查询词典 pile sheathing
- 与 pile sheathing 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The bung uses the stainless steel plate to make the ledger wall,the built-in aluminum silicate heat preservation, the fire door size extends 350mm, high 580mm, in spandrel wall body whole upward promotion type electrically operated heat preservation fire door, when fire door closure the entire fire door is a circular whole, the fire door sealing property strengthens,the turntable uses the stainless steel to make the 1600m/m turntable, with take load bearing work piece, the entire turntable does not divide the location as the plane, the operators may pile up the work piece willfully, because turntable every 40 minutes turn on lathe biography one week, when work theoperators did not look nearly the turntable in the rotation, the fire door starts in addition in a big way, the operators may pass in and out the work piece willfully, but is not limited the time the turntable to be possible in 20-60The minute revolves one week-long time to modulate velocity willfully,no matter the fire door opens shuts, the turntable from the start work on uninterrupted revolving, not any necessity and the fire door open shut carry on the interconnection, needs to stop when revolves, only need press down on the control electricity cabinet's pause button then, the fire door opens shuts,grasps voluntarily by the operators, presses installs nearby the fire door opens shuts Niu then.
炉盖采用不锈钢板做底板,内置硅酸铝保温,炉门尺寸宽350mm,高580mm,侧墙体中整体向上提升式电动保温炉门,炉门关闭时整个炉门为一个圆形整体,炉门密封性能增强,转盘采用不绣钢制成1600m/m转盘,用以承载工件之用,整个转盘为平面不分工位,操作人员可以任意堆放工件,由于转盘每40分钟旋传一周,工作时操作人员几乎看不到转盘在转动,加上炉门开的较大,操作人员可以任意进出工件,而不受时间限转盘可以在20—60分钟旋转一周的时间任意调速,不论炉门启闭、转盘从启动工作就不间断的旋转,没有任何必要与炉门启闭进行联锁,需要停止旋转时,只需按下控制电柜上的停止按钮即可,炉门的启闭,由操作人员自行掌握,按动安装在炉门边的启闭钮即可。
-
According to the characteristics of large span structure design, such as big diffrence of collumn force, large span and spacious roof, week linkness of different parts and large displacement of bearing, spacil structure methods such as different types of concrete pile with different length, suitable joint and bearing are adopted to achieve the economical and safe demand
提要]针对西北农林科技大学体育馆类大跨度空旷建筑结构的设计特点,如柱底内力差别很大、上部结构空旷、各部分之间的连接较弱、屋盖结构跨度大、支座位移大等,采取差异化的桩型和桩长,适当分缝,合理配置支座等有效的结构措施,达到既安全可靠、又经济性好的目的。
-
By means of test of stir pile of cement soil,the main influence factors of cement soil strength are analyzed.
通过对水泥土搅拌桩试验,分析了影响水泥土桩强度的主要因素,并详细论证了土的种类、含水量等因素与水泥土桩体强度之间的关系。
-
Reinforcement mechanism and strength influencing factor of cement soil pile of SMW engineering method are introduced.
介绍了SMW工法复合围护结构中的水泥土桩的加固机理、强度影响因素。
-
Considering the role of foundation slab, the stress and settlement of composite foundation improved by cement soil pile were analyzed by use of 3D finite element method.
在考虑基础板的基础上,通过三维数值方法对水泥土桩加固复合地基的附加应力和沉降进行了分析。
-
Experimental study of its macroscopical mechanics behavior and analysis of asymptotic homogenization of cement- soil and Cement Mixing Pile are the main work of this dissertation.
本文的主要工作是对水泥土的力学性能进行试验研究,并用均匀化方法分析水泥土的相关力学性能,同时用把相关的结论运用到水泥土复合地基的计算中,总结了水泥土试验及其运用均匀化方法的有关规律。
-
In this paper based upon importance analysis on the inspection of composite foundation of the cement soil mixed pile s the advantages and disadvantages of various test methods are discussed.
本文针对桩体由于裹砂、夹泥等引起的缺陷,甚至造成的断桩,通过具体实践,探讨应用了一种新兴工艺,即桩体内注浆的方法进行处治,以增加其强度和完整性,效果良好。
-
It is economical and efficient, mainly used in small-diameter pile civil construction.
Oslash;久经市场检验的经典机型,施工经济高效,主要用于工民建施工。
-
Based on ANSYS, this paper considers the sluice valve and the base as a whole to take the Nonlinear Finite Element Study of the static and dynamic, at the same time discusses the interaction among sluice valve, pile and construction. Then some conclusions are drawn by comparing and analyzing the dynamic stress conditions of the gate chamber using response-spectrum method and time history method.
本文基于大型通用有限元软件ANSYS,将该水闸闸室结构与地基作为一个整体进行非线性静动力有限元计算,有效的考虑了地基-结构的相互作用,并将振型分解反应谱分析法和时程分析法的计算结果进行对比并得出相应的结论。
-
According to complex neighboring environment of deep foundation pit and practical seepage control and treatment situations as well as analysis of composite factors compound supporting method of single-row pile combined with water-resisting curtain is proposed.
根据拟建深基坑复杂的周边环境及需对其进行防渗处理的实际情况,综合考虑多方面因素后,决定采用单排桩与止水帷幕相结合的复合支护方法,详细介绍了该种复合支护方法的设计过程及施工注意事项,对类似工程具有一定的借鉴作用。
- 相关中文对照歌词
- Bricks And Steel
- Money Pile
- Sky Is Ours
- Them Bones
- Sentenced To Burn
- Going Out In Style
- Get Lost
- Burning Pile
- Body Of Years
- Ode To My Car
- 推荐网络例句
-
Apllied the data of QuickBird-2——the highest resolution remote sensing,and based on the theory and methodology of fractal geometry,we have quantitatively studied remote sensing lineations in Gaolong gold deposit of Guangxi.
采用Quick Brid-2高分辨率卫星遥感数据,通过分形几何学的盒计维数法,定量研究广西高龙金矿区遥感线性构造。
-
So, sometimes, to change the color can not be your food (referring to the above-mentioned crustacean) has been a sign of boiling over.
所以,有时,来改变颜色,不能你的食物一直是沸腾了的迹象。
-
MILAN - Nils Liedholm told 'Tuttosport':'It is not a decisive game but actually an important one.
米兰--利德霍尔姆接受全体育采访时说:罗马与米兰的比赛虽不是决定性的,但的确是场重要的比赛。