查询词典 power transmission network
- 与 power transmission network 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
After years of practice and exploration, the company made great contributions to helicopter operations on patrol inspection of 500kv EHV electric power transmission line, live EHV transmission line insulator flush, hotline maintenance, wire setting-out, laser scanning and patrol inspection of UHV transmission line, filling in the gaps in the country and ensuring the safe stable operation of power network. The company has operations in the 500KV EHV Air Patrol, live maintenance, exhibition guide rope release, laser scanning and 1000KV Air Patrol operations and other special high-voltage electrical work on the helicopter filled a number of technical blank, to further ensure the security and stability of power grid to make an important contribution.
在多年的实践探索中,公司先后在500千伏超高压航巡作业、带电水冲洗绝缘子、带电检修、展放导引绳、激光扫描和1000千伏超高压航巡作业等直升机电力作业上填补了国内多项技术空白,为进一步确保电网的安全稳定运行做出了重要贡献。
-
There are complex variations in realistic low-voltage power line network topology framework.In order to study the low-voltage power line transmission channel model,a model to describe the power line network channel topology framework is established in terms of basic characteristics of low-voltage power line network in this paper.
低压电力线网络拓扑结构变化复杂,为了研究低压电力线信道传输模型,根据低压电力线网络的基本特点建立了描述电力线网络拓扑结构的模型,利用模型把低压电力信道作为一个过程去描述,建立了节点信号传输函数来推导低压电力线网络的传递函数。
-
However, in the areas lack of electric energy, it is impossible for transmission network to form a relatively strong netty structure at present stage, merely to form a catenulate structure, consequently, the transmission capability of long distance power line that mainly lies on the lines stability limit is an issue in the development of transmission network.
而一些远离中心电网的缺电地区的电网在现阶段不可能形成较为坚强的网状结构,只能是长距离链形结构,而这种长距离输电线的输送能力主要取决于线路的稳定极限,是电网发展过程中的问题。
-
Construction of the power transmission network is part of a 500 million U.S.
这个电力传输网络只是一份价值500,000,000,000美元的电力供应合同的一部分。
-
The company is the electric member unit of enterprises federation of China; Member unit of construction technology branch of special committee of power transmission and transformation of Chinese Electrical Engineering Society; National vltrahigh voltage give switchyard construction technical information unit and national power system , net explorer of network , to transmit power professional operation job unit , net explorer of network .
公司为中国电力企业联合会会员单位;中国电机工程学会输变电专委会施工技术分会会员单位;全国超高压送变电施工技术信息网网员单位及全国电力系统送电专业运行工作网网员单位。
-
The paper analyses the application mode development and demand of electric power communication transmission network ,and introduces ECI BG-40 which inosculates MSTP and PCM,and discusses a new type of application mode of electric power communication transmission layer network,which inosculates MSTP and PCM and offers reference for construction of el.
文章在分析了电力通信传输网应用模式发展及需求的基础上,对ECI公司最新推出的集MSTP+PCM功能于一体的BG-40产品进行了介绍,探讨电力通信传输网一种新型的网络应用模式,这种PCM+SDH的网络融合的组网新模式,将为电力通信网传输层网络的组网提供很好的参考。
-
Digital simulation for the integrated imformation transmission network of a certain power company is performed, the QoS under three configuration schemes, i.e., without QoS configuraiton, with simple differnece service configuraiton and with MPLS network configuration, are compared. Comparison resutls show that the configuration scheme of MPLS network can implement the load balance among link circuits and possesses fault self-recovery mechanism, so the failure elements can be quickly detected and the switching over of data flow among label switched paths can be realized. The fault recovery time is within miliseconds, therefore the QoS of power system realtime information can be ensured effectively and the QoS of various non-realtime information can be considered as well.
对某电力公司信息综合传输网络进行了数字仿真,比较了无服务质量配置、单纯差分服务配置和MPLS网络配置3种方案下的服务质量,结果表明:MPLS网络配置方案能够实现链路间的负载均衡,具有自愈性故障恢复机制,可以快速检测到失效元件并在多条标签交换路径之间实现数据流量的切换,故障恢复时间在毫秒级,可以有效保证电力系统实时信息的服务质量,并可同时兼顾各种非实时信息的服务质量。
-
The optimization of power network planning and the selectees of the power transmission lines in all of the possible load conditions obtained from this method. Then according to the probability of the condition, the distribution network planning conclusion with good adaptability and reliability requirement is put forward.
采用多情景方法求得未来多种可能负荷情景下的电网最优规划方案,得到各待选线路在各情景下的被选情况,并根据各种情景可能出现的概率,提出依据电网可靠性要求和线路被选概率的大小选择各条待选线路,形成具有较好适应性的电网灵活规划方案。
-
In 1992, a three phase double circuit line between Goudey and Oakdale station was reconstructed to six-phase line and was operated commercially by New York state electric and gas. It is a milestone from theoretical research to practical application in the development of six-phase transmission.With the decrease of cultivated land and the environmental problem in china, it is an important factor to improve power transmission density in the construction of electric network, and the predominance of six-phase transmission is obvious in this aspect.
六相输电是多相输电的一种,在国外六相输电技术作为提高输电线路功率传输密度,节约线路走廊空间的重要手段得到了充分的重视,对六相输电技术的研究也取得了很大的进展。1992年,美国纽约电力和天然气公司将Goudey到Oakdale之间的一条双回线路改造成了六相输电线,并且已经投入了商业运行,这标志着多相输电技术已经从理论研究向实际应用迈出了重要的一步。
-
50 The present relates to a wind turbine comprising a drive train with a wind rotor connected to a generator rotor through a gear box and having bearings for journalling rotating parts of the drive train, said generator being adapted to be connected to an electric power transmission network.
我的翻译为:本发明涉及风力涡轮机,该风力涡轮机包括传动系统和轴承,该传动系统具有通过齿轮箱连接到发电机转子的风轮且该轴承具有用于支承该传动系统的旋转部件,所述发电机被调适以连接到输电网络。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。