英语人>网络例句>plan 相关的网络例句
plan相关的网络例句
与 plan 相关的网络例句 [注:此内容来源于网络,仅供参考]

This dissertation is addressed on the problem of enterprise procurement plan with outsourcing in global business environment. And the research outspreads with Model Building, Algorithm Design and Algorithm Evaluation.The main work and results is shown as follows.Firstly, the actual research background and motivation about such a topic is outlined and more comprehensive and in-depth survey on the research progress of procurement plan is made. It is indicated that integration procurement plan in supply chain level is the research trend in future.

本文研究了全球商务环境下的带转包企业采购计划问题,遵循建立模型、设计算法和评估算法流程开展研究,主要工作及成果如下:(1)概述了问题的实际研究背景与动机,较全面深入地综述了采购计划问题的研究进展,指出面向供应链的集成采购计划是未来的发展趋势。

Face this kind of situation, the author thinks not to answer to the control that funds overspends from production very busy season just begins, and should be when plan of funds of year of make known to lower levels of management department of superior of the beginning of the year, build a rigorous plan management and budgetary management system, combine the characteristic of highway conserve branch, act on the principle of keep expenditures within the limits of income, making overall plans and take all factors into consideration, year funds the plan presses different content, with the work out estimated method, below the analysis, premise that forecast, undertake index is decomposed, layer upon layer fulfil, fore-and-aft decompose team and group, each accessary production unit, transverse fulfil each room, departmental door, implement pyramid form manage by different levels, make every every branch, worker has index, responsible, form fore-and-aft after all, transverse control a network to stagger of edge, freely.

面对这种局面,笔者认为对经费超支的控制不应从生产大忙季节才开始,而应在年初上级治理部门下达年度经费计划时,就建立起一套严格的计划治理和预算治理制度,结合公路养护部门的特点,本着量入为出、统筹兼顾的原则,将年度经费计划按不同内容,用编制预算的方法,在分析、猜测的前提下,进行指标分解、层层落实,纵向分解到班组、各附属生产单位,横向落实到各股室、各部门,实行金字塔形的分级治理,使每个部门、每个职工都有指标、有责任,形成一个纵向到底、横向到边、纵横交错的控制网络。

Risk management can be divided into five parts, these five parts are respectively: The risk of turning uncertainty into essential task that the risk is stated discerns the course, the risk changing into being arranged in the order of PRI tabulates the risk analysis course of the necessary task to state the risk, will tabulate and change the definition risk of the task needed in order to tackle the plan in risk to plan the course according to the risk that PRI will be arranged , monitor the risk state and give notice to start the risk and tackle the risk that take action and follow the course, with carry out the action plan of the risk, the risk in order to drop the risk to the task that the acceptable degree needs to finish deals with the course.

风险管理可被划分为五个部分,这五个部分分别是:将不确定性转化为风险陈述的必要任务的风险识别过程,将风险陈述转变为按优先级顺序排列的风险列表所需的任务的风险分析过程,将按优先级排列的风险列表转变为风险应对计划所需要的任务的定义风险计划过程,监视风险状态以及发出通知启动风险应对行动的风险跟踪过程,和执行风险行动计划,以求将风险降至可接受程度所需完成的任务的风险应对过程。

The main clue is the normal design process of the regulatory plan. This paper analyzes the plan and development of domestic and overseas high-tech parks and then theorizes a design framework for regulatory plan of high-tech parks in china.

本文以控制性规划设计的一般流程为主线,通过对国内外高技术产业园区规划实践的分析,最终建立了一个关于我国高技术产业园区的控制性规划设计框架。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

As we have learned main component is system of fee of Internet bar plan software plan cost, hardware plan cost.

据了解网吧计费系统主要分为软件计费、硬件计费。

Responsibilities:Allocate the available resources in terms of workforce, materials and production equipment to fulfill daily production plan as per business requirements for Dye House Ensure on time delivery and continuous improvement for Dyeing order processing and shorten order lead timeMonitor Dyeing operations and implement action plan to achieve a time-bound labor productivity target Implement quality plan in association with quality department and ensure color quality Lead dyeing workforce to control dyeing production cost in terms of water consumption, electricity consumption, dyed chain/tape wastage generation Establish a safe, healthy and environment-protected working environment to ensure zero industry injury in Dyeing area Assist setting annual manufacturing budget for Dyeing section Monitor people performance and provide training to production supervisors and workers to develop and retain a competent and motivated production workforce

职责:分配现有的在劳动力,材料和生产设备等资源以满足每日的生产计划,实现染厂的业务需求。确保准时交货,不断加快染色订单处理过程,缩短订单准备时间。监控染色过程,实施计划以在有限的时间内完成生产目标。和质量部门实施质量保证计划,确保染色质量。带领染色车间工人减少水,电,生产线等方面的浪费,以控制生产成本。建立一个安全,健康和环保的工作环境,以确保印染环节零工伤。协助制定印染环节年度生产预算。监控员工绩效,为生产管理人员和工人提供培训,以培养,激励,保留合格的生产工人。

Initially NALCO had envisaged to spend Rs 3623 crores for its second phase expansion plan during the 10th Plan, which will now spill over into 11th Plan owing to cost escalation following delay in Government approval, he said.

起初,国家铝业公司计划在第10个五年计划的二期扩张计划投资362.3亿卢比,现在因政府延迟了批准时间该项目也将移至第11个五年发展计划中。

Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.

通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。

第6/500页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Wake Up Call (One More Time)
The God Song
Plan B
Sleeping In
Backfired
Backup Plan
Let's Plan A Robbery
The New Workout Plan
The New Workout Plan (Remix)
Back Up Plan
推荐网络例句

More direct, directer ; most direct, directest

径直的,笔直的

Do you know how to use a chain saw?

你知道如何使用链锯吗?

This is close to the cost of the purchase price.

这样的收购价已接近成本。