英语人>网络例句>pile sheathing 相关的网络例句
pile sheathing相关的网络例句

查询词典 pile sheathing

与 pile sheathing 相关的网络例句 [注:此内容来源于网络,仅供参考]

Combining with engineering practice of using composite foundation with CFG pile to deal with oilcan foundation of 50000m 3, this paper discusses the application of CFG pile in dealing with oilcan foundation .

本文结合采用CFG桩复合地基处理 5 0 0 0 0m3 油罐地基的工程实况,对CFG桩处理油罐地基的适用性进行了初步探讨。

The recommended value of earth block effect at the end of open steel pipe pile with a diameter of over 600mm is obtained through pile testing .

文章通过试桩得出桩径大于 600mm的开口钢管桩桩端土的闭塞效应的建议值。

By means of the orthogonal expansion technique, the coupling system solutions are finally obtained. Then the dynamic model of saturated soil layer caused by pile longitudinal vibration is founded. Incorporated wave propagations into saturated soil layer, the characteristics of soil resistance factor and the mechanism of the radial damping are analyzed, as well as distributions of shear stress and pore pressure in saturated soil caused by pile vibration.

然后利用上述解析解分析了饱和土层复阻抗,并从饱和土波动理论出发,建立了桩纵向振动引起的饱和土层振动模式,剖析了辐射阻尼产生机理,研究了桩纵向振动引起的饱和土层中剪应力及孔隙水压力分布。

From this test results, it is obtained that the maximum lateral displacement occurs at a depth of about 0.75L; land upheaval build up rapidly and reach the maximum when the pile tip arrive at depth of about 6 m; and the increment. of excess pore water pressure reaches the maximum when the pile tip arrive at the piezometer level; while the maximum excess pore pressure presents a hysteresis quality with radial distance.

由测试结果可知,最大的侧向位移发生在距地表0.75L附近,地面隆起从桩贯入开始迅速发展,并在桩压入到6m左右时达到最大值,测点处超静孔压增量的最大值发生在桩端到达该点所在水平面时,而超孔压的最大值沿径向有滞后性。

The characteristics of construction method of diesel pile driver as well as its application scope in PC pipe pile construction are introduced.

介绍了柴油打桩机打设PC管桩施工工法的特点,适用范围,分析了柴油打桩机的工作原理,提出了施工质量要求和安全保证措施,经过效益分析,表明该方法加固桥涵地基是目前软基处理最有效、最方便的一种。

The face of fierce competition in the market and users and the changing needs of the community, the company promptly developed a series of pile driver design and optimization of various improvements, which YZY-Hydraulic static pile driver beat series, has been a leader in the domestic level .

面对激烈的市场竞争以及用户和社会不断变化的需要,公司及时对自行研制的桩机系列进行优化设计及多方改进,其中YZY型全液压静力压桩机系列,在国内已处于领先水平。

Based on experiences, the calculation method for main parameters and relevant data of pile hammer of vibration pile driver extractor are presented, gives the theoretical basis for the design and application.

结合实践经验,给出了振动沉拔桩机振动桩锤主要参数以及相关数据的计算方法,为振动沉拔桩机振动桩锤的设计和应用提供了理论依据。

The time-history method is used for calculating the seismic response of high piers under uniform excitation and progressive wave effect in consideration of pile group effect and pile-soil interaction.

建立一座5跨薄壁高墩连续刚构桥的空间抗震有限元模型,考虑群桩效应和桩-土效应,运用时程分析法计算了一致激励及行波效应下高墩的地震响应。

The characteristics of co-operation of pile and soil, reinforce mechanism, failure mode and engineering characteristics of rammer carrier CFG pile composite foundation are also researched.

研究夯扩载体CFG桩复合地基的桩土共同作用特性、加固机理、破坏模式和工程性质。

In this paper, the author sets up the dynamic model of the vibratory extracting-driving piling machine, and carries out the dynamic analysis, parameter calculation and Matlab's simulation for this model. Using the equation reciprocity law to carry out the calculation of soil parameter and simulation, and using the genetic algorithm to make optimization of the machine on the basis of the simulation, the author gets the optimum self-induced vibration frequencies of the machine changing with the depth of the pile and the optimization result of other parameters, thus reaching the conclusion that along with the increase of pile sinking depth, the optimum self-induced vibration frequency becomes bigger, and the vibration mass becomes smaller, hence deepening the knowledge of the dynamic performance of this system.

本文建立了振动沉拔桩机的动力学模型并对这一模型进行了动力学分析、参数计算和Matlab仿真,并利用方程对等法进行土壤参数的计算和仿真,又在仿真的基础上使用遗传算法对桩机进行了优化,从而得出了路基加固振动沉拔桩机随沉桩深度变化而改变的最佳激振频率以及其它参数的优化结果,并得出了随沉桩深度的增加,桩机的最佳激振频率由小变大,最佳参振质量由大变小的结论,深化了对该系统动力学性能规律的认识。

第22/189页 首页 < ... 18 19 20 21 22 23 24 25 26 ... > 尾页
相关中文对照歌词
Bricks And Steel
Money Pile
Sky Is Ours
Them Bones
Sentenced To Burn
Going Out In Style
Get Lost
Burning Pile
Body Of Years
Ode To My Car
推荐网络例句

He paid $5,000 for this cupcake.

他我这个纸杯蛋糕花了5000美元。

I mean, if you want to, that is

我的意思是,如果你们想吃的话。

In addition to his fee, he would be awarded an unaltered clone of himself.

除了费用,他将获得一个不作任何改造的克隆体。