英语人>网络例句>plant out 相关的网络例句
plant out相关的网络例句

查询词典 plant out

与 plant out 相关的网络例句 [注:此内容来源于网络,仅供参考]

In recent years, I plant at home and abroad to introduce a similar product of advanced production technology, seriously listen to views of users, after digestion and absorption, the current domestic slaughter carried out a series of equipment upgrades.

近年来,我厂引进了国内外同类产品的先进生产技术,认真听取用户意见,经过消化吸收后,对目前国内屠宰设备进行了一系列升级改造。

The axillary bud on young shoot of Barbados nut was used as explants,adding different concentration of plant hormone combinations(6-BA and IBA) on minimal medium,to carry out buds inducing and multiplication culture.

以麻疯树幼嫩枝条腋芽为外植体,以M S为基本培养基,附加不同浓度的激素组合(6 BA与IBA)进行芽诱导和增殖培养。

In 1885, a block of coal was broken open to find a metal cube obviously worked by intelligent hands. In 1912, employees at an electric plant broke apart a large chunk of coal out of which fell an iron pot!

1885年,人们炸开一大块煤来寻找智能人锻造的金属管。1912年,发电厂的工人断开了一大块煤,竟然从里面掉出一块铁坩埚!

This plant can also dry out between waterings, but you don't want it to be so bone-dry that it's separating from the sides of its container.

不常浇水会干透,但是你不会想让他干到从盆子的边缘干裂开来。

Mr. Boucher was battling clouds, timing the operations of his power plant to get the most out of patchy sunshine.

鲍切尔正和乌云作着斗争,为充分利用那一缕缕的阳光,他不断调节着电厂的运行时间。这项技术将会有极大的需求。

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .

如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

If these varied or additional tests show that the tested Plant, Materials or workmanship is not in accordance with the Contract, the cost of carrying out this Variation shall be borne by the Contractor, notwithstanding other provisions of the Contract.

如果这些变更或附加的试验表明,经过试验的生产设备,材料,或工艺不符合合同的要求,不管合同有何其他规定,承包商应负担进行本项变更的费用。

第28/39页 首页 < ... 24 25 26 27 28 29 30 31 32 ... > 尾页
推荐网络例句

The concept of equivalent rotationally rigidity is offered and the formula of rotationally rigidity is obtained.

主要做了如下几个方面的工作:对伸臂位于顶部的单层框架—筒体模型进行分析,提出了等效转动约束的概念和转动约束刚度的表达式。

Male cats normally do not need aftercare with the exception of the night after the anesthetic.

男猫通常不需要善后除了晚上的麻醉。

Its advantage is that it can be used in smaller units.

其优点在于可以在较小的单位中应用。