英语人>网络例句>pile building 相关的网络例句
pile building相关的网络例句

查询词典 pile building

与 pile building 相关的网络例句 [注:此内容来源于网络,仅供参考]

Now churn bored pile and slop breast wall pile have been broadly employed to high-rise building in xi'an area. Due to the different constructing technics, the dissertation analyzed the single pile's behavior under vertical load combined with engineering case, and compared the behavior between two kinds of pile.

1针对目前西安地区高层建筑广泛使用的旋挖成孔和泥浆护壁两种施工工艺的灌注桩,结合工程实例进行了竖向荷载下的单桩工作特性分析,并对两种施工工艺的灌注桩进行了比较。

The comprehensive treatment project of Tong Ken landslide consists of whittling slope、anti-landslide pile with anchoring cable、retaining wall、building ground drainages leveling off and calking slope、vegetation protection etc. After managing, under the action of earthquake load and watery the stability coefficient of landslide is up to 1.10.Then, this text researches the structural optimization design of anti-slide pile with anchoring cable. On the condition that the width of section is invariable, the height of section is confirmed by structural optimization method. This will change traditional method to optimize the height of section so that design is simplified and cost is lower.

最终选用的的综合治理方案是由削方、锚索抗滑桩、护坡挡墙、地表排水、整坡填缝、生物防护等多种工程措施优化组合而成,治理后,在饱水有地震荷载状态下滑坡的安全系数可达1.10论文重点是主要对锚索抗滑桩的桩身结构优化设计进行了研究,在给定抗滑桩截面宽度的条件下,运用结构优化的方法来确定抗滑桩截面高度,改变传统迭代计算方法确定桩截面尺寸,使抗滑桩截面高度取最优值,达到简(来源:ABC4a论文8d网www.abclunwen.com)化设计和降低工程造价之目的。

Build scene method to basically have: 1, dig a lake to pile mountain, model landform, decorate billabong of river river lake, monarch diameter builds a road, create landscape situation; 2, build building, stage, booth, cabinet, hall, house, a small room, a pavilion or house on a terrace, corridor, bridge, boat, a screen wall facing the gate of a house, wall the building facilities such as door of path of wall, stair, Deng, scene, create building situation; 3, fold big pool of rockery, strange peak, hole, Wei Ya with block build by laying bricks or stones, create rockery situation; 4, decorate valley, mountain stream, riprap, onflow, create mountain stream situation; 5, bluff of megalith of load one's writing with fancy phrases, come down in torrents of pilot a ship into a harbour and below, create chute situation; 6, set shallow water small pool by landform, build stone hill fountain, put in a suitable place to breed view and admire fish, lotus of cultivated carry on one's shoulder, Lu Di, flowers and plants, build Shui Shijing; 7, with different combination, decorate community to line and season photograph change or highlight the stance of isolated tree in order to reflect Lin Ji, or clip is arboreous, those who make have all sorts of pattern, create situation of flowers and trees.

造景方法主要有:1,挖湖堆山,塑造地形,布置江河湖沼,辟径筑路,造山水景;2,构筑楼。台。亭。阁。堂。馆。轩。榭。廊。桥。舫。照壁。墙垣。梯级。磴道。景门等建筑设施,造建筑景;3,用石块砌叠假山。奇峰。洞壑。危崖,造假山景;4,布置山谷。溪涧。乱石。湍流,造溪涧景;5,堆砌巨石断崖,引水倾泻而下,造瀑布景;6,按地形设浅水小池,筑石山喷泉,放养观赏鱼类,栽植荷莲。

The hole building technology of cast-in-site bored pile in riprap layer;2. Technical key points are summarized for hole building ,steel reinforcement cage construction and concrete pouring in order to increase construction quality of cast-in-place bored pile.

从工程现场施工和质量控制的角度,对钻孔灌注桩施工中存在的问题进行了探讨,总结了现场成孔技术要点,重点研究了钢筋笼的施工和混凝土的灌注,以提高钻孔灌注桩的施工质量。

The pile building enclosure with two or three bracing pieces and the gravity retaining wall are particularized as example in this paper.

采用杆系有限元方法或考虑土体的有限元方法对基坑工程进行模拟计算。

Through the example of the pile engineering of Yanshou big building in Putian City of Fujian Province,the major construction method of PHC pipe pile is introduced,the abnormal situations in the construction are analyzed,and the corresponding measures are put forward.

以福建省莆田市延寿大厦的桩基工程为实例,介绍了PHC管桩的施工方法,分析了施工过程中出现的异常情况,并提出相应的处理措施。

The technical features for construction of extra deep and large diameter pile with man-excavated shaft in complicated area and some unique treatment measures were introduced in combination with the pile foundation engineering of a building.

结合某大厦桩基工程实例,介绍了复杂条件下超深大直径人工挖孔桩的施工技术及独到的处理措施,取得了满意的工程效果。

This research shows that the effect of shield tunnel on the adjacent building's pile foundation is time dependent, because the adjacent structure and the pile foundation are affected in a certain period of time even after the shield was excavated, and this affected time is related to the viscoelastic property of soil, the parameters of the existing tunnel and structure.

研究表明,盾构隧道对邻近建筑物及桩基的影响是时间相关的,隧道在开挖后一段时间内对周边建筑及桩基产生影响,其影响时间的长短与周边土体的粘弹性性质以及隧道和邻近建筑的参数有关。

In this dissertation, based on the existing theory, having studied the bored pile's working behavior about single pile and group pile、interaction of high-rise building with pile-raft foundation, via test in situ and theoretical analysis.

本论文在总结了国内外研究现状的基础上,通过原位测试和理论分析,对西安地区两种不同施工工艺的灌注桩的单桩、群桩工作特性,高层建筑桩筏基础的共同工作等进行了研究。

At present, in all of the building codes, the calculation and designing method of the pile-cap is based on the assumption that the pile cap is absolutely rigid.

现行规范中关于桩~承台体系的分析和计算方法都是建立在绝对刚性承台假定之上的,此即所谓的&m 法桩~绝对刚性承台法&。

第1/7页 1 2 3 4 5 6 7 > 尾页
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。