查询词典 pile up
- 与 pile up 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
According to the experi ence of my long term career of geotech drilling and tunneling engineering technique work and manage ment, and the characteristics of plum blossom-type section borehole grouting pile construction technolo gy, and in accordance with 《Construction Foundation Pile Technique Standards》, and 《Standards for Grouting Pile Foundation Construction Technique》, the research work has set up the work process technique demands for the new piling making technalogy's bore-hole drilling, steel cage's making and placing, and concret grouting etc.
根据研究者多年从事岩土钻掘工程技术工作和管理工作的丰富经验,鉴于梅花断面钻孔灌注桩施工技术的特点,依据《建筑桩基技术规范》和《灌注桩基础技术规程》,提出了梅花断面钻孔桩施工技术的钻进成孔、钢筋笼制作与吊放、混凝土灌注等方面的具体操作技术要求。
-
The invention relates to a processing method of preventing frostbite and restarting of hydrogen electric pile, whose characteristic lies in the treating processes includes: When the electric pile turns off, the unsaturated fuel gas or the nitrogen, through the circle boast to clean the dissociate water; drying the MEA film module to keep the water content below the stipulated temperature which does not ice up; then the recycle gas through a wet exchanger to dry and the dried gas is continue used in the dry pile step; when restarting the electric pile, the recycle gas must heats then through the pile to elevate the temperature, then heats the fuel gas and the oxidant of the gas source, through the weting of the wet exchanger enters to the calefactive pile, enhances the wet step of the film module in the pile, starts the power output of the pile.
本发明涉及一种氢电堆的防冻和重新启动时的处理方法,其特征在于处理过程包括:电堆停机时,将水蒸气不饱和的燃料气体或氮气,通过循环吹扫除去电堆的游离水;干燥其中的MEA膜组件,使膜组件含水量降低到规定低温下不结冰的程度;而后再令循环气体通过一个湿交换机将循环气体干燥,以及被干燥后的循环气体继续用来干燥电堆的步骤;在电堆重新启动时,须将循环气体加热后通过电堆,使电堆升温,然后再将气源的燃料气及氧化剂加热,通过湿交换机加湿后进入已升温的电堆,提高电堆中膜组件的湿度的步骤,开始电堆的功率输出。
-
The innovations of the thesis have been shown in several aspects as follows: put forward the transfer mechanism model of the landslide thrust on basis of the soil arching theory, and according to the model the formula about how to compute the thrust acting on the pile and the maximum pile spacing have been deduced. Set up the displacement model about the interaction of the pile and landslide, and their relatively displacement can be taken into consideration when computing the pile, thus the limitation of supposing the distribution of landslide thrust has been avoided, at the same time, the applied condition of the model and the computing procedure have been given. Bring forward the improved computing method of the anti-sliding pile with prestressed cable, which has been verified rational and applicable, making the method more perfectly in theory. Through the study on the mechanical model of the foundation beam with prestressed cable, put up the limit design idea of the structure, and the realization procedure of the idea has been given and programmed with the finite element, which leads to a new thinking for the safe and rational design of the foundation beam with prestressed anchor cable.
本论文的创新之处在于,用土拱理论建立了滑坡推力在抗滑桩与坡体之间的传递机制模型,并由此得到了作用于抗滑桩上的滑坡推力计算式以及最大桩间距的确定条件式;建立了抗滑桩与滑坡体相互作用的位移模型,该模型能考虑桩与坡体相互作用过程中二者相对位移的影响,避免了人为假设滑坡推力分布形式的缺陷,给出了其适用条件和计算过程;提出了预应力锚索抗滑桩的改进计算方法,使得预应力锚索抗滑桩的计算理论更加完善,通过实例验证了该方法的适用性和合理性;在预应力锚索地梁力学计算模型研究的基础上,提出了预应力锚索地梁极限状态设计的新思想,给出了该设计方法的实现途径并编制了有限元计算程序,为锚索地梁合理而安全的设计提供了一种新思路。
-
Compared with free field, after setting up a pile body, the displacement, velocity, acceleration of pile head are obviously reduced, this proved that the existence of pile arrived the effect of reducing the earthquake effect.
较之自由场,设置桩体后位移、速度、加速度明显减小,说明桩身的存在起到了隔震减震的作用。
-
According to fully expounding the geologic condition of the location of the bridge and the structure of pile foundation and the research level of the bearing capacity of group pile foundation in the present, the paper analyzes the mechanism of group effect and the impact on bearing capacity of pile foundation. The finite-element numerical analyses and self-balanced method are adopted in the present paper to calculate and analyze the vertical bearing capacity of pile group of north main-tower is cleared up and analyzed.
在全面阐述桥位区工程地质条件和桩基础组成结构以及群桩基础承载力研究现状的基础上,深入探讨了群桩效应及其对桩基础承载力影响的机理,分别采用自平衡试桩测试技术和三维土工有限元模拟方法研究了单桩竖向承载力问题,通过对试验和计算结果的整理、对比分析,确定了能够客观反映地基土工程特性的地基土计算参数。
-
As the years pass and layer on layer of rock fragments pile up, they are squeezed or compacted by the weight of the materials on top of them. Then sediment s may be cemented together, forming the sediment ary rocks.
随着时间的流逝,岩石和矿物碎屑一层层地堆积起来,上覆岩屑物质的重量对下伏岩屑产生压实作用,然后沉积物被胶结在一起,最终形成沉积岩。
-
Of false bill fight the ability that prevent bogus stronger and stronger: True entrance ticket imprints have what form randomly is exclusive a form code, the person that make a holiday buys a piece of true ticket, pile up according to a form of this piece of entrance ticket next, make about a hundred pieces of false bank note, admit only as a result of the server of check ticket a form code, so, the person that the first ticket that hold a holiday enters can be passed to scan examine, come after that no matter be true ticket or false bill, can be blocked to be outside the door, produce issue then.
假票的抗防伪能力越来越强:真门票印有随机形成的唯一条形码,制假者购买一张真票,然后根据这张门票的条形码,制作出上百张假票,由于验票的服务器只承认一个条形码,所以,第一个持假票入场者可被通过扫描检验,而后来的无论是真票还是假票,都会被挡在门外,于是产生纠纷。
-
The time-history velocity response signal of pile can be decomposed by Sym wavelet. The power spectrum value can be extracted from some specified spectrum range. These values from one signal makes up the characteristic vector representing this signal. The relationship between characteristic vector of pile and pile defect type can he established by using BP artificial neural network. Abundant time-history velocity response signals of pile can be acquired by numerical simulation method.
利用Sym小波对基桩速度响应时程曲线进行小波分解,对指定频带上的信号分量进行特征值提取,提取的特征值为反映各频带范围内体现能量分布的功率谱均值,提取的特征值可构成反映信号特征的特征向量,同时利用BP人工神经网络的非线性映射特性建立特征向量和基桩缺陷类别之间的一种对应关系。
-
Not long since, we in rest Xi Ha laughs , the laughter loud time corridor like silver bell; Have, we have occured internal conflict, all make noise blush ear is red, in it solid acid very; Have, we pile up to share the snacks of a parcel together, in every possible way taste when heart.
曾几何时,我们在休息时嘻哈大笑,银铃般的笑声响遍走廊;曾经,我们发生过内讧,大家闹的脸红耳赤,其实心里酸极了;曾经,我们堆在一起分享一小包的零食,百般滋味在心头。
-
A CMOS front-end ASIC for semiconductor radiation detectors is proposed.The ASIC comprises a charge sensitive amplifier,a gm-C type shaper,a peak detect and hold circuit,and two discriminators.The PDH and the discriminators,together with some logic circuits,provide the capability to reject trailing edge pile-up.The circuit has been designed in a 0.5?
提出了一种用于半导体辐射探测器读出的CMOS前端电路,该ASIC电路包含电荷灵敏放大器、跨导-电容型脉冲成形器、峰值检测/保持电路和甄别器,后两者结合一些逻辑电路实现了抑制脉冲成形器输出波形尾缘堆积的功能。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?