英语人>网络例句>plan 相关的网络例句
plan相关的网络例句
与 plan 相关的网络例句 [注:此内容来源于网络,仅供参考]

Initial plan error is compounded by carelessness in carrying the plan out.

计划原来就有错误,再加上执行中的粗心大意使得计划错上加错。

Initial plan error is compounded by carelessness in carry the plan out.

计划原来就有错误,再加上执行中的粗心大意使得计划错上加错。

Comparisons reveal that: plan of GSM Modem is fit for circumstances of low communicating frequency , insensitiveness of data delay and low cost; plan of GPRS DTU adapts to occasions of high communicating frequency, low delay, large data flow and restrict requirement of security.

比较的结果表明,GSM Modem方式适合于通讯频率小,数据延迟不敏感,费用低的场合;GPRS DTU方式适合于通讯频率大,数据延迟小,数据量大,安全性要求高的场合。

When instate receives a new project, work flow will be outspreaded like this: first of all, carry on the possibility research; then sign oral or formal contract with clients and also create project; make all level plan based on project and correlative subprojects, and arrange staffs of each department to join the design; and then the process of blueprint design according to the task points in plan; finally is the pigeonholing of blueprint.

当设计院接收一个新的项目后,将按照以下的工作流程展开:首先进行可行性研究;然后和客户方面签订口头订单或正式合同并立项;根据项目及其相关子项制定各级计划(院级计划及其相应的部级二次计划),安排各个专业的人员参与设计;随后是按照计划中的任务节点展开的图纸设计过程;最后是设计图纸的归档。

Should an interim agreement notified under paragraph 7 of Article XXIV not include a plan and schedule, contrary to paragraph 5 of Article XXIV, the working party shall in its report recommend such a plan and schedule

如根据第24条第7款项进行通知的一临时协定未包括计划和时间表,而违背了第24条第5款项的规定,则工作组应在其报告中建议此类计划和时间表。

Should an interim agreement notified under paragraph 7 of Article XXIV not include a plan and schedule, contrary to paragraph 5 of Article XXIV, the working party shall in its report recommend such a plan and schedule.

如一成员认为,按照第1款自己具有主要供应利益,则它应将其要求连同支持证据一起书面告知提议修改或撤销减让的成员,同时通知秘书处。

Based on the research, founded on existing production conditions, production capability and technical natures of KISC, especially its own development requirements, linked with the development trend of the iron and steel industry, fully considering the continuity of equipment upgrade and technical optimization of KISC, guided under principles of validity and benefit, the writer analyses and argues that in current conditions. KISC shall not adopt the hot metal pretreatment of desiliconization, dephosphorization and desulphurization, but the end-point converter process to improve the dephosphorization effect. But according to the development plan of KISC, with its scale development, upgradeof equipment and technical conditions and implementation of a plan to use high-phosphorus ironstone, its more suitable to adopt the converter-shaped pretreatment of desiliconization, dephosphorization and desulphurization.

在此研究基础上,立足昆钢当前生产条件、生产能力和工艺特点,特别是昆钢自身发展需要,结合钢铁工业发展趋势,充分考虑昆钢现行装备改造和工艺优化的延续性,以有效性和经济性原则为指导,分析讨论了在昆钢当前条件下,不适宜采用铁水"三脱"预处理工艺,而宜考虑采用转炉复吹技术以达到改善转炉吹炼过程脱磷效果的目的;而根据昆钢的发展规划,随着昆钢的规模化发展,生产装备及工艺条件的更新改善及利用高磷铁矿计划的实施,则适宜采用转炉型"三脱"预处理技术。

Pension, Profit Sharing, Keogh or 401K Plan Provide complete copy of plan

养老金,利润分配,Keogh 或 401K 计划提供完整的规划复本

The structural design is carries on the design calculation after the plan comparison and appraisal recommendation plan, this stage design primary mission is: The design material analysis and the structure arrangement, the king post endogenic force computation, the pre-stressed steel ties the estimate and the arrangement, the computation king post section geometry characteristic, the steel tie the loss of prestress computation, the king post section intensity checking calculation, the king post nose partial bearing strength checking calculation, the king post distortion checking calculation and part compositions and so on lane board computation.

结构设计是根据方案评比后的推荐方案进行设计计算,这一阶段的设计主要任务是:设计资料分析及构造布置、主梁内力计算、预应力钢束的估算及其布置、计算主梁截面几何特性、钢束预应力损失计算、主梁截面强度验算、主梁端部的局部承压强度验算、主梁变形验算和行车道板计算等部分组成。

On the basis of stability analysis, the author takes the K27+825 slope from the type of slope which has lest stability as an example. According to its basic feature, the design ueses the choosed best reinforce and control scheme: lattice beam, anchor wire, grouting and abstraction of water. In the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control.

在稳定性分析的基础上,以边坡稳定性最差的一类中的K27+825边坡为例,结合其自身的特点,用优选出的加固防治方案:框架梁+锚索斗灌浆+排水进行设计,设计中既考虑总体防治方案的合理优化,又充分考虑了加固工程的具体布置时是否存在不稳定体从锚索或框架梁的薄弱部位剪出的可能性等一些细部措施,以达到合理设计,有效及经济治理的目的。

第18/100页 首页 < ... 14 15 16 17 18 19 20 21 22 ... > 尾页
相关中文对照歌词
Plan B
Backup Plan
According To Plan
Not My Plan
Plan Went Sour
Back Up Plan
The Marshall Plan
Make A Plan To Love Me
Get Naked (I Got A Plan)
The Plan
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。