and undertake the load together.
混凝土叠合箱网梁楼盖是一种新型的楼盖形式,是由小型预制构件与现浇混凝土肋梁结合成具有连续箱型截面的整体结构,箱体与肋梁共同受力。
-
Leading products hollow solid block all kinds of hydraulic machine, rotating roller, centrifugal, squeeze-type legislation, cement pipe machine, various types of ingredients-mixer, floor, Tan of the wood, light-molding machine, liquid Pressure, ground tile-,0.5-20 tons gantry crane, and so on nearly 100 kinds of products, widely applicable to the construction, municipal and water conservancy projects, such as plant and prefabricated units.
主导产品各式液压空心实心砌块成型机、旋辊式、离心式、立挤式、水泥制管机,各种型号的搅拌机配料机、楼板、檀条过木、檐板成型机、液压、地面花砖机,0.5-20吨龙门吊等近百种产品,广泛适用于建筑工程、市政、水利工程以及预制构件厂等。
-
On the basis of standard drawing of 16m T-beam bridge, one 4 m prefabricated concrete model T-beam bridge by using of welding steel plate was designed.
以16m跨径的T梁桥标准图为基础,按1:4的缩尺比例,采用焊接钢板的连接方法设计了一座5片T梁桥模型。
-
According to the design and reasonable technique research, the compositecylindrical shells with grid stiffeners are prefabricated successfully.
依据这一设计方法,通过合理的工艺研究,成功试制出深水下某种型号的复合材料网格加筋圆柱壳。
-
Through analyzing Gaya prefabricated box girder bridge, a comprehensive summary of production from the box girder pedestal, vertical mold, concrete pouring, to the tensioned prestressed steel beams, grouting, sealing anchor the whole process of construction technology, providing the corresponding construction methods, concrete mix, vibrated time, and prestressed tension and other technical data.
通过对嘎呀河大桥箱梁的预制,全面总结了从箱梁台座制作,立模,混凝土浇筑,到预应力钢束张拉、灌浆、封锚全过程的施工工艺,提供了相应的施工方法、混凝土配合比、振捣时间和预应力张拉等各种技术数据。
-
Through analyzing Gaya prefabricated box girder bridge, a comprehensive summary of production from the box girder pedestal, vertical mold, concrete pouring, to the tensioned prestressed steel beams, grouting, sealing anchor the whole process of construction technology, providing the corresponding construction methods, concrete mix, vibrated time, and prestressed tension and other technical data.
预应力混凝土箱梁预制施工技术及质量控制,工程建筑论文,工学论文通过对嘎呀河大桥箱梁的预制,全面了从箱梁台座制作,立模,混凝土浇筑,到预应力钢束张拉、灌浆、封锚全过程的施工工艺,提供了相应的施工方法、混凝土配合比、振捣时间和预应力张拉等各种技术数据。
-
Hydraulic pile hammer is one of the pile driving machines that drive prefabricated piles into the ground in the construction of pile foundation such as construction,bridge,dock, etc.
用液压打桩锤打桩,可以调整撞击应力波波形,减小应力峰值,延长有效作用时间,是一种比较理想的预制桩施工机械,目前在发达国家已被广泛使用,并形成了系列化。
-
Hydraulic pile hammer is one of ideal prefabricated pile driving machines because it can adjust stress waveform ,decrease stress peak value,prolong effectual act
认为与桩等波阻的细长状锤体能够产生理想的应力波波形;在桩锤重量一定的情况下,可针对不同的地质情况和桩,通过选择不同刚
-
We use two ways to build roof system. To assemble on site light steel purline. To hoist and assemble prefabricated wall body and roof. In the first method, we can build roof with complicated styles and with flexible layout. By the second one, we can build faster.
可采用轻钢檩条现场拼接,也可在工厂预制轻钢墙体及屋架,采用现场吊装的方式,前者可建造复杂造型的屋面,布局更为灵活,后者能大大提高现场的建造速度。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?