查询词典 pile sheathing
- 与 pile sheathing 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
By the self-balanced loading test, the problem that the ultimate bearing capacity of the large tonnage socketed belied pile in soft rock is hard to be acquired is solved.
广西南宁盆地广泛分布的第三系泥岩是典型的软岩,通常被选择作为建筑物桩基的持力层。
-
Self-balanced loading test is a static load test method, in which load cell is embedded in the pile exerts load. Double load cell technique refers to meeting different designing needs.
摘要]自平衡试桩法是通过埋置于桩身中的荷载箱施加荷载的一种新型静载试验方法。
-
This paper focus on the feasibility study on combination of seal and extrusion to hole formation and rammed cement soil pile, and its application on wet and sinking loessial area; gave a research method of bounds replacement rate for eliminating the wet or sinking of loessial area; and study on value access method of bearing capacity parameter for technology calculation.
结合了具体工程实践,本课题的主要研究内容:①研究挤密成孔法与夯实水泥土桩组合的可行性,及在湿陷性黄土地基中的应用;②给出使黄土湿陷性消除的界限置换率研究方法;③对采用此工艺计算承载力时参数的取值方法进行研究。
-
Single factor experiments were done with the factors including the width of protrusion and the trolley's velocity, which showed that the surface frictional coefficient decreases with the width of protrusion increasing, and doesn't change with the trolley's velocity changing, which was consistent with the results of the orthogonal experiment. A theoretical model of the horizontal projection of a corrugated bionic surface's contact area was built, which showed that the contact area's horizontal projection decreases with width and interval increasing respectively and that the ratio of the contact area's horizontal projection and the vertical load decreases with the vertical load increasing. It indicated that the surface frictional coefficient decreases with the above three factors increasing respectively. Finite element modeling and analysis of interactions of a plate and soils was done using ANSYS, which showed that the plate frictional coefficient is little relative to soil elastic modulus and decreases with vertical surface pressure and that trolley's pull and vertical displacement of bionic surface's control pilot keep constant almost during the plate being pulled. Finite element modeling and analysis of interactions of a corrugated bionic surface and soils was done using ANSYS, which showed that surface frictional coefficient is little relative to soil elastic modulus and decreases with bionic surface's structural parameters and vertical pressure increasing. However, the three factors all didn't affect the surface frictional coefficient remarkably on the condition of 90% dependability. For the first time, bionic surfaces were applied to screw piles, which formed bionic screw piles, and the contrast experiments showed the bionic screw pile had certain resistance-decreasing effects.
建立了波纹型仿生曲面与土壤的接触面积的水平投影的理论模型,表明接触面积的水平投影A随着波纹型仿生曲面突起宽度、两相邻突起间距的增大而减小,接触面积的水平投影与波纹型仿生曲面表面垂直载荷之比随着波纹型仿生曲面表面垂直载荷的增大而减小,进而得出仿生曲面摩擦系数随着波纹型仿生曲面突起宽度、两相邻突起间距以及表面垂直载荷的增大而减小;利用ANSYS软件对平板与土壤的相互作用进行了有限元建模与分析,表明平板摩擦系数与土壤弹性模量关系不大,而随着表面垂直载荷的增大而减小;平板牵引过程中台车牵引力和仿生曲面控制节点垂直方向位移基本保持不变;利用ANSYS软件对波纹型仿生曲面与土壤的相互作用进行了有限元建模与分析,表明波纹型仿生曲面系数在一定范围内基本不受土壤弹性模量的影响,随着波纹型仿生曲面突起宽度、两相邻突起间距以及表面垂直载荷的增大而减小,但在可信度为90%的前提下,三个因素影响都不显著;首次将波纹型仿生曲面应用于与土壤作用方式以挤压为主的螺旋桩,形成仿生螺旋桩,并与普通螺旋桩进行了沉桩对比试验,表明波纹型仿生曲面应用于螺旋桩桩体表面具有明显的降阻作用。
-
But now, to the junior high school, our friendship faded, no longer inseparable as before, and never sat a pile, said that he hoped the words of everlasting friendship.
可如今,到了初中,我们之间的友谊淡了,不再像以前那样形影不离了,再也不会坐到一堆,说希望我们友谊天长地久的话。
-
I saw a table in the corner, upon which lay a pile of books.
我看到角落里有张桌子,上面放着一叠书。
-
Laboratory experiment of multi-pile composite foundation of steel pipe column and sand column ;2. A set of apparatus of foundation physical model was developed and utilized to conduct model tests of sand column composite foundation.
通过自行研发的试验装置,对砂桩群桩复合地基进行室内模型试验,得出砂桩复合地基的一些工作性状:砂桩复合地基的荷载沉降曲线特征、桩和土的应力特点、桩土应力比特点、荷载分担比曲线特征等。
-
There is a pile of sand on the road.
在路上有一堆沙子。
-
There are traces of gold in this pile of sand.
这堆沙里有少量的金子。
-
All you do all year round is do three hops and land in a pile of sand.
所有您做的一切,全年是在一堆沙子上做着跳跃。
- 相关中文对照歌词
- Bricks And Steel
- Money Pile
- Sky Is Ours
- Them Bones
- Sentenced To Burn
- Going Out In Style
- Get Lost
- Burning Pile
- Body Of Years
- Ode To My Car
- 推荐网络例句
-
Apllied the data of QuickBird-2——the highest resolution remote sensing,and based on the theory and methodology of fractal geometry,we have quantitatively studied remote sensing lineations in Gaolong gold deposit of Guangxi.
采用Quick Brid-2高分辨率卫星遥感数据,通过分形几何学的盒计维数法,定量研究广西高龙金矿区遥感线性构造。
-
So, sometimes, to change the color can not be your food (referring to the above-mentioned crustacean) has been a sign of boiling over.
所以,有时,来改变颜色,不能你的食物一直是沸腾了的迹象。
-
MILAN - Nils Liedholm told 'Tuttosport':'It is not a decisive game but actually an important one.
米兰--利德霍尔姆接受全体育采访时说:罗马与米兰的比赛虽不是决定性的,但的确是场重要的比赛。