When arranging the construction progress plan , in accordance with the contract period of the bridge pier, and the hollow plate ,bridge flooring and other,I arrange the flowing Construction,I draw the construction program Bar Graph and network map,then I adjust the construction progress to progress and resources.

安排进度计划时,按照合同工期对墩台,空心板以及桥面铺装等组织了流水作业,并绘制了施工进度计划横道图和网络图,之后从工期和资源两方面对进度计划进行了调整和优化。

Combining the construction of the flexible breasting dolphin pile s in the Oil Pier-II Project of Karachi Port in Pakistan,the article mainly expatiates the comparison and selection of construction schemes for large-diameter hole boring and installation of breasting dolphin piles in the case of a lack of construction equipment.

通过对巴基斯坦OP-II码头工程柔性靠船桩的施工实践,阐述在施工设备缺乏的情况下进行大直径钻孔和吊装靠船桩的施工方案比选,以及综合考虑施工情况探讨靠船桩的设计新思路,并在不影响靠船桩正常使用的条件下对柔性靠船桩原设计作出适当变更,供柔性靠船桩设计和施工参考。

Referring to relevant literatures, the author realize the peculiarities of the nonnavigable spans of the Lingding yang bridge and try to give a systematic answer to its design and construction, including foundation, pier shaft, construction and principle of offshore work platform, superstructures and design of movable falsework and so on.

通过参考有关文献,分析了伶仃洋大桥非通航孔的工程特点,并系统地回答了从其基础施工到架梁完成过程中的一系列问题,包括桩基,承台、墩身及顶帽的施工,海上工作平台的构造及工作原理,梁的设计、制造和安装,活动脚手架的设计等。文中的设计过程均属于概念设计的范畴。

In the process of the solid parts of hollow pier construction, hole is reserved in the pier wall, solid steel corbels is installed in the hole as vertical support piers for the top construction of cast in place solid pier .

结合桥梁施工实例,介绍在施工薄壁空心桥墩墩顶实心部位时,采用在墩壁预留孔,孔内安装钢棒牛腿作为现浇实心墩顶的竖向支撑,进行空心墩顶部实心段施工的工艺。

Based on engineering practice,the paper introduces in detail the construction technique of abutment on pier top and temporary buttress,the construction technique at 0 section,the construction technology of casting concrete for cantilever and cast-in-situ concrete section for side span and the construction technology at closure section ,sums up the key construction technique of conti.

结合该工程实际,对墩顶支座及临时支墩施工技术、0号段施工技术、悬臂浇筑及边跨现浇段施工工艺、合龙段施工工艺等进行了详细的介绍,总结了大桥连续刚构关键施工技术,实践证明这些施工工艺和控制技术是可行的,为以后类似工程提供了借鉴。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Combined with the course of construction of Songyuan Longhua Songhua River super-sized bridge,methods of temporary anchor of beam and pier,structure and function of the form traveler ,and improved structure for the pasret-hung casting of the 1# pier base were introduced in this paper.

结合松原龙华松花江特大桥的施工过程,介绍墩梁临时固结的措施,以及挂篮的细部构造及其各部件的功能,并对1#块悬臂浇注时,挂蓝的改进进行阐述。

To increase the construction process of rigid bridge hollow thin wall high pier ,it puts forward the large mode design method in the construction of hollow thin wall high pier ,and mainly discusses the process of mode design and the checking calculation combined with the practice,and this solves the problems of accelerating the construction of pier.

为了提高刚构桥空心薄壁高墩墩身施工进度,提出了在空心薄壁高墩施工中的大模板设计方法,并结合实例对模板设计的过程和验算进行了主要论述,有效解决了加快墩身施工进度问题。

Combined with experience in the past,it introduces the constructing methods of slanting stone arch bridge from aspects including basement process,basic construction,pier construction,arch support and arch circle construction.

结合以往的经验,从地基处理、基础施工、墩台施工、拱架、拱圈施工等多方面就斜交石拱桥的施工方法进行了详细介绍,并通过工程实例进行了说明,可供类似工程参考。

第1/3页 1 2 3 > 尾页
推荐网络例句

In the United States, chronic alcoholism and hepatitis C are the most common ones.

在美国,慢性酒精中毒,肝炎是最常见的。

If you have any questions, you can contact me anytime.

如果有任何问题,你可以随时联系我。

Very pretty, but the airport looks more fascinating The other party wisecracked.

很漂亮,不过停机坪更迷人。那人俏皮地答道。