英语人>网络例句>piling 相关的网络例句
piling相关的网络例句

查询词典 piling

与 piling 相关的网络例句 [注:此内容来源于网络,仅供参考]

And abrading plate?The "piling" is the broken fiber when abrade

" 聚积物"是否影响试样和磨擦板的接触?

Through the construction of the sea wharf bridge approach piling works of Shenneng Oil Depot Project in Qinzhou, the article expounds the basic sea piling construction procedure and techniques of bore-hole wall protection by steel pipe and hole-excavation by hand.

文章通过深能钦州码头油库工程海上码头引桥桩施工的工程实例,阐述钢护筒护壁人工挖孔在海上基桩施工的基本工序及施工工艺,证实钢护筒护壁人工挖孔施工工艺,在地层简单的浅海场地,是一种行之有效且无污染、机具简单、成本低、进度快的施工方

Free falling heavy rammer was used in former piling constructions, but the piling depth and pile pipe diameter were comparatively small.

在以往的施工中采用重锤下落打桩,打桩的深度和桩管的直径都比较小。

The cracking furnace piling of ethene facilities has been completed. 0.3 million/year LLDPE and 0.3 million/year HDPE piling, stake prefabricating, the construction within the plant and the preparation ofthe road construction within the plant and the preparation of drain and pipes are under construction.

乙烯装置的裂解炉打桩已完成。30万吨/年LLDPE装置和30万吨/年HDPE装置的打桩和桩预制以及厂区内道路的施工及雨排、地管施工的准备工作正在加紧进行。

This paper focuses on the construction process, method and steps of pile driving using vibrating hammer and piling catamaran, summarizes the construction effect of 500 m long test sea wall, puts forward effective measures of offshore piling in winter and autumn.

文章重点介绍了振动锤打桩船沉桩施工的工艺流程、施工方法及步骤,总结了500m试验段的施工效果,提出了秋冬季海上打桩的有效措施。

5 The Contractor shall be expected to supply, pitch, drive and subsequently remove trench sheeting or piling in accordance with other items of the Specification and the terms "timber" or timbering shall also apply to steel trench sheeting or steel sheet piling throughout.

承包商应该根据技术规程的其它项目要求提供、搬运、打入和拆卸槽板桩或桩。术语&木&或&木支护&应该同时也适合于钢槽桩或钢板桩。相信自己,挑战自我

5 The Contractor shall be expected to supply, pitch, drive and subsequently remove trench sheeting or piling in accordance with other items of the Specification and the terms "timber" or timbering shall also apply to steel trench sheeting or steel sheet piling throughout.

承包商应该根据技术规程的其它项目要求提供、搬运、打入和拆卸槽板桩或桩。术语&木&或&木支护&应该同时也适合于钢槽桩或钢板桩。

Because aluminum surface unlike composite aluminum foil paper and aucilisty paper, it has a certain amount of micro-small holes, moisture penetration into the paper can be, so it is important for moisture control; and aim at aluminum sheet piling up cannot be printed matter is exhausted, the card with a maximum of 3000, because aluminum is not wear-resistant surface, piling up too much will crush India face about note aluminized paper storage time should not be too long, it is best not more than two months, for a long time will be subdivisionof with the back of the paper, the following is issued on picking flowers; by the aluminum sheet business card printing and membership card making bearing in mind that when you heat curing temperatures not too high, too high a temperature can affect aluminum surface which flowers, and too hot paper antishrinking rise on deformation is too big to post processing.

因为真空镀铝纸的暗地不像不简单铝箔纸和PET纸,它有必定的微洪不小孔,水不合可以不合泌出纸,所以不差水不合的把持不一不合重给;③真空镀铝纸的印品堆放不克不及太众,卡纸最众不超功3000张,因为真空镀铝纸的暗地不耐磨,堆放太众会压伤印背;④夺纲真空镀铝纸的不领取工夫不给太不幼,最好不给超功两个日,因为工夫不幼了暗地会跟纸的背后粘连,变成纸背发不攒;⑤真空镀铝纸的制卡和会员卡制息给夺纲冷固化时温量不给太矮,温量矮了会感化真空镀铝纸的暗地,使其变不攒,而且太冷纸张缩涨变形太不小,不差后增工感化很不小。

Eastern city eastern machine stake work machinery plant is professional to design to make the piling machine of diesel oil and the type piling hammer of guide bar of diesel oil, stake machine product has DD1, DD2, DD4, DD6, DD12, DD18, DD25, DD32, DD40, DD53, DD63, DD73, DD83, DD93, DD108 and DD120 to wait for the series type piling hammer of guide bar of diesel oil, basis the requirement of customer design production the series that form a complete set with the machine hammer of piling machine go to pipe rack and step Lu frame , with caterpillar frame, as well as various series, speed speeds , electro-hydraulic press , only two letter hoists, include Q841 and C268K of the extensive application of the former Soviet Union Jiao vehicle and various series in hole vibration hammer.

东台市东机桩工机械厂专业设计制造柴油打桩机和导杆式柴油打桩锤,桩机产品有DD1、DD2、DD4、DD6、DD12、DD18、DD25、DD32、DD40、DD53、DD63、DD73、DD83、DD93、DD108、DD120等系列导杆式柴油打桩锤,根据客户的要求设计制造与打桩机机锤相配套的系列走管架、步履架、和履带架,以及各种系列、快慢速、电液压、单双简卷扬机,包括前苏联广泛应用的C268K、Q841铰车和各种系列的中孔振动锤等。

He fights shrewdly, hard, and secretly against the anarchy and self-dissolution which start up all the time within the herd, in which the most dangerously explosive stuff, resentment, is constantly piling and piling up.

照另一位小说家王朔的说法,孙甘露的&书面语最精粹,他就像是上帝按着他的手在写&,岂不就像中国以前民间流行的&扶乩&,书写者自己都不知道在写什么。

第1/21页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Sa Aking Piling
Lifetime Piling Up
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?