英语人>网络例句>pile hammer 相关的网络例句
pile hammer相关的网络例句

查询词典 pile hammer

与 pile hammer 相关的网络例句 [注:此内容来源于网络,仅供参考]

Stoning hammer, machinist hammer, sledge hammer, ball pein hammer, claw, hammer, roofing hammer, rubber mallet hammer, axe.

9F05(E4F05)石工锤、钳工锤、八角锤、元头锤、羊角锤、独角锤、橡胶锤、把斧等。

3D effect is analyzed and the average velocity of wave propagating in the pile, which mainly influences inverse interpretation, is discussed. Finally, the theory results are verified by model experiment. It is shown that 3D results have the same phase with ID results. The pile radius, the duration of impulse, the ratio of hammer radius to pile radius and shear velocity of the soil around the pile have influences on 3D effect. The best position of receiver is 0.55R from the pile center. The average velocity of wave propagating in the pile reduces due to transversal inertia effect and 3D effect.

结果表明:三维曲线与一维结果在相位特征上一致;波场图直观地反映了波在桩中的传播规律;三维效应与桩径、激振脉冲宽度、相对激振半径及桩周土剪切波速有关;传感器放在0.55R处可以得到干扰较小的信号;三维效应和横向惯性效应的存在会使桩中的波速减小,土的性质对波速影响不大;反演精度与缺陷的性质、激振条件有关。

Model test shows that when raft is the principal bearing element, a single pile with cap has nearly the same behavior with a corresponding unpiled raft when subjected to vertical load. When the load acting on the pile cap exceeds the ultimate pile load, the pile carries less load than it's ultimate pile load. When the load exceeds 2 times of the ultimate pile load, pile is nearly at full capacity.

一、进行了室内模型试验,证明当以桩间土为主承担荷载时,带台单桩的荷载~沉降特性与天然地基上浅基础类似;当外荷载超过单桩极限承载力时单桩并不达到极限承载力,当外荷载超过2倍单桩极限承载力时桩顶反力才接近单桩极限承载力;此后加载台下单桩以接近极限承载力的状态继续承担外荷载。

The results indicate that when soil and pile are same, the shear stresses between pile and soil under the ultimate situations of different modes are different; the negative friction on pile induced by surcharge is maximum; and the negative friction of uplift pile is minimum; the friction of pile top induced by pressing pile and bottom-loaded pile is between them.

结果表明,同种土体和桩体条件下,各种模式达到极限状态时桩-土间剪切应力不同,堆载作用下负摩擦力值最大,抗拔桩负摩阻力值最小,桩顶受压桩、托桩的摩阻力值介于其间;桩材泊松比在0.15~0.35范围内时,桩侧摩阻力随泊松比的增大而增大。

The paper uses precise step to produce the continuity function of water hammer mathematic model, not only gains more precise water hammer pressure function and water hammer wave speed functionbut also founds correct water hammer mathematic modelContinuity EquationMovement EquationAfter ignoring subordinate facts, function (1) and (2) translate into the current applied water hammer pressure function and water hammer wave speed function.

本论文对水击数学模型中的连续性方程重新进行了严谨的推导,不仅得到了更加准确的水击压强和水击波速的计算公式也建立了正确的水击数学模型连续性方程运动方程当忽略次要因素以后,公式(1)和(2)即可转化为当前应用的水击压强计算公式和水击波速计算公式。

In the fourth paragraph, how the theory of the damping to forging hammer foundation advances at home and abroad, the research and application of the implement for damping to forging hammer, the structure of damping to forging hammer and the calculation methods for forging hammer foundation vibration system, which are used at home nowadays, are particularly introduced.In the fifth paragraph, aiming at direct damping under anvil block of forging hammer, the author bases a mechanics model of two-degree with damping, and optimizes the vibration parameters both in frequency field and in time field, then finds out the new simple method of optimizing the vibration parameters of the damping device under anvil block of forging hammer.

第五章针对锻锤砧下直接支承式减振基础,建立了锻锤减振系统的二自由度有阻尼振动力学模型,然后用傅立叶变换法求出振动传递率的频率关系,用直接积分法求出砧座和基础位移的时域响应,并分别对频域函数和时域函数进行参数优化,最终建立起频率函数—时域函数—优化参数间的相互关系,从而找到了锻锤砧下隔振器参数优化的简便新方法。

The group's principal products include various kinds of single-head and multi-heads deep soil methed mixing pile machine, track drilling jumbo, static pressure pile machine, hammer pile machine, complex pile machine, screw pile machine, diaphragm wall drill machine for SMW method, rotatory drill machine, slurry pump, mortar pump, tap, drill rod, drill head, drill tool, construction material as well as textile machine and textile.

该集团公司的主要产品包括各种类型的单头搅拌桩机和多头搅拌桩机、各种类型的履带式凿岩台车、各种型号的静压桩机、各种类型的锤击桩机、各种类型的复合桩机、各种类型的螺旋桩机、各种类型的SMW工法的连续墙钻孔机、各种类型的旋挖钻机、各种类型的泥浆泵、沙浆泵、以及各种类型的水龙头、钻杆、钻头、钻具、建筑材料。还经营各种类型的纺织机械和纺织品等,我们还可以根据不同客户的要求和特点,设计不同的产品来满足客户的不用要求,我们可以为客户提供专业的服务。

The achievement that soil ultimate bear capacity heightened under pile caps due to barrier effect of piles gained from model test, and soil move around piles acquired from numerical simulation, its not only verified hypothesis of composite pile foundation nonlinear design theory, but have important reference value to the study of design theory and design method of composite pile foundation, which help to go deep into study of promote pile-soil-pile caps nonlinear interaction theory and composite pile foundation nonlinear design theory.

由模型试验得到的桩的遮拦作用对承台下土体极限承载力提高和数值模拟得到的土体绕桩流动等成果,不仅验证了

The primary studying works and characteristics:1 To summarize reinforcing theory of cement mixing pile composite foundation2 To analyze the primary mechanics characters and changing rules of cement mixing pile, based on analysis of test data both indoor and outdoor.3 To discuss siding frictional resistance, ending resistance, ultimate bearing capacity of simple mixing pile and effectiveness factor of grouped piles, loading ratio of soil between piles under cushion cap of grouped piles and stress ratio of pile and soil and so on, and use many computation method and experimentation method to ensure bearing capacity of mixing piles composite foundation.4 To point out and analyze eight sides flaws and problems of the bearing capacity calculation method of mixing pile compositefoundation which ensured by national and normative method/ formula.5 To apply test results of loading tests and a few settlement observation data, use gray theory to predicate ultimate bearing capacity of deep mixing piles, actual example demonstrate engaging between theoretical predicted value and actual value.6 To apply groovy layerwise summation method to discuss entity piles method, double foundation method, equivalent layerwise summation method and consolidation theoretical method and so on, especially by combination of engineering example, use FEM to calculate or discuss the settlement and changing rules of composite foundation.7 To discuss problems of critical length of composite foundation by combination of engineering example and numerical analysis method, and analyze the contrast of critical length between simple pile load and most area load of composite foundation, not only critical length of composite foundation is relative to modulus ratio between piles and soil, but also upside load distribution area of composite foundation.

主要的研究工作与特色为:(1)总结了水泥搅拌桩复合地基的加固原理;(2)在对室内外试验资料进行统计分析的基础上,系统分析了搅拌桩水泥土的主要力学特性及其变化规律;(3)探讨了搅拌单桩的侧摩阻力、端阻力、极限承载力及群桩效率系数、群桩承台下桩间土荷载分担比及桩土应力比等,提出用多种计算方法并结合试验方法来综合确定搅拌桩复合地基的承载力;(4)明确指出和分析了按国家有关规范的方法确定搅拌桩复合地基承载力所存在的八个方面的缺陷与问题;(5)利用过去没有加载至破坏阶段的载荷试验成果和较少的沉降观测数据,尝试了用灰色理论预测深层搅拌桩的极限承载力,实例表明理论预测值与实测值吻合较好;(6)在常规分层总和法的基础上,探讨了复合地基沉降计算的实体墩基法、双层地基法、等效作用分层总和法、固结理论法等,特别是结合工程实例,用有限元数值计算等方法计算和讨论了搅拌桩复合地基的沉降及其变化规律;(7)结合工程实例,用数值分析方法探讨了复合地基临界桩长的问题,指出和分析了单桩荷载下的临界桩长与复合地基大面积荷载下的临界桩长存在很大的差别,复合地基的临界桩长不仅与桩土模量比有关,而且与复合地基上部荷载分布面积有关。

The findings indicate that, on the whole, the pattern of load transfer curves of adfreezing stress on a steel pipe pile stem and that of resistance stress on the pile tip are parabola and straight line, respectively; Due to the rheology effect, to different extent, adfreezing stress on the pile stem and resistance stress on the pile tip vary with time and relative displacement of pile-soil, respectively, and the settlement of pile tip varies with time tempestuously within 5 hours of loading, and then approximates to stability.

结果表明:模型钢管桩桩侧冻结力荷载传递函数曲线及桩端阻力荷载传递函数曲线其线状大致分别程抛物线及直线;由于流变效应的影响,桩侧冻结应力及端阻应力随时间有不同程度的变化;桩土相对位移和桩端下沉量开始5h内随时间变化较大,但加载5h后逐渐向稳定方向发展。

第2/325页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Hammer Time
Sleepin' On A Master Plan
Hammer Back
Dancin' Machine
Speakers Going Hammer
Hammer Head
When The Hammer Falls
Here Comes The Hammer
John Henry
Under The Hammer
推荐网络例句

Listen,point and check your answers.

听,指出并且检查你的答案。

Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.

但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48

Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.

一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。