英语人>网络例句>power off 相关的网络例句
power off相关的网络例句

查询词典 power off

与 power off 相关的网络例句 [注:此内容来源于网络,仅供参考]

As the track space increasing, the holding power which flexible holding parts act on sugarcane is dropping off. As the canvas layers and length of flexible holding part increasing, the track space is also increased when flexible holding parts act on sugarcane same holding power. As the length of flexible holding part increasing, the rate of slope of holding power following the track space to change would be decreased, so holding power would vary slowly. The holding power has a better linear relationship with the track space. Holding sugarcane stalk on knot or not on knot, sugarcane stalk having leaves or without leaves, the holding power would have not significant difference. Considering the structure of device and stress of sugarcane, 4-layers canvas conveyer belt was used as flexible holding part, while its length is 120mm, 160mm, or 200mm, the corresponding maximum track space is 135mm, 183mm, or 235mm. Experimental investigation of sugarcane windrowing was done on the arc-track-type flexible holding and conveying test mechanism.

随着轨道间距的增大,柔性夹持元件施加给甘蔗的夹持力逐渐减少;施加给甘蔗相同的夹持力,随着柔性夹持元件帆布帘层数和长度的增加,对应的轨道间距增加;随着柔性夹持元件长度的增大,柔性夹持元件施加给甘蔗的夹持力随轨道间距变化的斜率减小,夹持力大小的变化越缓慢;柔性夹持元件提供的夹持力与轨道间距均呈线性关系;柔性夹持元件夹在甘蔗节上还是不夹在节上,甘蔗有叶还是无叶,其施加给甘蔗的夹持力无显著差异;从夹持输送装置结构以及甘蔗的受力情况来考虑,选择4层帆布帘输送带作为柔性夹持元件更能平稳、柔和地夹持输送甘蔗,4层帆布帘120mm、160mm、200mm长的柔性夹持元件夹持甘蔗所需最大轨道间距为135mm 、183mm、235mm。

Can be seen, no overload is the essence of the centrifugal pump, pump shaft power curve peak, or shaft power with the increase of flow rate changes are small, relatively flat power curve that axis, so that the pump shaft power in the dead lift off to zero head (that is, from zero flow to maximum flow rate) are less than equal to the original context of the supporting motive power.

可见,无过载离心泵的实质是指,泵的轴功率曲线有峰值或轴功率随流量的增加而有较小的变化,即轴功率曲线比较平坦,使泵的轴功率在关死扬程到零扬程范围内都小于等于原动机的配套功率。

Direct Correspondence of Display Data RAM to LCD Pixel Display Data RAM2,500 bits LCD Drivers25-common and 100-segment Selectable Duty and Bias Ratio ; 1/25 Duty 1/6 Bias or 1/15 Duty 1/5 Bias Direct connection to 8-bit Microprocessor interface for both of 68 and 80 type MPU Serial Interface (SI, SCL, A0, CS) Useful instruction set Display ON/OFF, Display Start Line Set, Page Address Set, Column Address Set, Status Read, Write Display Data, Read Display Data, Normal or Inverse ON/OFF Set, Static Drive ON/Normal Display, EVR Register Set, Read Modify Write, End, Reset, Internal Power Supply ON/OFF, Driver Output ON/OFF, Power Save and ADC select.

直接显示数据RAM的对应像素液晶显示数据RAM2,500位液晶Drivers25,共同和100段可选择的职务和偏差率; 1 / 25的责任1 / 6的偏见或1 / 15的责任1 / 5偏见的直接连接至8位微处理器的接口为68和80型微控制器的串行接口(司,沙田至中环线时,A0,CS)的相关指令集显示开/关,显示开始行设置,页面地址设置,列地址设置,状态读取,写入显示数据,读取数据显示,正常或逆开/关设置,静态驱动器/正常显示,腔内注册设置,读取修改写入,完,复位,内部电源开/关,开/关,节能和ADC选择驱动器输出。

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

Secondly, based on the function analysis of EV test bench, using the modular design idea, this dissertation compartmentalizes the functional module of EV test bench, and analyzes the essentially comprising of the modules such as driving module, power take off module, inertia simulation module, load simulation module, main control module and power supply module. Especially introduces selection principles of driving motor of power take off module.

其次,在对电动汽车试验台功能进行分析的基础上,采用模块化设计的思想对电动汽车试验台的功能模块进行了划分,并就驾驶引导模块、动力输出模块、惯量模拟模块、负载加载模块、试验台主控模块和电源模块的基本组成进行了深入分析,并在动力输出模块部分着重介绍了驱动电机的选择原则。

Button D is the power and timing key : When plug in the power, the green light on and the machine will be in standby mode, press one time is on and default timing as an hour, and press twice up to two hours, the third time is three hours, followed by cycle, If you want to turn it off,just long press it and last for 2 seconds,the machine is shut down and the returned to the standby mode,if you want to stop here just power take off.

此键为开机和定时键:插上电源按键底有绿色灯光,此时为待机状态,按一次此键为开机,主机默认定时1小时,再第二次定时2小时,按第三次定时3小时,依次循环,长按2秒为关机,整机又返回待机状态。

The gun was a good time, after sitting a little bigger, a powerful and easy operation, suitable for all kinds of maps environment M16:The gun power, after sitting a little high, and be convenient operation, but more is still poor and m4a1 some ; AK-47:The gun after sitting too large, the most powerful, it is difficult to operate, but to all kinds of maps of the environment is a very good of the gun ; AK-74:Power of the gun, fire is quickly, then take a great improvement of the 74 than 47 more easy to operate FAMAS:The power of a gun, fire, take off after a person closer to the king G36K:The power of a gun, fire is quickly, then sat a small operation is very easy overhand SG552:The gun power, and sat down and large, but the fire, is a good fast screen, sniper rifles AUG:The gun power, after sitting a little fire, and is sure of the higher is the world famous one of the sniper rifle ; AWM:The gun after a powerful, by too big, fast and slow to be very high, who is a widespread use of the sniper rifle ; M700:The gun power larger and smaller, a relatively rapid speed and must have very high, use less M60:The gun power, and sat down and large, the fire, is not high, is a suppressed fire MP5:The gun after power, by a fire made, and must have a high, is a very good lead to a submachine gun ; MP7:The gun after power, and sat down, fire is quickly, he is too poor to cooperate with the team to use

此枪精准高,后坐较小,威力较大,容易操作,适合各种地图环境使用; M16:此枪威力较大,后坐较小,精准较高,方便操作,但是和M4A1比较还是差了点; AK-47:此枪后坐太大,威力更大,难以操作,但是适应各种地图环境是一把十分不错的高杀伤力枪; AK-74:此枪威力较大,射速较快,后坐比较大,改进后的74比47更容易操作; FAMAS:此枪威力较小,射速飞快,后坐较大,人称近距离步枪之王; G36K:此枪威力较小,射速较快,后坐很小,操作非常方便容易上手; SG552:此枪威力较大,后坐也大,但是射速很,是一把不错的快掩护型狙击步枪; AUG:此枪威力较大,后坐较小,射速一般,精准较高,是世界有名的狙击步枪之一; AWM:此枪威力巨大,后坐太大,射速较慢,精准很高,谁一把广泛使用的狙击步枪; M700:此枪威力较大,后作较小,射速较快,精准很高,一般使用人少; M60:此枪威力较大,后坐也大,射速一般,精准不高,是一把压制火力的重机枪 MP5:此枪威力一般,后坐较小,射速飞快,精准较高,是一把非常不错的冲锋与反冲锋枪; MP7:此枪威力一般,后坐较大,射速极快,精准太差,主要适合团队配合才可以使用

Basing on TI Corporation's DSP chips TMS320LF2407A as high-voltage protection system CPU in this article, AC analog which comes from high voltage power grid is converted to digital value which DSP can process by 14-bit A/D converter MAX125, monitoring the entire status of the high-voltage power grid in real-time, tripping off by controlling external relay quickly when abnormal operation happened, turn off the power grid to protect the power grid and other electrical equipment.

本文是基于TI公司的TMS320LF2407A型DSP芯片作为高压电继电保护系统的中央处理器。通过MAX125的14位A/D转换器采集高压电网中交流模拟量来转换为供DSP处理的数字量,从而进行数据分析处理,对整个高压电网的运行状况进行实时监控,当遇到不良运转时控制外部继电器迅速跳闸,切断电网,从而保护整个电网及其他用电设备。

Basing on TI Corporation's DSP chips TMS320LF2407A as high-voltage protection system CPU in this article, AC analog which comes from high voltage power grid is converted to digital value which DSP can process by 14-bit A/D converter MAX125, monitoring the entire status of the high-voltage power grid in real-time, tripping off by controlling external relay quickly when abnormal operation happened, turn off the power grid to protect the power grid and other electrical equipment.

本文是基于TI公司的TMS320LF2407A型DSP芯片作为高压电继电保护系统的中央处理器。

In order to reduce the production process mill system power supply system of the impact of power quality,improve the stability of equipment to meet national standards and power quality of the electricity sector of the target requirements,in the rolling mill factory production lines to install a set of 30kv side bus SVC.It restrained the molestations of power plants lines,make important roles of improve power quality,improve power factor,and level off the run level of electric web.

为了减轻轧机系统生产过程中非线性冲击负荷对供电系统电能质量的影响,提高设备运行的稳定性,满足国家标准和电力部门对电能质量指标的要求,在生产线30kV母线侧,装设了一套静止无功补偿装置,结果是把生产线对供电系统电能质量的干扰抑制到一个较低水平,对改善供电系统的电能质量,提高功率因数,稳定电网运行水平起到了极其重要的作用。

第6/53页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Keep Your Hands Off My Power Supply
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。