查询词典 pile hammer
- 与 pile hammer 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A story is going about that the rejection letters he has received from the publishers could make a five-foot high pile.
据传说,他收到出版商的退稿信堆起来有五英尺高。
-
Five-story teaching building from the ground disappeared into a pile of rubble.
5层教学楼从地面上消失,变成一堆废墟。
-
Melting on top|of a big old pile of flapjacks.
在煎过头的烙饼上慢慢融化
-
It has a wide prospect.We havent find report on large amount fly ash concrete using as frame of pile and pier.
在桩基础承台和桥墩结构中使用大掺量粉煤灰混凝土,未见有其它相关报道。
-
Cylinder pile cluster; drag force; bottom bed; local erosion-deposition; arranging format
圆柱桩群;阻力;底床;局部冲淤;排列方式
-
But instead they found a tenant with very smelly feet asleep in bed next to a pile of extremely foul-smelling laundry.
相反,他们却发现了一位脚气很大的房客正在床上鼾睡,而他旁边正堆着一堆极其恶心还带有腐味的衣服。
-
Negative friction is always the top important problem in geological engineering, In order to calculate and study the negative friction, displacement coordinated method is improved and the relative displacement between the pile and soil is considered.
为了对负摩阻力进行计算研究,本文对传统的位移协调法进行了改进,考虑了桩土之间的相对位移,并结合土与结构材料接触面的固结快剪试验结果提出了桩土荷载的传递函数。
-
The practice proved the socketed pile used friction ineffective treatment at the top can lower the surface of force efficiently. This type of foundation can be popularized in near shore projects.
探讨了振弦式压力盒在刚性接触面应力监测中的应用及存在的问题和监测成果修正方法;重力式嵌岩锚的传力机理;影响重力式嵌岩锚安全监控模型的因素。
-
Based on the 70 axial force monitoring data on 64 manometers in south tower piles foundation of JiangYin Bridge, the force transferring mechanism of socketed pile group using friction ineffective treatment at the top 20 meters was analyzed.
探讨了振弦式压力盒在刚性接触面应力监测中的应用及存在的问题和监测成果修正方法;重力式嵌岩锚的传力机理;影响重力式嵌岩锚安全监控模型的因素。
-
Based on the 70 axial force monitoring data on 64 manometers in south tower piles foundation of JiangYin Bridge, the force transferring mechanism of socketed pile group using friction ineffective treatment at the top 20 meters was analyzed.
实践证明,桩周摩擦失效嵌岩桩基础可有效地降低塔墩荷载的作用面,是一种值得在跨越工程中推广的基础方案。
- 相关中文对照歌词
- Hammer Time
- Sleepin' On A Master Plan
- Hammer Back
- Dancin' Machine
- Speakers Going Hammer
- Hammer Head
- When The Hammer Falls
- Here Comes The Hammer
- John Henry
- Under The Hammer
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。