查询词典 power station
- 与 power station 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The effect of the friction moment of bearings on performance is researched. The forming mechanic and influence factors of the friction moment of ball bearing are analyzed. Suitable clearness and groove radius of ball bearings are obtained by experiment and calculation. The relationship between starting moment of ball bearing and various lubricants is analyzed. The measure for reducing the starting moment of ball bearing is put forward, it is the theory basis and reference for ball bearing design of small power unit system.The system is an unstable system when the 24-station ball pen tip production machine is running because of various interferences. It is too hard to describe the system by linear method, so the nonlinear formulation must be used.
研究了小动力头系统轴承摩擦力矩对运转性能的影响,分析了球轴承摩擦力矩的产生机理及影响因素,采用实验和计算的方法得到了动力头球轴承的合理间隙及球轴承沟曲率半径,分析了各种润滑剂与球轴承启动力矩的关系,并提出了减小轴承启动力矩的措施,为小动力头系统的轴承设计提供了理论依据及实践参考。24工位笔头加工机械在笔头的生产加工过程中,由于受到各种因素的干扰是一个不稳定系统,其稳定性会发生一定变化,而且很难用线性方法表述。
-
The economy of the power plant mainly is decided by thermal efficiency of the electricity station boilers .
摘要火力发电厂的经济性主要取决于电站锅炉的热效率。
-
Since the voltage not only has relationship with both the reactive power and the balance of reactive load, but also relies on the structure of network and capability of voltage regulation, the system takes all the factors above into consideration and adopts the methods as follows: realizing grading control and management according to the voltage level and region partition, realizing jointly regulation and information pool by the application of advanced software in local and central station, realizing the optimal control of reactive voltage based on the measurement data from the regulative automation system and the angle of the whole system, realizing the exact application of reactive compensator and the on-load tap appropriate changer for voltage regulation transformers , and realizing the balance of reactive voltage in local site.
随着调度自动化系统的日益普及,以及越来越多的电网中的有载调压分接开关和电容器补偿装置投入使用,本课题研究开发基于分级递阶的地调/中心站模式无功电压控制系统,由于电压既与无功功率和无功负荷平衡有关,又与电网结构、调压能力有关,所以系统考虑电压等级、按区域实施分级控制、分级管理,利用中心站和地调的电力系统高级应用软件的作用实现众多装置的联合调整,信息共享。
-
The zone has been covered by Chinese telecom, China mobile, China unicom, CNC etc. comprehensively, where there are running water factory with daily supply 60,000 tons; one 220KV transformer substation, two 110KV transformer substations implementing the two-circuit power supply for daily supply 150,000 kilowatts, one gas pressure reducing station implementing two gas sources feeding with daily supply 300,000 cubic meters.
中国电信、移动、联通、网通等已全面覆盖高新区;区内有自来水厂,日供水能力达到6万吨;区内有220KV 变电站一座、110KV 变电站二座,实行双回路供电,日供电能力15万千瓦;区内有天然气减压站一座,实行双气源供气,日供气能力30万立方米。
-
The zone has been comprehensively covered by Chinese telecom, China mobile, China unicom, CNC etc., where there are running water factory with daily supply 60,000 tons; one 220KV transformer substation, two 110KV transformer substations implementing the two-circuit power supply for daily supply 150,000 kilowatts, one gas pressure reducing station implementing two gas sources feeding with daily supply 300,000 cubic meters.
中国电信、移动、联通、网通等已全面覆盖高新区;区内有自来水厂,日供水能力达到6万吨;区内有220KV 变电站一座、110KV 变电站二座,实行双回路供电,日供电能力15万千瓦;区内有天然气减压站一座,实行双气源供气,日供气能力30万立方米。
-
Guangxi Yantan turbine diameter 8m 90s in the 20th century in operation, mainly due to the hydraulic design and manufacturing quality Runner and other reasons, put into operation a serious vibration, cracks, vibration tube into the door crack, power generation Floor Vibration machine layer. 10 years of annual repair cracks, cavitation, multiple blade line has been restored can not be guaranteed, for the more radical change in this situation, has on one desktop PC upgrades, replacement of the old wheel, replaced by a Taiwan new designs, new technology a new wheel, troubled years of generating station floor floor vibration problems are basically solved.
广西岩滩水电站直径达8m的水轮机在20世纪90年代投入运行,主要是由于水力设计和分瓣转轮制造质量等原因,投入运行后振动严重,裂纹产生,尾水管进入门振裂,发电机层楼板振动。10年来年年修补裂纹、空蚀、多次修复后叶片型线已无法保证,为较彻底的改变这种状况,已对其中一台机进行升级改造,更换了老转轮,代之以一台新设计、采用新工艺的新转轮,困扰电站多年的发电机层楼板振动问题得到基本解决。
-
As each base station uses lower transmitting power, the same frequency can be used in each different cell.
由于基站可用较低发射功率,因而相同的频道可在不同的小区内重复使用。
-
Includes all hardware, weather station,cables, optical isolator, Remote Trigger, Tspliter, RPM sensor, Inductive clipon pickup, pressure transducer, 8 thermocouples (1 pictured), thermocouple extensions, Fluid thermocouple, power adapter, CD, Instruction Book, dual Wideband, 3000lb Strain Guage (installed at torque arm in chassis dyno).
包括所有硬件,气象站,电缆,光隔离器,遥控触发, tspliter , rpm的感应器,感应clipon皮卡,压力传感器, 8热电偶( 1图案),热电偶扩展,流体热电偶,电源适配器,光盘,教学图书,双宽带, 3000磅应变计。
-
Figure 5 Schematic diagram of spinning machine In terms of hydraulic transmission, hydraulic station and a hydraulic system, which serves as the machine tool spindle power than all.
在液压传动方面,有一个液压站及其液压系统,它为机床提供除主轴旋转之外的所有动力。
-
Therefore,this kind of interconnection uses in the transportation amount being small generally,the stock road is short and rail switch number few non-power equipment's station.
因此,这种联锁一般用于运量小、股道短和道岔数少的无电源设备的车站。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。