查询词典 pipeline
- 与 pipeline 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The system of fueling pipeline ,in particular, the branch form pipeline system with pump deliver,one side, the form of pipeline is multiplicity,on the other hand, the working state is changefully,so,the working state of the system must be adjusted and controled, the paper contraposes the system, investigating the method of adjusting and control,introducing several pressuered-control valv
注油管路系统,特别是多分支的泵送管路系统,一方面管路结构形式多样,另一方面工作状态多变,因此,在系统工作中均需对工况进行调节与控制。
-
Muhlbauer model is a systemic pipeline risk analysis method, but it has a deficiency that the four hazard index categories contributing to pipeline failures are equally assigned 100 scores and can not reflect their different importances for pipeline risk.
穆氏模型是一种系统化风险评估方法,但它把导致管道失效的4大类因素都同样赋予100分,因而不能反映不同类型因素对管道风险的不同作用。
-
In the project of Dongfang-Yangpu-Haikou Long Distance Transportation Pipeline Crossing through Changhua River, the construction technique of launch way with slide boards is utilized, that is, the pulley block fixed on opposite bank tows the pipeline directly. The pulley block of a 32t low speed windlass successfully towed the integral pipeline section through the river.
在海南东方-洋浦-海口输气管道工程的昌化江穿越施工中,采用了发送道滑板施工技术:滑轮组过江直接牵引管道,32t慢速卷扬机牵引滑轮组将管道整体牵引过江,牵引穿越一次成功。
-
The thermal regime of soils along the pipeline route will be severely disturbed due to the heat exchange between the oil flowing in the pipeline and the ambient soils. Therefore, the oil pipeline will suffer from the frost heaving and thaw settlement.
原油输运过程中由于管道与周围土体之间发生的热交换,使得原有土层中的热交换机制被打破,冻土区常温原油管道工程基础将面临融沉和冻胀灾害的双重挑战。
-
This model can estimate the size of the affected area in the event of a full-bore rupture by the diameter, the operating pressure and the length of pipeline Hazard area is directly proportional to the operating pressure raised to a half power, and to the pipeline diameter raised to five-fourths power, but inversely proportional to the pipeline length raised to a quarter power.
应用该模型可以通过管道直径、工作压力和管道长度计算出全口径断裂事故的影响范围。危险影响区域与工作压力的平方根成正比,与管道直径的5/4次幂成正比,与管道长度的1/4次幂成反比。
-
The main causes of the vibration in pipeline system are in two respects : The first is the vibrant force of the medium acted on pipeline system,i.e.exciting signal,such as the vibrant force caused by the gas flow at the compressor ′ s inlet and outlet and at the ramified and nodel points as well as the action of pig passing through pipeline bridge,etc.;The second is the response to the exciting signal,which is relating to the characteristics of the pipeline system,i.e.the rigidity,support,quality and equipments of the system besides the waveform of the exciting signal.
管道系统振动的原因主要有两方面,一是介质对管道系统产生的振动力,即激发信号,如气流在压缩机进、出口,分支节点部位产生的振动力,清管器通过管桥时对它的作用等;另一方面是对激发信号的响应,其响应除了和激发信号的波形有关外,还和管道系统本身的特征,即系统的刚度及支撑,质量及其配置等情况有关。
-
The main factors of affecting the stability of submarine pipeline are analyzed, and the result shows: effect of Wake has disadvantage for pipeline stability, weight of per length unit pipeline is a important factor affect the stability of pipeline.
根据所建模型对影响裸置管线横向稳定性的各项因素分析表明,忽略尾流的影响会严重高估裸置管线的在位稳定性,影响管线稳定性最主要的因素是单位长度管线重量。
-
The main products with the brand "LUTONG" include the PE pressure pipeline system (PE gas, water supply pipes and pipe fittings), PE tele communication pipeline system (PE silicon-core pipe, PE corrugated pipe, PE porose pipe, PE optical fiber pipe with silicon-core), PE electric cable pipeline system and PE water discharge pipeline system (PE large diameter corrugated pipe).
沧州明珠塑料股份有限公司是由河北东塑集团股份有限公司和钜鸿有限公司共同出资设立的中外合资股份制企业。2007年1月24日&沧州明珠&(股票代码:002108)在深圳证券交易所挂牌上市,公司现注册资本6875万元,占地1000余亩,主导产品为&陆通&牌塑料压力管道系统(PE燃气、给水管材、管件)、通讯管道系统(HDPE硅芯管、波纹管、梅花管、格栅管、子管、硅芯光纤微管)、排水管道系统。
-
Based on the experience from constructing the underground colligated pipeline information system in Quanzhou City, this paper describes the application of GeoPipe Pipeline information system in pipeline centralized management, and then discusses how to prevent and deal with some pipeline urgent accident.
本文结合泉州市地下综合管线信息系统建设的经验,探讨了GeoPipe管线信息系统在管线的统一管理中的应用,以及如何利用该系统预防和应对地下管线突发事故等基本问题。
-
During the pipe pushing construction of the parallel steel water pipeline of Beidu-Yanger pipeline project in Ningbo, the pushing force in main pushing power station appeared unusual increasing and the construction had to be interrupted. Through the analytical comparison between theoretical and practical pushing curves as well as the analytical comparison between the tool pipe track and the form map of pipeline resting in soil, it was found that the excessive pushing force in main pushing power station was caused by excessive deviation adjustment angle which enabled the pipeline to over bend in a short distance.
在宁波市北渡-雅戈尔原水D1800mm钢管复线工程顶管施工中,出现主顶动力站顶力异常增大的现象,影响继续顶进施工,文章针对这一情况进行分析研究,通过理论顶力曲线与实际顶力曲线以及工具管所经轨迹与管道在土层中静止时的形态图的分析比较,得出主顶动力站顶力过大是因为在纠偏过程中纠偏角度过大,使管道在短距离内过度弯曲引起的。
- 相关中文对照歌词
- Pipeline
- Alaskan Pipeline
- Pipeline / Kill Time
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。