英语人>网络例句>pile into 相关的网络例句
pile into相关的网络例句

查询词典 pile into

与 pile into 相关的网络例句 [注:此内容来源于网络,仅供参考]

The achievement that soil ultimate bear capacity heightened under pile caps due to barrier effect of piles gained from model test, and soil move around piles acquired from numerical simulation, its not only verified hypothesis of composite pile foundation nonlinear design theory, but have important reference value to the study of design theory and design method of composite pile foundation, which help to go deep into study of promote pile-soil-pile caps nonlinear interaction theory and composite pile foundation nonlinear design theory.

由模型试验得到的桩的遮拦作用对承台下土体极限承载力提高和数值模拟得到的土体绕桩流动等成果,不仅验证了

By decomposing the problem system into an extended saturated soil system and a virtual pile system, through the strain compatibility condition between the extended saturated soil system and the virtual system at an arbitrary depth z along the pile, and combined the Laplace transform and its convolution, a Fredholm intergral equation of the second kind of the single pile in saturated layered transversely isotropic soils is established. The axial force and diaplacement of the pile are obtained by solving the Fredholm intergral equation.

将求解体系看作是饱和土体和虚拟桩的叠加,利用沿桩身任意一点z处饱和地基与虚拟桩的应变协调,并结合Laplace变换及其卷积性质,建立了饱和成层横观各向同性地基中竖向受荷单桩问题的第二类Fredhlom积分方程,对该积分方程进行求解可得桩的真实轴力、位移。

By means of the orthogonal expansion technique, the coupling system solutions are finally obtained. Then the dynamic model of saturated soil layer caused by pile longitudinal vibration is founded. Incorporated wave propagations into saturated soil layer, the characteristics of soil resistance factor and the mechanism of the radial damping are analyzed, as well as distributions of shear stress and pore pressure in saturated soil caused by pile vibration.

然后利用上述解析解分析了饱和土层复阻抗,并从饱和土波动理论出发,建立了桩纵向振动引起的饱和土层振动模式,剖析了辐射阻尼产生机理,研究了桩纵向振动引起的饱和土层中剪应力及孔隙水压力分布。

At last, with this finite element model, this dissertation gave a relatively complete analysis to the lateral seismic nonlinear dynamic responses of the single pile, and analyzed the pile head's response spectrum, earthquake Fouriers spectrum, then a test parametric sensitivity analysis was taken into consideration, including modulus ratio of pile to soil, soil material damping ratio, earthquake input level.

第二,利用该有限元模型,较为全面地研究了地震荷载作用下的单桩横向非线性动力响应,分析了桩头反应谱、地震波傅里叶谱等,进行了桩土弹性模量比、土体材料阻尼比、地震动输入水平等因素对单桩横向非线性动力响应的参数敏感性分析。

Furthermore, the calculation of pile group foundation doesnt take undertaking of cap and soil between the pile stake into account.

此外,桩基础的计算一般不考虑桩间土和承台的荷载分担作用。

Under the condition of the slide between pile and soil around pile is taked into account,five equations are established, including the equation of compatibility between the settlement of pile cap soil and the settlement of pile cap; the equation of compatibility between the settlement of pile head soil and the settlement of pile head; the physical equation between the settlement of soil around pile shaft and the settlement of pile shaft;the equation of equilibrium between loads on the pile cap, side frictional stress and restraints of pile head; the equation of compatibility between the deformation of the pile body and the subtraction between the settlement of pile cap and the settlement of pile heap.

桩身单元和土单元存在着相互作用,在允许桩土相对滑移的前提下,建立桩顶土体沉降与桩顶沉降的协调方程、桩底土体沉降与桩端沉降的协调方程、桩土相对位移与桩侧摩阻力的物理方程、桩身力的平衡方程、桩身压缩和桩顶沉降与桩端沉降之差的协调方程。

A calculation method for the ultimate tip resistance of rock socketed pile was conducted. The geostatic stress of soil and rock was considered as homogeneous load on the tip plane of the pile, and then the force of the pile tip was decomposed into some simple forces. According to the theory of slipping line, the most dangerous point on the tip plane of the pile was confirmed, and the stress of the point was obtained according to Mindlin solution.

为求出桩端极限承载力的表达式,本文将嵌岩段以上岩土层自重视为作用在基岩半平面上的均布荷载,把桩端合力分解为相对简单的荷载作用于基岩平面上,利用滑移线理论并通过叠加的方法分析出桩端基岩破坏时的最危险点。

The innovations of the thesis have been shown in several aspects as follows: put forward the transfer mechanism model of the landslide thrust on basis of the soil arching theory, and according to the model the formula about how to compute the thrust acting on the pile and the maximum pile spacing have been deduced. Set up the displacement model about the interaction of the pile and landslide, and their relatively displacement can be taken into consideration when computing the pile, thus the limitation of supposing the distribution of landslide thrust has been avoided, at the same time, the applied condition of the model and the computing procedure have been given. Bring forward the improved computing method of the anti-sliding pile with prestressed cable, which has been verified rational and applicable, making the method more perfectly in theory. Through the study on the mechanical model of the foundation beam with prestressed cable, put up the limit design idea of the structure, and the realization procedure of the idea has been given and programmed with the finite element, which leads to a new thinking for the safe and rational design of the foundation beam with prestressed anchor cable.

本论文的创新之处在于,用土拱理论建立了滑坡推力在抗滑桩与坡体之间的传递机制模型,并由此得到了作用于抗滑桩上的滑坡推力计算式以及最大桩间距的确定条件式;建立了抗滑桩与滑坡体相互作用的位移模型,该模型能考虑桩与坡体相互作用过程中二者相对位移的影响,避免了人为假设滑坡推力分布形式的缺陷,给出了其适用条件和计算过程;提出了预应力锚索抗滑桩的改进计算方法,使得预应力锚索抗滑桩的计算理论更加完善,通过实例验证了该方法的适用性和合理性;在预应力锚索地梁力学计算模型研究的基础上,提出了预应力锚索地梁极限状态设计的新思想,给出了该设计方法的实现途径并编制了有限元计算程序,为锚索地梁合理而安全的设计提供了一种新思路。

The article analyses the relationship between the load of pile in the direction and the pile root.The investigation indicates that the carrying capacity has nice adaptability to the soil floor depth the column knocked into and change of the oil floor construction when the plinth depth is larger than 60cm,and the length of the column and the change of the soil floor have little impact on load of pile,whereas load of pile is more sensitive to the anti-sinking and change of column diameter dimension.

分析了基桩竖向承载力与桩体结构的关系,研究表明:承载力在基桩深度大于60cm后对桩体打入土层深度、土层结构变化有良好的适应性,桩长和土层结构的变化对基桩承载力的影响不大,而基桩承载力对止沉盘和桩径尺寸变化敏感。

Hydraulic pile hammer is one of the pile driving machines that drive prefabricated piles into the ground in the construction of pile foundation such as construction,bridge,dock, etc.

用液压打桩锤打桩,可以调整撞击应力波波形,减小应力峰值,延长有效作用时间,是一种比较理想的预制桩施工机械,目前在发达国家已被广泛使用,并形成了系列化。

第2/15页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。