查询词典 piles and piles of
- 与 piles and piles of 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The paper introduces the concept、characteristic and construction machine of root piles ,also it introduces the technical process and quality control methods of root piles .
树根桩是一种应用较少的桩型,文章结合工程的应用,介绍树根桩的概念、特点及施工机械,以及树根桩的施工工艺、质量控制要点等。
-
The achievement that soil ultimate bear capacity heightened under pile caps due to barrier effect of piles gained from model test, and soil move around piles acquired from numerical simulation, its not only verified hypothesis of composite pile foundation nonlinear design theory, but have important reference value to the study of design theory and design method of composite pile foundation, which help to go deep into study of promote pile-soil-pile caps nonlinear interaction theory and composite pile foundation nonlinear design theory.
由模型试验得到的桩的遮拦作用对承台下土体极限承载力提高和数值模拟得到的土体绕桩流动等成果,不仅验证了
-
The difficult of narrow construction site is successfully solved after the design method and construction technology of support and water cut-off technique for the foundation pit with bored piles drilled in single-row deep-mixing piles of curtain for cutting off water are proposed in the narrow available site of the underground.
7在地下可用空间狭小的场地,提出了在单排深层搅拌桩止水帷幕中套打钻孔灌注桩基坑支护截水技术设计方法和施工工艺,成功地解决了施工场地狭小的困难。
-
Finally, with this modeling and calculating method, influencing factors such as rate of piles length and diameter, the depth of rock-socketed, intensity of soils around piles, intensity of rock, intensity of pile, flaccidity layers and the depth of sediment at the end of pile were studied in detail.
最后,以这一方法为基础,对影响嵌岩灌注桩承载性状的长径比、嵌岩深度、桩周土强度、基岩强度、桩体强度、软弱夹层、以及沉渣等因素进行了详细地研究。
-
By application of three—dimensional failure modes to excavation engineerings, designing methods of sheet pile with anchor slabs and I—steel piles with lining planks are proposed respectively; by combination energy safety factor with three—dimensional failure mode, the designing methods about retaining piles supporting pit slopes、pit slopes reinforced by anchor—nail compouding system and slurry trench excavation for construction of diaphragm also are given out.
本文把主、被动状态下土体的三维破坏模式应用于基坑支护工程中,分别提出了锚碇式板桩墙和工字钢桩衬板墙的设计方法;把主动状态下土体的三维破坏模式和能量安全系数法结合在一起,也分别提出了护坡桩支护基坑边坡、强锚弱钉加固基坑边坡和地下连续墙施工中的泥浆槽壁等的设计方法。
-
Based on Berezantzer s question for the ultimate bearing capacity of circular foundation and quoting from the theory answer for the ultimate resistance to the soil sliding around a pile,the theory formula of the ultimate bearing capacity increment of the soil under a strip cap with sparse piles due to the resist and strengthenning action of piles is deduced in this paper.
课题的基础上,引用滑动土体绕过桩时所遇到的极限阻滑力的理论解答,导出了复合桩基圆形承台下地基土极限承载力由于桩的遮拦加强作用而提高的理论公式,并给出相应的计算图表。
-
According to the fact that the penetrate mechanism of static sounding penetration and static jacking pile is similar, we obtained the predict formula of the static jacked resistance of the precast piles after comparing several engineerings, and can use it in the construction of the precast piles.
本文主要依据静力压桩与静力触探贯入相似的机理提出用静力触探指标预估压桩阻力的计算公式,并用杭州粉砂土地区的几个工程实例作分析和验证,为静压桩的设计和施工提供了理论依据。
-
The results show that manually excavated belled piles can increase the bearing capacity of single piles in the compact layer,and that the pile side friction resistance and the effect of the protection wall should not be ignored in the bearing capacity calculation.
试验结果表明:在坚实土层中选用扩底桩可有效提高单桩承载能力;桩侧摩阻力的作用不容忽视;承载力计算时应考虑护壁的厚度。
-
The paper presents some examples of constructing rock-embed filling piles in drill or punching holes and introduces some techniques of estimating the supporting courses of rock interfaces,controlling the inlaid depth and cleaning up bottom settlings in the construction of rock-embed filling piles.
通过钻孔嵌岩灌注桩工程施工的实例,介绍在施工过程中对持力层岩面判断与嵌入岩层深度的控制方法,以及清除孔底沉渣工艺流程,并分析嵌岩桩在施工过程中遇到质量问题应采取的技术措施。
-
The Broms method, m method and p-y curve method are respectively used to calculate the horizontal resistance coefficient of the filled earth behind the abutment back wall, the m method and p-y curve method are used to calculate the resistance coefficients of the earth around the abutment column and at the sides of the abutment and pier piles. The TDV software is used to simulate the restraint of the earth to the piles ends.
分别采用Broms法、m法及p-y曲线法计算桥台背墙后填土的水平抗力系数;采用m法及p-y曲线法计算台柱土的水平抗力系数和台桩、墩桩侧土的水平抗力系数;采用TDV软件模拟土对桩端的约束作用。
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。